Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Water Treatment Upgrade at Sepon MineBy D McClelland, R Whittering
Minerals and Metals Group (MMG) subsidiary Lane Xang Minerals Ltd operates a single site copper and gold mine near Sepon in Lao PDR. Gold production commenced in 2002 and first cathode copper producti
Jan 1, 2009
-
Optimisation of an Image Analytical System for Bulk Materials Using the Theory of SamplingBy K H. Esbensen
Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina
Jan 1, 2005
-
Determination of the handleability index of adhesive bulk materialsBy M Carr, K Williams, W Chen, J Plinke
The depletion of iron ore deposits at the face of the mine site dictates the necessity for the exploitation of formerly less attractive orebodies to meet the demand of the modern world. These orebodie
Jul 24, 2017
-
Justifying Slope Design Risks and CostsBy N M. Player, R P. Varden, E Jones
"An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t
Nov 15, 2016
-
Recovery of Metal Values from Complex Sulphide Concentrates of Copper, Lead and Zinc through Aqueous ChlorinationBy Paramguru R. K, Jena P. K
Increasing demand for copper, lead and zinc with continuous depletion of good grade ore reserves, warrants the need for utilization of lean and complex ores of these metals. There is worldwide effort
Jan 1, 1981
-
The Geology of Tinaroo Area, North QueenslandThe upper amphibolite-grade mctasediments of thc rinaroo area, North Queensland, form part of a regional aurcole to the large Tinaroo Batholith and are the stratigraphic equivalents of the Hodgkinson
Jan 1, 1982
-
Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit SlopesOwing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, includin
May 1, 2010
-
Presidential Address Mining on Private Property on the Goldfields of Western AustraliaIn several of the States of Australia, mining on private property has been seriously hampered by the fact that large areas of land have been alienated from the Crown before the discovery of gold or ot
Jan 1, 1901
-
Remnant Ore Model Generation and Categorisation Post-block Caving Extraction at Salvador MineBy F Farías, D Villa
Codelco’s Salvador Project has been operating a block/panel caving mine for more than 50 years. This underground mining method dynamically mixes the ore and dilution. As a result, forecasting grades i
May 9, 2016
-
Theory of Sampling – what’s next?By K H. Esbensen
The Theory of Sampling (TOS) has made remarkable strides and has witnessed a suite of achievements over its ~65-year history; especially in the last 15 years, since organised work began for the erstwh
May 9, 2017
-
Kinetics of the Gaseous Reduction of HematiteThe widely accepted kinetic model for the gaseous reduction of hematite is critically examined. The formation of the wustite layer during internal reduction cannot be explained in terms of solid-state
Jan 1, 1964
-
Golden Cross Mine - Mining and Processing Operations - Waihi, New ZealandThe Golden Cross mine is a Joint Venture between Coeur Gold New Zealand Limited, as Manager, and Viking Mining Limited. The mine is targeting Zero Lost Time Accidents as a goal. The Golden Cros
Jan 1, 1995
-
Learning from Simulation at Boddington Gold MineVarious methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity
Sep 26, 2011
-
Estimating Mine Operating Costs - Trials and TribulationsThe projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac
Jan 1, 1990
-
Recent Advances from the United Kingdom Tunnelling Industry - The A3 Hindhead ProjectBy T Rock
This paper looks at recent advances in the United Kingdom (UK) tunnelling industry with particular reference to the A3 Hindhead Project. A 1.8 km long twin bore tunnel is the centrepiece of the A3 Hin
Jan 1, 2008
-
Evaluating rheological features inside tumbling mills using DEM data previously validated against PEPT measurementsBy I Govender, T L. Moodley
Tumbling mills are grossly inefficient, using only 5 per cent of the total energy supplied for actual breakage. A significant proportion of this inefficiency is unavoidable owing to geometric limitati
Aug 24, 2022
-
A Strategy for Managing Acid Rock Drainage in Arid Climates ù The Mt Whaleback StoryBy P Waters, S Miller
BHPBilliton operates the Mt Whaleback Mine located in the semi-arid Pilbara Region of Western Australia. Approximately 200 Mt of net acid generating (NAG) material still remains to be mined. Acid Rock
Jan 1, 2003
-
Strong Acid Leaching and Filtration of Lead/Silver ResidueBy Adams R. W
A commercial scale strong acid leaching plant was commissioned at the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, a member of the Pasminco group of companies, in February
Jan 1, 1989
-
The Greymouth Coal ProjectThe Greymouth Coal Project is a proposal to mine by the application of proven hydraulic, and room and pillar underground mining methods; and to process the equivalent of an average of 1.7 million tonn
Jan 1, 1997
-
Enhancing the Business Environment for Prospecting, Exploration and Mining (Past and New Initiatives)By K L. Temel, W P. Player
The underlying message of this paper is that investment in prospecting, exploration and mining in New Zealand is welcomed. The Government's policy with respect to Crown owned minerals is for cont
Jan 1, 1997