Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Maximising the Output of a Surface Bulk Air Cooling Installation on a South African Mine

    By T Baard, A Pieters

    This paper deals with the design and implementation of a 17 MW (nominal) surface cooling installation at Impala Platinum No 14 shaft located in Rustenburg, North West Province, South Africa.The coolin

    Jan 1, 2005

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    Submerged Combustion Technology* Applied to Copper Slag Treatment

    By Leahy GJ, Wright DJ, Player RI

    The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r

    Jan 1, 1978

  • AUSIMM
    Mine-to-Mill Optimisation ù Research and Practice

    Mining companies around the world are seeking methods to coordinate operations between the mine and the concentrator to achieve an overall improvement in enterprise performance. In several instances v

    Jan 1, 2000

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)

    By Aiming Z, Shenyi S, Xialei W

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill

    Jan 1, 1998

  • AUSIMM
    The Role of Geology and Exploration Within the Mining Cycle at the Osborne Mine, NW Queensland

    By P Voulgaris

    The Osborne Mine commenced production from an open pit in December 1994 with the first ore being hauled from underground one year later. Currently all ore is hauled up a decline by trucks until the sh

    Jan 1, 1998

  • AUSIMM
    Staurolite Product Development

    By S Benson

    Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is

    Jan 1, 2001

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Rotary Boring and Resin Bolting at Metropolitan Colliery

    By Vnenk L, Hargraves AJ

    Metropolitan Colliery has some areas of roof where immedi- ate support is required in development. The disadvantages of percussive roof bolting at the face have led to recent produc- tion trials with

    Jan 1, 1971

  • AUSIMM
    Applying Modular Transporters to Relocate Large Hydraulic Excavators

    By B Flynn, P Knights

    Low-loaders or 'floats' for relocating equipment in surface mines are limited to a capacity of approximately 350 t. In the iron ore industry it is desirable to be able to rapidly relocate ex

    Jan 1, 2009

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • AUSIMM
    De-bottlenecking Iron Ore Transportation from Mine to Plant

    By T Tan, C P. Holmes, C E. Hartford

    Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin

    Jul 13, 2015

  • AUSIMM
    Convergence Tectonics and Sediment Subduction Process Along the Peru Trench*

    Long-range side-scan sonar and conventional geophysical data for the Peru Trench region (8`S-15¦S latitude) have been analysed. The data show that the Peru Trench is a site of sediment subduction wher

    Jan 1, 1990

  • AUSIMM
    The Disposal of Concentrating Mill Residues at Broken Hill, N.S.W. with Particular Reference to the Broken Hill South LTD.

    AT Broken Hill, N.S.W., where flotation is tbe final stage in concentration, the gangue minerals are discharged as an aqueous pulp, and water recovery from the pulp being essential, provision must be

    Jan 1, 1927

  • AUSIMM
    From Operational to Strategic Management

    Mining companies in Australia have grown in size and complexity over the past 20 years. The same period has seen exten- sive changes in the operating environment, with greater competition and intens

    Jan 1, 1980

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Lithoprobe û Multidisciplinary Studies of Continental Evolution: An Example from Western Canada

    LITHOPROBE is a national, collaborative research grogram with the general objective of understanding the teotectonic evolution of the North American continent through multidisciplinary lithospheric st

    Jan 1, 1990

  • AUSIMM
    Working Capital Requirements for Resource Projects

    By Bowra N

    Working capital is best described as money that must be supplied from a company's treasury to buy inventories for raw materials and finished products and to provide credit to customers who ha

    Jan 1, 1986

  • AUSIMM
    Challenges facing non-ferrous metal production

    By P Taskinen, D Lindberg

    The increase in metals demand in the electrifying globe means significant growth in the smelting of copper, nickel, zinc, and lead, produced from primary sulfide sources or using sulfide mattes as the

    Aug 21, 2024