Applications of Exhaust Steam Turbines to The Power Plants of Mines.The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes
Jan 1, 1911
-
The Implementation of Paste Fill at the Henty Gold MineBy C Woodall, G Jardine
The Henty Gold Mine, located in Western Tasmania uses innovative solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several environm
Jan 1, 1998
-
Continuous Monitoring Techniques for Environmental Control of Waste Water Discharge at Northern Territory Mine SitesBy Mine F. J, Woods P. H
The Top End of the Northern Territory lies in the monsoonal zone and receives rain during the November-April period. Initially, at the start of the wet season, rain storms are localised, but, follow
Jan 1, 1994
-
Formalised Blasting Rules: A Case-Specific ApproachBy D Nourry
Optimising the blast is a major issue in the blasting business. It generally means acting on the blasting pattern (drilling, charging, detonating) in order to get a given æresultÆ. This result may eit
Jan 1, 2001
-
Investigation of Shield Face Stability by Transparent Soil ModelsBy M Ahmed
Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u
Mar 8, 2011
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
Sustainable Flood Management ù A Case StudyBy I F. Wood
Planning for flooding and assessment of flood impacts are important requirements for mining projects, as they are also for other types of development. With more intense development and concern from th
Jan 1, 2003
-
Breccia Formation and It's Relation to Gold Mineralization at Mount Kasi, FijiThe Mount Kasi gold deposit in Vanua Levu represents an epithermal, high sulphur, gold-enargite system occurring within a volcanic caldera of Middle to Upper Miocene age. High level breccia pipes
Jan 1, 1987
-
Selective Leaching of Low Grade Middlings from Lead-Zinc FlotationBy Manlapig EV, Lawson F, Clarkson CJ
A low grade middling sample from Mount Isa, Australia, assaying 31.7 per cent zinc, 12.9 per cent lead and 14.5 per cent iron was leached under atmospheric pressure in sulphate and sulphate-chloride
Jan 1, 1993
-
The Obuasi Gold Mine - A Mine Under ChangeBy S C. Goel
The Obuasi Mine in Ghana, West Africa is the largest producing gold mine in Africa, outside South Africa. The mine has changed from a mine producing from narrow vein, high grade quartz orebodies to a
Jan 1, 2000
-
Review of the Mobile Miner at Isa MineThe search for an efficient and economic machine to excavate hard rock continues. Development of the Robbins Mobile Miner commenced in 1983 with the formation of a joint venture between Mount Isa
Jan 1, 1988
-
Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLACBy B Ghahreman‐Nejad, M Munro
Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an
Jul 1, 2021
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Dynamic Melting and Mixing Processes in the Mantle Wedge - Insight from Numerical ModellingBy D Yuen, J A. D Connolly, T V. Gerya
Recent works suggest that dehydration of subducting slab and consequent hydration and partial melting influences the dynamics of mantle wedge. Plums originating form the subducting slab due to Rayleig
Jan 1, 2008
-
Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast TechniquesBy D Miller, M Dowling, R Domotor
"This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj
Sep 17, 2014
-
Materials Handling at Olympic Dam Mine - Olympic Dam Aiming for æGoldÆWMC Limited, owner/operator of Olympic Dam, the worldÆs largest underground uranium mine and the fourth largest underground copper mine has now completed an expansion that has been classed as a benchm
Jan 1, 2000
-
Improved forged grinding media performance with carbon content greater than 1.0%By R Bose, M Bovell, G Cheong
Grinding media is a major consumable in mineral processing and therefore decreasing costs associated with its consumption is regularly considered a key goal for the minerals processing industry. Grind
Aug 29, 2018
-
Facilitating Continuous Expansion of a Bulk Materials Handling FacilityBy P Rourke
In this climate of increasing demand for commodities, it is becoming necessary to expand and optimise existing bulk material handling facilities in order to increase capacity to satisfy demand. Produc
Jan 1, 2005
-
Resue or Split Face Firing - Trial Results from Hillgrove MineResue or split face firing has the potential to separate ore and waste rock into separate muck piles within a stope. Thus split face firing has the potential to reduce dilution of the ore stream to be
Aug 1, 2010
-
Filtration Test Work – Extracting the Whole Story for Studies and DesignBy G Bickert
Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a
Aug 8, 2011