Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dump Leach Operation at Wiluna Western AustraliaGeneral Gold was discovered in quartz veins at Wiluna in 1896, and the first lode was discovered in 1904. Since 1896, some 2.5 million ounces of gold have been produced from the Wiluna area. The min
Jan 1, 1994
-
Geology - Paper No. 1 Computer-Assisted Geological MappingBy Marshall B, Gee R. D
Geological data processing by machine enables'an increased rate of coverage, better supervision and control of field programmes, increased effectiveness of field operators, and vastly improved
Jan 1, 1969
-
The impact of circulating loads on flotation circuit performanceBy McKee DJ
Many workers have observed an inverse relationship between final concentrate grade and valuable component recovery achieved by a flotation circuit, i.e. an increase in either grade or recovery may
Jan 1, 1986
-
Production of Cadmium Metal at Cockle CreekBy Bowmaker MD
Zinc and lead sulphide flotation con centrates containing from 0.02 to 0.20% Cd are roasted on an updraught sinter machine at the Cockle Creek Works of Sulphide Corp- oration Pty. Limited to provide
Jan 1, 1972
-
Studies on the Dissolution of Platinum and Palladium from Low Grade Ores and By-ProductsBy Ariti J
The mineralogy and extractive metallurgy of platinum and palladium in ores and residues is examined and the relative reactivity of Pt, Pd, PtS and PdS in cyanide and chloride media at 20¦C is discus
Jan 1, 1991
-
Rehabilitation of Mined LandAs this Seminar is on "Progress - Mining and the Environment", I am taking the liberty of extending my address beyond the scope implied by the subject, "Rehabilitation of Mined Land", with a prelim
Jan 1, 1971
-
Morwell Open Cut: Mine SchedulingBy Brimblecombe P
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres
Jan 1, 1989
-
The Development of Hilton Mine, 1947-1985By Mutton B. K
Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist
Jan 1, 1986
-
Economic Investigations on Sub-Level Stoping with Consolidated RockfillBy Heidecks C
Sub-level stoping with consolidated rockfill is the main method for mining steep dipping baryte and fluorite veins in Germany. Drifting is fully mechanised using drill jumbos, LHD units and shotcret
Jan 1, 1995
-
Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to DesignBy D David
Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide
Sep 29, 2013
-
Software for Mine PlanningBy Runge IC
The mine planning process is reviewed and appropriate software considered in terms of "line process" or "support function". The mine planner's requirements of a geological model and the element
Jan 1, 1983
-
Computer Model for Block Size Analysis of Jointed Rock MassesThe need to estimate the block size distribution of a jointed rock mass is of great importance in the design of blasting rounds to attain a pre- established fragmentation. Other Geomechanics topics
Jan 1, 1977
-
Movable Belt Conveyor at the Yallourn North Open Cut of the State Electricity Commision of VictoriaBy Anderson C. G
The design of crawler-mounted conveyor belts installed for the handling of brown coal in open cuts is described.INTRODUCTIONThe State Electricity Commission of Victoria operates two brown coal open cu
Jan 1, 1955
-
Conclusion or 'Chairman's Reflections'It is always difficult to sum up an open forum adequately and instantaneously, so, with the privilege of hindsight, and also with some time to reflect, I am exercising the Chairman's prerogat
Jan 1, 1986
-
Current Approaches for the Process Mineralogy of Platinum-Group Element Ores and TailingsBy V N. Rudashevsky, N S. Rudashevsky
Characterisation of platinum-group element (PGE) deposits and their process products has many challenges for the process or applied mineralogist. It is now well established that the PGE distribution f
Jan 1, 2008
-
Optimising Mine Ventilation Through the Use of Life-Cycle Production ModelsBy C Kocsis, G Baiden, Y Bissiri
CANMET-MMSL and Penguin Automation Systems Inc have been exploring how process simulation and ventilation modelling software, when combined, can be used to optimise hard-rock/metal mine ventilation sy
Jan 1, 2005
-
Study of the Adsorption of Metal Ions onto PyroxeneBy V Malysiak, N J. Shackleton
In the flotation of platinum group minerals pyroxene is a major gangue mineral. This study shows using zeta potential and ToF-SIMS analyses that when pyroxene is exposed to copper, nickel and/or calci
Jan 1, 2005
-
Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future TrendsBy Duncan GR
Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es
Jan 1, 1988
-
Stress Corrosion Cracking of Rock BoltsThis paper outlines the mechanism of Stress Corrosion Cracking (SCC) and how it can cause premature failure of rock bolts. SCC occurs due to the progressive development and growth of cracks in the sur
Jan 1, 1998
-
Recovery of Sulphuric Acid from the Hydrometallurgical Copper ProcessBy Grinbaum B, Stevens G. W, Dalton R. F
Many hydrometallurgical processes produce large amounts of acid waste. This is illustrated by the copper S/X-E/W process which produces a bleed from the electrolysis tank house in the form of a con
Jan 1, 1997