Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    High P:Metamorphism and its Relation to Deformation in the North D'Aguilar Block, SE Queensland, Australia

    By Holcombe R. J, Dobos S. K, Little T. R

    Blue amphibole-bearing rocks in the North D'aguilar Block of southeast Queensland occur either as relict pods and lenses within regionally extensive greenschist facies phyllites and schists or as

    Jan 1, 1990

  • AUSIMM
    Notes on the Working of the MacArthur-Forrest Process for Extracting Gold

    In redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • AUSIMM
    Quantifying segregation of minerals and metals in particulate materials using computed X-ray tomography and variography

    By G Gilchrist, S C. Dominy, T Jashashvili, R C. A Minnitt

    The grouping and segregation error is one of Gy’s seven errors that cannot be measured in any qualitative manner because of its transient and changing characteristics each time the sample is handled m

    May 9, 2017

  • AUSIMM
    Estimation of rock brittleness for jointed specimens under cyclic triaxial loading

    By P Khalkho, M Singh

    Rock masses when subjected to uniaxial or triaxial cyclic loading (eg in hydraulic running tunnels, during retrieval and injection of oil and gas from storage underground caverns and haulage roads), t

    Nov 29, 2022

  • AUSIMM
    A New Set of Semi-Empirical Equations for Modelling Flotation Deinking of Recovered Papers ù From Laboratory to Pilot Plant

    By P Ottenio, B CarrT

    In the last 40 years, the froth flotation process widely spread in the paper industry becoming the dominant technology for ink removal from recovered paper slurries and cellulose fibres recovery. Most

    Jan 1, 2005

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    An Investigation of Air and Dust Flow Patterns Around the Longwall Shearer

    By S Chaudari, T Ren, T Harvey

    Management of respirable dust on longwall face remains a challenging issue for mine operators, particularly for the new generation of thick seam longwalls. A fundamental understanding of the airflow b

    Jan 1, 2005

  • AUSIMM
    The Electrolytic Refining and Smelting Company of Australia Limited

    Power Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian

    Jan 1, 1938

  • AUSIMM
    Measurement and Control of the Mill Load in an Air-Swept Ball Mill Circuit

    By Sandvik

    Fine grinding in an air-swept ball mill working in closed circuit with a forced vortex air classifier has been investigated first in continuous laboratory and then in industrial scale. Results from

    Jan 1, 1995

  • AUSIMM
    Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently

    Jan 1, 1924

  • AUSIMM
    Coal Pillar Design Criteria for Surface Protection

    Large areas of ground are permanently supported on coal pillars, both in extensive old workings and current drivages in active mining operations. Continued growth of civil infrastructure is resulting

    Jan 1, 2005

  • AUSIMM
    Energy and Water Requirements in the Treatment of Refractory Gold Ores

    By R Dunne, J Dodd, J Snyder, F Roberto

    Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and

    Sep 26, 2013

  • AUSIMM
    Designing User Interfaces for the Mines of the Future – User Centred Approach

    By E Widzyk-Capehart

    The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed

    Nov 22, 2011

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • AUSIMM
    Use of Geostatistically-constrained Potential Field Inversion and Downhole Drilling to Predict Distribution of Sulfide and Uranium Mineralisation

    By M Zengerer

    The Basil Cu/Co deposit comprises a 26.5 Mt Inferred Resource of copper and cobalt, grading 0.57?per cent Cu and 0.05 per cent Co. It lies in the Harts Range, Central Australia, within the Riddock Amp

    Aug 18, 2014