Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold OresBy M G. Aylmore, L W. de Klerk
Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref
Sep 26, 2013
-
The Great Artesian Basin ù Use and SustainabilityBy L M. Foster, J R. Kellett, G A. McMah
The Great Artesian Basin (GAB) contains one of the largest reserves of fresh water in the world. The volume in storage is enormous, being estimated at nearly 65 000 million megalitres (ML). Developmen
Jan 1, 2003
-
The Design and Construction of Intersection in Situ Tunnel Openings in the Murl ProjectThe four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include
Jan 1, 1981
-
The Characteristics And Interpretation Of Regional Magnetic And Gravity Fields In The Broken Hill DistrictOne of the most praninent Bouguer anomaly features in the Broken Hill District is the long wavelength high of 10-15 ngals above background which forms a northeast trending, oval zone sane 15 km by
Jan 1, 1983
-
Depression of Arsenopyrite Flotation and its Separation from Pyrite in Guangxi Shanhu Tin MineBy Shinnosuke U, Zhang HE, Qian X
In this paper it is recommended that pyrite is to be separated as froth from arsenopyrite by selective depression of arsenopyrite in strong alkaline medium (1), by oxidation with chlorinated lime (I
Jan 1, 1993
-
Problems of Sampling and Assaying in Mesothermal Lode-Gold Deposits ù Case Studies From Australia and North AmericaBy M J. Nugus, S C. Dominy
Mesothermal lode-gold deposits often pose problems during sampling because of their complex and erratic gold grade distribution, and the presence of coarse gold. Effective sampling and sample preparat
Jan 1, 2003
-
Ground Support Design and Application for Developing in Pastefill at BHP Billiton – Cannington MineBy J Li
Cannington Mine has been developing through paste backfilled stopes since the year 2000. These paste drives have been used as either production drill accesses or long-term bypasses. Prior to this stud
Mar 21, 2011
-
Managing Coal Loss Using Blast Models and Field MeasurementBy P Brown, M Nagarajan, A Green, P Dare-Bryan
Coal loss is an important issue at many coalmines, with losses of five per cent being common. The type of loss varies from mine to mine but is dependent on mine strata, the drilling and blasting proce
Aug 24, 2015
-
The Influence of Molecular Structure of Ampholytic Polymers on their Behaviour and Flocculation Activity in Sedimentation ProcessesBy Hoberg H, Schneider FU
The stability of suspensions can frequently be controlled only by the use of supplementary polymeric agents. Such methods date back to the time of the ancient Egyptians, who used natural rubber as
Jan 1, 1993
-
Contributed Discussion to "Some Comments on the Precision and Accuracy of Gold Analysis in Exploration" by Eric D. Bumstead (Proceedings No. 289, March, 1984)Dr Eric Bumstead is to be commended for his recent paper on gold analysis, published in the March 1984 Proceedings. It is not often that someone in industry, rather than academia, takes the time to co
Jan 1, 1984
-
The Detection of Xanthate in Solution and on Sulfide Surfaces to Help Understand and Improve Mineral Separation on Industrial PlantsBy R Dunne, D Yan
In flotation where a bulk flotation concentrate is produced or a gangue sulfide such as pyrite contaminates a concentrate, residual collector has to be removed from the sulfide surfaces to allow selec
Jan 1, 2005
-
Computer Generated Three-dimensional Block Models as a Guide to Mineral Exploration - Analysis of Structural Controls on Mineralisation at the Central Extended Gold Deposit, CracowMining software packages are used extensively in industry for resource estimation as well as for mine design and operation. Research undertaken in the W H Bryan Mining Geology Research Unit at the U
Jan 1, 1994
-
Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, IndonesiaBy H Indirawati, R Ayres, A Nur Kasnanto, S Konopa
As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current
Nov 21, 2018
-
Mineral Sand Mining Techniques in Western AustraliaThe Western Australian Mineral Sands Industry has tried a number of different mining methods to efficiently exploit the potentially very large reserves of mineral sands in this state.The size of the o
Jan 1, 1986
-
Phase equilibrium study in the sodium metasilicate primary phase field of PbO-Na2O-SiO2 system between 800 and 1000°CBy X Ling, M Barati, E Moosavi-Khoonsari
In the pyrometallurgical process of secondary lead recycling, a desulfurising agent, such as Na2CO3 is added to minimise the emissions of sulfur into the atmosphere, while silica is introduced into th
Jun 19, 2024
-
Styles of High-Sulphidation Gold, Silver and Copper Mineralisation in Porphyry and Epithermal Environments*High-sulphidation (HS) gold, silver and/or copper deposits are generated in both the epithermal and the upper parts of the underlying porphyry environments over vertical intervals of up to 2 km. The H
Jan 1, 2000
-
Characterizing Multiple Operating Points in Mine Ventilation SystemsBy Mutmansky J. M, Hartman H. L
Multiple operating points for mine fans are a problem that fan and mining engineers must constantly be aware of in mine/fan systems. In a single-fan system, unstable conditions can be avoided by r
Jan 1, 1988
-
Rock Cutting Tool Research and Development for Step Changes in Rock Mechanical ExcavationBy X S. Li
The modern mechanical excavation machines have enough power for cutting hard rock. The ‘bottle neck’ which limits the use of machines for hard rock excavation is ‘cutting tool’. To cut hard and abrasi
Nov 22, 2011
-
Environmental Considerations in Project Planning, Development and ManagementBy Hannan JC
Consent to develop and operate a new coal mine in New South Wales (NSW) will be conditional upon a number of environmental controls. In NSW, applications for any new major development associated w
Jan 1, 1986
-
An Integrated Liberation-leach Model and Ore Characterisation Procedure for Gold OresBy T D. H McGrath, G Wardell-Johnson, E A. Oraby, W Staunton, A R. Bax, J J. Eksteen
"Gold ores often show significant inter-domain variation with respect to the gravity recoverable gold (GRG) content and the leach behaviour of the non-GRG component. Liberation assessment is extremely
Jun 15, 2016