Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dump Leach Operation at Wiluna Western Australia

    General Gold was discovered in quartz veins at Wiluna in 1896, and the first lode was discovered in 1904. Since 1896, some 2.5 million ounces of gold have been produced from the Wiluna area. The min

    Jan 1, 1994

  • AUSIMM
    Geology - Paper No. 1 Computer-Assisted Geological Mapping

    By Marshall B, Gee R. D

    Geological data processing by machine enables'an increased rate of coverage, better supervision and control of field programmes, increased effectiveness of field operators, and vastly improved

    Jan 1, 1969

  • AUSIMM
    The impact of circulating loads on flotation circuit performance

    By McKee DJ

    Many workers have observed an inverse relationship between final concentrate grade and valuable component recovery achieved by a flotation circuit, i.e. an increase in either grade or recovery may

    Jan 1, 1986

  • AUSIMM
    Production of Cadmium Metal at Cockle Creek

    By Bowmaker MD

    Zinc and lead sulphide flotation con centrates containing from 0.02 to 0.20% Cd are roasted on an updraught sinter machine at the Cockle Creek Works of Sulphide Corp- oration Pty. Limited to provide

    Jan 1, 1972

  • AUSIMM
    Studies on the Dissolution of Platinum and Palladium from Low Grade Ores and By-Products

    By Ariti J

    The mineralogy and extractive metallurgy of platinum and palladium in ores and residues is examined and the relative reactivity of Pt, Pd, PtS and PdS in cyanide and chloride media at 20¦C is discus

    Jan 1, 1991

  • AUSIMM
    Rehabilitation of Mined Land

    As this Seminar is on "Progress - Mining and the Environment", I am taking the liberty of extending my address beyond the scope implied by the subject, "Rehabilitation of Mined Land", with a prelim

    Jan 1, 1971

  • AUSIMM
    Morwell Open Cut: Mine Scheduling

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    The Development of Hilton Mine, 1947-1985

    By Mutton B. K

    Hilton Mine is being developed as an integrated component of the Mount Isa operation, to achieve continuity of silver/lead/zinc production well into the next century. The mine has a chequered hist

    Jan 1, 1986

  • AUSIMM
    Economic Investigations on Sub-Level Stoping with Consolidated Rockfill

    By Heidecks C

    Sub-level stoping with consolidated rockfill is the main method for mining steep dipping baryte and fluorite veins in Germany. Drifting is fully mechanised using drill jumbos, LHD units and shotcret

    Jan 1, 1995

  • AUSIMM
    Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to Design

    By D David

    Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide

    Sep 29, 2013

  • AUSIMM
    Software for Mine Planning

    By Runge IC

    The mine planning process is reviewed and appropriate software considered in terms of "line process" or "support function". The mine planner's requirements of a geological model and the element

    Jan 1, 1983

  • AUSIMM
    Computer Model for Block Size Analysis of Jointed Rock Masses

    The need to estimate the block size distribution of a jointed rock mass is of great importance in the design of blasting rounds to attain a pre- established fragmentation. Other Geomechanics topics

    Jan 1, 1977

  • AUSIMM
    Movable Belt Conveyor at the Yallourn North Open Cut of the State Electricity Commision of Victoria

    By Anderson C. G

    The design of crawler-mounted conveyor belts installed for the handling of brown coal in open cuts is described.INTRODUCTIONThe State Electricity Commission of Victoria operates two brown coal open cu

    Jan 1, 1955

  • AUSIMM
    Conclusion or 'Chairman's Reflections'

    It is always difficult to sum up an open forum adequately and instantaneously, so, with the privilege of hindsight, and also with some time to reflect, I am exercising the Chairman's prerogat

    Jan 1, 1986

  • AUSIMM
    Current Approaches for the Process Mineralogy of Platinum-Group Element Ores and Tailings

    By V N. Rudashevsky, N S. Rudashevsky

    Characterisation of platinum-group element (PGE) deposits and their process products has many challenges for the process or applied mineralogist. It is now well established that the PGE distribution f

    Jan 1, 2008

  • AUSIMM
    Optimising Mine Ventilation Through the Use of Life-Cycle Production Models

    By C Kocsis, G Baiden, Y Bissiri

    CANMET-MMSL and Penguin Automation Systems Inc have been exploring how process simulation and ventilation modelling software, when combined, can be used to optimise hard-rock/metal mine ventilation sy

    Jan 1, 2005

  • AUSIMM
    Study of the Adsorption of Metal Ions onto Pyroxene

    By V Malysiak, N J. Shackleton

    In the flotation of platinum group minerals pyroxene is a major gangue mineral. This study shows using zeta potential and ToF-SIMS analyses that when pyroxene is exposed to copper, nickel and/or calci

    Jan 1, 2005

  • AUSIMM
    Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future Trends

    By Duncan GR

    Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es

    Jan 1, 1988

  • AUSIMM
    Stress Corrosion Cracking of Rock Bolts

    This paper outlines the mechanism of Stress Corrosion Cracking (SCC) and how it can cause premature failure of rock bolts. SCC occurs due to the progressive development and growth of cracks in the sur

    Jan 1, 1998

  • AUSIMM
    Recovery of Sulphuric Acid from the Hydrometallurgical Copper Process

    By Grinbaum B, Stevens G. W, Dalton R. F

    Many hydrometallurgical processes produce large amounts of acid waste. This is illustrated by the copper S/X-E/W process which produces a bleed from the electrolysis tank house in the form of a con

    Jan 1, 1997