Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design, Commissioning and Operation of Elura's Larox Pressure FiltersBy Jagger ND
Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain
Jan 1, 1985
-
Gold Recovery Using Riffle Tables: A Review of Current Practice on the West Coast with Reference to Contemporary ResearchDespite the recovery of approximately six million ounces of alluvial gold from the West Coast of the South Island, New Zealand during the last 140 years, a great deal of this having been obtained via
Jan 1, 1992
-
Open Pit Production Scheduling Optimisation - Why the Mining Industry Needs a New Phase Design ApproachThe long-term production schedule of open pit mines that maximises the net present value (NPV) of a given project relies on the proper design of phases (pushbacks) within the ultimate pit limits. Ther
Dec 6, 2010
-
Do All MetPlants Work Well? PlantMets can Ensure They DoBy P Cameron
MetPlant conferences have focused on ensuring mining projects are well designed then optimised to operate safely and effectively at the top end of world’s best practice to ensure shareholders are not
Sep 7, 2015
-
Evaluation of Underground Coal Mine Communication and Tracking SystemsBy C Harwood
Underground coal mines in the United States are in the process of completing installations for tracking and communication systems, mandated by Congress after a number of recent coal mine disasters. Ye
Nov 22, 2011
-
Experience with Boiler Furnace Walls at Mount Isa Mines Limited's Power PlantBy Crawford M
During the initial development of Mount Isa Mines power was supplied from a temporary power plant situated near the Man & Supply Shaft. The main power plant was placed in service early in 1931 and
Jan 1, 1939
-
Evolution of Semi-Autogenous Grinding Mill Control at Century ZincBy A Prinsloo, R Tewu
Automatic control of semi-autogenous grinding (SAG) mills has often been considered complex. Recent experiences at Century Zinc (worldÆs second largest open pit zinc mine) refute this. Together with o
Jan 1, 2009
-
Private Coal Mining in the WaikatoCoal mining in New Zealand is principally a State-owned and controlled operation where the State produces 70 per cent of the coal in New Zealand and 65 per cent of coal mined in the Waikato. The State
Jan 1, 1984
-
Mount Morgan Ore ConcentrationBy Wilson O. A
TABLE OF CONTENTS1. Introductiona. Process Changes since 1939.b. Current Practice.2. Ore Characteristicsa. Copper Minerals.b. Gold Occurrence.3. Treatment of High Grade Acid Orea. The Ore Treatment Pl
Jan 1, 1952
-
Minimising the water loss associated with mine tailings disposalBy C Vuillier, A Roshdieh
Water is the main medium for removing impurities from iron ore during wet processing to achieve a higher quality product. However, there is a substantial increase in freshwater consumption due to an i
Jul 24, 2017
-
South Mine M.M.M.-A Description Of OperationsBy Kidd A
The operations of Minerals Mining and Metallurgy Limited's (MM) South mine including both the mining and metallurgical aspects are described. After treating the history of the company, the ge
Jan 1, 1983
-
Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai MineBy D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah
Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected
Aug 24, 2015
-
Petrology of the Broken Hill Lode and its Bearing on Ore GenesisLIST OF CONTENTSAbstractIntroductionSelected Sections of the Broken Hill LodeLocality PlansPetrology1. Zinc Corporation Mine: DDH. 5.98, section 30, No. 26 level2. Zinc Corporation Mine: DDH. 838, sec
Jan 1, 1959
-
Globally Optimising Open Pit and Underground Mining Operations under Geological UncertaintyBy R Dimitrakopoulos, K Kawahata, L Montiel
A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci
Nov 24, 2014
-
Valuation of Mineral Properties in New Zealand with Examples in Coal and Alluvial GoldThe aim of this paper is to broadly review the purposes of valuations and the methods used to calculate them. Examples are provided by coal and alluvial gold properties. Important factors are consiste
Jan 1, 1988
-
Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case StudyBy I Elias, E Moya, S Chaffer
This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage
Jul 13, 2015
-
Development in Modern Refractories Practice and ApplicationA general outline of the significant features in the quality and manufacture of the more common refractories is given. Where possible, linkage between quality development and control and service appli
Jan 1, 1961
-
The Waihi Gold Permitting Experience: Would the Proposed Changes to the Resource Management Act 1991 have made a Difference?The areas of concern lay in the processing of, and the subsequent hearing into, Waihi Gold's resource consent applications to extend Martha Mine. The proposed amendments to the Resource Managemen
Jan 1, 1998
-
Mitigation of Post-blast Fume in Soft Ground and Wet ConditionsBy S S. Kanchibotla, E J. Sellers, L Julian, A Musunuri
Fume events in coalmines are typically associated with wet conditions, soft ground and deep holes. An ACARP research project used laboratory and field testing combined with literature reviews, numeric
Aug 24, 2015
-
First Mexican Coal Mine Recovery After Mine Fire, Esmeralda MineThe fire started in the development section from methane released into the mine through a roof-bolt hole. The date was 8 May 1998. The flames spread quickly as the coal was ignited. After eight hours
Jan 1, 2005