Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine Ventilation Planning of BHP Steel Division CollieriesThe design of mine ventilation systems for the BHP Steel Division Collieries is based on the acquisition of ventilation survey data for the establishment of a realistic computer net- work model. The
Jan 1, 1983
-
High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon StoryBy D Morton, G Wallace
"Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold
Nov 15, 2016
-
Mine Fill Research And Investigations At Rit's Division Of MiningAfter a short presentation of the Division of Mining at the Royal Insti- tute of Technology, Stockholm, Sweden, the author presents some of-the fill research carried out at the Division. Literatur
Jan 1, 1973
-
Risk Management ActionTwo examples of risk assessment and risk management in action are discussed. The first is in a management context in relation to Kingsgate Consolidated LtdÆs Chatree operation in Thailand. Kingsgate h
Jan 1, 2004
-
The Geology of the Rum Jungle Uranium DepositsThree major and two minor uranium deposits 'have been worked by open out mining since the discovery of ,the Rum Jungle field in 1949. Total production has been about 9679000 tons of uranium ore
Jan 1, 1968
-
Dependence of Flame Front Speed on Iron Ore Sintering ConditionsBy J Zhao, C E. Loo
The flame front is a narrow region in the iron ore sintering bed where coke particles combust. The maximum flame front temperature is as high as 1400°C. At high temperatures, the sinter mix compo
Jul 13, 2015
-
Features of an Intact Fossil Hydrothermal System and Implications for Gold Mineralisation: Onemana, Coromandel Peninsula, New ZealandBy M R. Stevens, W Mori, G B. Boswell
The Onemana prospect is located on the eastern Coromandel Peninsula, North Island, New Zealand. Systematic exploration involving surface geological mapping, geophysics, rock and soil geochemistry, rev
Jan 1, 1995
-
Dynamic Hydrothermal Modeling at the Renison Tin MineDynamic hydrothermal modeling is a tool that can aid in studying problems associated with hydrothermal ore deposits and can help increase our understanding of the spatial distribution of ore withi
Jan 1, 1987
-
Reserve Data for Project PlanningEfficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v
Jan 1, 1987
-
Submerged Combustion Technology* Applied to Copper Slag TreatmentBy Leahy GJ, Wright DJ, Player RI
The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r
Jan 1, 1978
-
George Fisher Mine - Feasibility and ConstructionBy G S. B Karunatillake
Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million
Jan 1, 2000
-
Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in JarositeBy A M. L Smith, W E. Dubbin, K A. Hudson-Edwards
Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an
Jan 1, 2008
-
The Role of Geology and Exploration Within the Mining Cycle at the Osborne Mine, NW QueenslandBy P Voulgaris
The Osborne Mine commenced production from an open pit in December 1994 with the first ore being hauled from underground one year later. Currently all ore is hauled up a decline by trucks until the sh
Jan 1, 1998
-
A New Method for Coal Pillar DesignA failure criterion for coal is proposed in which a distinction is made between brittle and "pseudo-ductile" failure. This criterion is then used in the development of new equations for coal pillar
Jan 1, 1986
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Value Tracking From a Financial PerspectiveBy M Warren
The professional geologist or engineer on a mining operation has a particular view of their operation. This is based on the factors of the operation that have a direct impact on the daily work program
Jan 1, 2002
-
Rotary Boring and Resin Bolting at Metropolitan CollieryBy Vnenk L, Hargraves AJ
Metropolitan Colliery has some areas of roof where immedi- ate support is required in development. The disadvantages of percussive roof bolting at the face have led to recent produc- tion trials with
Jan 1, 1971
-
Mine-to-Mill Optimisation ù Research and PracticeMining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v
Jan 1, 2000
-
The Disposal of Concentrating Mill Residues at Broken Hill, N.S.W. with Particular Reference to the Broken Hill South LTD.AT Broken Hill, N.S.W., where flotation is tbe final stage in concentration, the gangue minerals are discharged as an aqueous pulp, and water recovery from the pulp being essential, provision must be
Jan 1, 1927
-
Convergence Tectonics and Sediment Subduction Process Along the Peru Trench*Long-range side-scan sonar and conventional geophysical data for the Peru Trench region (8`S-15¦S latitude) have been analysed. The data show that the Peru Trench is a site of sediment subduction wher
Jan 1, 1990