Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Utilising Orebody Knowledge to Improve Comminution Circuit Design and Energy Utilisation

    By M S. Powell

    In this paper it is argued that we are entering a new mining era, based on considerably more challenging orebodies as we rapidly expand minerals production by exploiting previously uneconomic deposits

    Sep 29, 2013

  • AUSIMM
    A Case of Discrepancy Between Bore Values and Recoveries

    The care necessary to ensure a reliable estimate of average value from the individual values of a series of bore holes sunk in any alluvial deposit containing coarse gold was well exemplified in check

    Jan 1, 1929

  • AUSIMM
    Treatment of Sulfide Tailings from Base Metal and Gold Operations - A Source of Saleable By-Products and Sustainable Waste Management

    By D A. McCallum

    With depth, many gold ores become sulfidic with minerals such as pyrite, pyrrhotite and arsenopyrite becoming prevalent. In addition, many underground gold mines use tailings backfill to bind and stor

    Jan 1, 2007

  • AUSIMM
    Accurately estimating heat load from conveyed rock

    By M A. Tuck

    The dominant heat loads in a deep underground mine are the surrounding rock mass, autocompression and machinery. In addition heat can be contributed to by other sources. Many block cave, sublevel cave

    Aug 28, 2017

  • AUSIMM
    The Estimation of Titanium in Beach Sands

    By Parkhurst D. H

    It is shown that a differential colorimetric technique can be used as a routine method for the estimation of titanium in beach sands, and their ore dressing products. The method will tolerate the pres

    Jan 1, 1957

  • AUSIMM
    Gympie Gold ù The Revival of the Monkland Mine

    By D Kahler

    Modern gold production from the Gympie Goldfield commenced in 1995 with the first production from the Monkland Mine. The primary ore target was the 2.5 m wide Inglewood Fault ore zone, which was initi

    Jan 1, 2002

  • AUSIMM
    Why I don’t believe in reconciliation

    By S Dunham

    For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m

    May 24, 2023

  • AUSIMM
    Methods for Improving the Flotation Recovery of the Coarse Fraction of a Nickel Ore

    Methods for Improving the Flotation Recovery of the Coarse Fraction of a Nickel Ore

    Sep 13, 2010

  • AUSIMM
    Recent Investigations in Electrostatic Separation

    The beach sand industry is the only Australian mineral industry which, so far, has used electrostatic separation on a full commercial scale. The main application of the process is for the separation o

    Jan 1, 1954

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Integrating Blastholes into Exploration Data to Improve Coal Recovery and Modelling

    By H Stedman

    Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c

    Aug 18, 2014

  • AUSIMM
    Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales

    By Snowden D. V, Standing C. A, Ryba A, Bywater A

    McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant

    Jan 1, 1997

  • AUSIMM
    Automatic Material and Boundary Layer Detection During the Process of Mining on a Bucket Wheel Excavator

    By V Gau, L Overmeyer, M Kesting

    Economically efficient mining processes can be significantly assisted by the implementation of sensor technologies for the detection of materials and boundary layers between materials inside the strat

    Sep 26, 2011

  • AUSIMM
    Prospective Electric Pulse Processes for Sustainable Processing of Mineral Raw Materials

    By V A. Tsukerman

    Prospects a new energy saving method for an efficient destruction of the sturdy and hard materials (rocks, ores, frozen soils, concrete blocks, etc) û the Electric Pulse Discharge (EPD) method of mate

    Jan 1, 2002

  • AUSIMM
    Status of Outburst Research at the University of Wollongong

    By D Bruggemann, F Sereshki

    There has been an ongoing research on coal and gas outburst for the past two decades at the School of Civil, Mining and Environmental Engineering, University of Wollongong. Research study began with a

    Jan 1, 2005

  • AUSIMM
    The Production of Cement in Australia

    By Benkendorff P. N

    Cement production in Australia approximates 6.5 million tonnes per year. Cement clinker is sourced from 15 plants which operate 28 kilns. Cement grinding is conducted at 14 of the clinker plants

    Jan 1, 1989

  • AUSIMM
    A Study of Extracting Vanadium from Stone Coal Using Cyclic Oxidation

    A Study of Extracting Vanadium from Stone Coal Using Cyclic Oxidation

    Sep 13, 2010

  • AUSIMM
    Carbonate in Synthetic and Biological Apatites

    By X Liu

    The crystal chemistry of carbonate in Ca apatites, including Na-free and Na-bearing hydroxylapatite (CHAP) and Na-bearing fluorapatite (CFAP) and chlorapatite (CCLAP), has been investigated by Fourier

    Jan 1, 2008

  • AUSIMM
    The Geologist in an Operating Mine

    Mining, like most other businesses, is based upon capital assets; and the primary cap- ital of any mining company is its ore reserve. A company's survival and growth is, thus, dep- endent upon it

    Jan 1, 1975

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022