Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Exploring the applicability of responsible research and innovation for mine transitions

    By S Worden, A Lee Zhi Yi, E Sellers, G Corder, A Littleboy

    The global shift towards decarbonisation is driving competition for the extraction of critical minerals such as nickel, lithium, and copper. To meet this demand, new mines are being developed while mi

    Aug 2, 2023

  • AUSIMM
    Phytostabilisation and Phytomining – Principles and Successes

    By R L. Chaney, M Mahoney

    Mine and ore beneficiation wastes and smelter contaminated soils often cause phytotoxicity and threaten adverse environmental effects if not remediated. Science has clarified both the risks from soil

    Jul 16, 2014

  • AUSIMM
    The Fitzroy Aqua-Eco Health Project

    By C Sellens, L D. Fabbro, S Vink

    The Fitzroy River Aqua-Eco Health Project is a collaborative research project between the Central Queensland University, the University of Queensland and BMA. It is designed to assess the aquatic ecol

    Nov 26, 2013

  • AUSIMM
    "Modelling Grade Variation in Crushed Ore at Cadia Ridgeway and Its Potential Consequences for Bulk Ore Sorting"

    By A McGann, P J. Coghill, D Miljak

    "It is widely accepted that bulk ore sorting could provide a step change in processing of low-grade ores. For this to be achieved a rapid, accurate bulk sensor of grade is required as well as sufficie

    Jun 15, 2016

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden Opportunity

    By W Valery, A Jankovic

    A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci

    Oct 29, 2012

  • AUSIMM
    The critical role of mine planners in the evolution of closure at BHP

    By J Heyes, R Getty, M Sanapala

    Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti

    Sep 18, 2023

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in China

    By S Zheng, Y Zhang, Z Wen, S Ma

    Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause

    Jul 10, 2012

  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    The Application of Numerical Modelling to the Assessment of the Potential for, and the Detection of, Spontaneous Combustion in Coal Mines

    pNumerical modelling has been used to examine the relationship between the results of two commonly used methods of assessing the propensity of coal to spontaneous combustion, the R70 and Relative Igni

    Jan 1, 2005

  • AUSIMM
    Hoist Ropes for Double-Drum Winders ù A New Concept

    By R Verreet

    In April 2000 Mount Isa Mines installed hoist ropes of a new design on the double-drum winder at their P49 shaft. The ropes, CASAR Duroplast, were about three times as expensive as the previously used

    Jan 1, 2005

  • AUSIMM
    Application of the Heavy Suspension Technique for Ore Beneficiation Plant Feed Characterisation from the Southern Middleback Ranges

    By J Jasper, L Koroznikova, J Begelhole

    This paper outlines a comparison of heavy liquid and heavy suspension separation methods for iron ore characterisation.As part of Arrium MiningÆs program to improve its knowledge of ore types being pr

    Sep 29, 2013

  • AUSIMM
    Roof characterisation for hazard planning at Oaky North mine using geophysical data

    By B Vorster, T Medhurst, A Huey

    Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional

    Nov 29, 2022

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium melts

    By M A. Rhamdhani, R Z. Mukhlis

    Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,

    Aug 21, 2024

  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • AUSIMM
    A Methodology for Geometallurgical Mapping and Orebody Modelling

    By L Keeney

    Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological

    Sep 5, 2011