Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Valuation Issues and Expert Reports

    By Carter D

    The Chairman of this afternoon's session is Dick Carter. This afternoon is the culmination of this conference. We've looked in the first session at regulation; in the second session at val

    Jan 1, 1989

  • AUSIMM
    Leaching Studies with Pentlandite and Pyrrhotite

    By Lavers G

    Factors governing the dissolution of nickel and iron in pentlandite and pyrrhotite concentrates from Mt. Windarra were studied for aqueous solutions at normal temperatures and pressures. The effects o

    Jan 1, 1976

  • AUSIMM
    Sulphur Deposits of New Zealand

    Owing to the increased consumption of sulphuric acid; Australian manufacturers have, from time to time, been seeking for a satisfactory source of sulphur that would make them independent of foreign su

    Jan 1, 1925

  • AUSIMM
    BATMIN - Business Analysis Tools for Mining

    BATMINÖ, BATMINEÖ, BATMINDÖ are an abbreviation for Business Analysis Tools for Mining, Mine Evaluation and Mine Design respectively. BATMINP are proprietary tools customised to suit individual clien

    Dec 6, 2010

  • AUSIMM
    The Downward Trend of Mining - Infrastructure Costs

    By Glassock C. D

    Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co

    Jan 1, 1997

  • AUSIMM
    Pike River - Environmental Protection and Enhancement

    ThePike River coal field is located between 700 and 1000 m above sea level on the West Coast of the South Island. The area contains a resource of some 60 million tonnes of coal in a single coal seam a

    Jan 1, 2003

  • AUSIMM
    WhatÆs Driving Natural Revegetation Patterns on Overburden at Wangaloa Coal Mine?

    By D Craw, S Clearwater, S Hammit, C Smith

    Prior to rehabilitation, plant cover on quartz gravel overburden at Wangaloa coal mine was highly patchy. Stabilisation techniques have since considerably altered the condition of the main overburden

    Jan 1, 2004

  • AUSIMM
    On-Line Sensor for Measuring Gas Velocities in Laboratory-Scale Flotation Cells

    By K Heiskanen, R A. Grau

    Gas velocity (Jg) measurements conducted close to the froth-pulp interface over the cross-section of a flotation cell reveal how efficiently the incoming air is being dispersed throughout the volume o

    Jan 1, 2005

  • AUSIMM
    The Dwight-Lloyd Blast Roasting Section for Sintering Lead Ores at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia

    This Department handles all ores prior to blast-furnacing, the object of the operations being to mix the lead-bearing material with fiuxes, eliminate sulphur from the mixture, and produce a homogeneou

    Jan 1, 1937

  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    The evolution of SAG shell lining and introduction of the skip row design

    By M Swart, H Ståhlbröst, P Toor

    Development of SAG liners has always been a strong focus and interest in mineral processing as SAG liners significantly impact on plant performance (throughput and grind size), material costs and plan

    Sep 11, 2017

  • AUSIMM
    Mount Morgan Limited Gold Clean-up Practice at Oxide Mill

    At the present time this plant is treating by direct cyanidation 1,000 tons of ore from Open Cut mining and dumps, and 1,200 tons of current flotation tailing obtained from the Sulphide Mill, per day.

    Jan 1, 1939

  • AUSIMM
    Regional scale structural influence on the Ernest Henry orebody below current mining levels

    By E Philippa, B Miller

    Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, a

    Mar 22, 2022

  • AUSIMM
    Alluvial Gold Deposits and Mining Opportunities on the West Coast, South Island

    By P M. Hancock

    The West Coast contains one of the world's giant placer gold deposits with production since the 1860s totalling some six million ounces (present day value NZ$ 3.6 billion). The deposits have been

    Jan 1, 1985

  • AUSIMM
    Treatment of Gold-Bearing Oxide High-Clayish Ores

    Treatment of Gold-Bearing Oxide High-Clayish Ores The analysis of modern state of treatment technologies of gold-bearing oxide high-clayish ores showed that the main method applied both in Russia and

    Sep 13, 2010

  • AUSIMM
    Upgrading of Iron Ores by Wet High Intensity Magnetic Separation (WHIMS)

    By Misra V. N, Cheng C. Y

    Two types of Mt Tom Price hematite iron ore from Hamersley Iron P/L were tested using a Humboldt Wedag Jones P40 wet high intensity magnetic separator (WHIMS). The parameters tested were magnetic i

    Jan 1, 1999

  • AUSIMM
    Accurate Underground Wireless Ranging and Tracking

    By M Hedley

    Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur

    Mar 21, 2011

  • AUSIMM
    Breakage Characteristics for Ores for Ball Mill Modelling

    By Whiten W. J

    An investigation on the breakage characteristics of closely sized orc samples at different levels of input energy was carried out to determine an appearance function for possible use in ball mill mode

    Jan 1, 1983

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • AUSIMM
    Collection and Application of Geological Data for Design of Underground Openings at Mount Isa

    By Blair JR

    The tunnel alignments investigated for the Gosford Regional Sewerage Scheme are located in the Terrigal Formation and are covered for most of their length by a thick blanket of soil and weathered

    Jan 1, 1976