Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reducing the Cost of Tunnel Design in AustraliaBy B Rouvray, R Bertuzzi
The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document
Sep 17, 2014
-
The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)By Jardine G, Woodall C
The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir
Jan 1, 1998
-
The Geochemical Exploration for Golf Using Instrumental Neutron Activation AnalysisVarious factors influence the exploration geologist or geochemist in his choice of.an analytical method for gold and other elements which may help him find the elusive gold deposit. One of the fir
Jan 1, 1987
-
Estimation of rock brittleness for jointed specimens under cyclic triaxial loadingBy P Khalkho, M Singh
Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t
Nov 29, 2022
-
Design and Operation of the Dewatering System for the Lochiel Trial PitBy Sullivan TD, Redman PG
AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (
Jan 1, 1988
-
A New Set of Semi-Empirical Equations for Modelling Flotation Deinking of Recovered Papers ù From Laboratory to Pilot PlantBy P Ottenio, B CarrT
In the last 40 years, the froth flotation process widely spread in the paper industry becoming the dominant technology for ink removal from recovered paper slurries and cellulose fibres recovery. Most
Jan 1, 2005
-
Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently
Jan 1, 1924
-
Notes on the Working of the MacArthur-Forrest Process for Extracting GoldIn redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,
-
The Strategic Dilemma for Mineral Engineering Service Providers to the Resources Industry in the Present High Demand EnvironmentBy A J. Broome
Since 2003, there has been an unprecedented growth in the demand for engineering, technical and project services in the mineral industries. This demand for services became evident in Australia earlier
Jan 1, 2007
-
In-Pit Crushing and ConveyingBy I Lourel
In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t
Jan 1, 2009
-
Energy and Water Requirements in the Treatment of Refractory Gold OresBy R Dunne, J Dodd, J Snyder, F Roberto
Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and
Sep 26, 2013
-
The Filblast Cyanidation ProcessBy Bodnaras G. E, Sceresini P. A
The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th
Jan 1, 1994
-
The Electrolytic Refining and Smelting Company of Australia LimitedPower Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian
Jan 1, 1938
-
An Investigation of Air and Dust Flow Patterns Around the Longwall ShearerBy S Chaudari, T Ren, T Harvey
Management of respirable dust on longwall face remains a challenging issue for mine operators, particularly for the new generation of thick seam longwalls. A fundamental understanding of the airflow b
Jan 1, 2005
-
Flotation Purification of Kaolin Clay With Hydroxamate CollectorsBy S A. Ravishankar, W Perez
Flotation is one of the main concentration processes to purify kaolin clay via the removal of naturally occurring impurity minerals containing Ti and Fe. Currently, there are two types of collector ch
Jan 1, 2005
-
Coal Pillar Design Criteria for Surface ProtectionLarge areas of ground are permanently supported on coal pillars, both in extensive old workings and current drivages in active mining operations. Continued growth of civil infrastructure is resulting
Jan 1, 2005
-
X-ray Computed Tomography – a Geometallurgical Tool for 3D Textural Analysis of Drill Core?By M A. Jardine, J A. Miller, M Becker, M Harris
"Although the role of texture has been increasingly recognised as a geometallurgical indicator of ore characteristics and their variability, the ability to appropriately quantify and correlate it with
Jun 15, 2016
-
BHP Billiton Iron Ore Car Dumper 4 - Temporary WorksBy D Ford
BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow
Jan 1, 2007
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium MineralisationBy M Zengerer
The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp
Aug 18, 2014