Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rehabilitation, Landscaping, And Tress

    The aim of this paper is to examine the problems confronting the planner, designer, constructor and management when rehabilitating the works associated with road building- and including quarry and

    Jan 1, 1976

  • AUSIMM
    Electrochemistry of Sulphide Flotation

    The interaction of flotation collectors with sulphide minerals takes place at the solid - solution interface. The electrochemistry of the processes which affect this interface are discussed. The in

    Jan 1, 1980

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

    By Lemberg D. W, Friday R. G

    Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-

    Jan 1, 1981

  • AUSIMM
    Generation of 3D planar failure hazard maps for pit slope management

    By D E. Tennant

    In the fields of geotechnical engineering and slope management, various software packages are used to assess the behaviour or propensity for a slope to fail. Traditional kinematic analysis calculates

    Nov 29, 2022

  • AUSIMM
    Investigation of the internal mechanical structure of Mars based on geometrical patterns of faults

    By Y Tsukurimichi, D Asahina, T Endo, T Takemura

    Scientific knowledge of Mars’ surface morphology and internal geological structure has been accumulated through satellite imagery and numerical topographic data using remote sensing technology, as wel

    Nov 29, 2022

  • AUSIMM
    Management of Computer Systems Implementation within an Operating Mine

    Industry and Government is littered with computer systems which suffered massive cost overruns in their production and which do not fully meet the expectations and needs of their users. There are

    Jan 1, 1983

  • AUSIMM
    The Management of Major Projects - Large Scale and Remote Location Case Histories

    By Stevens LG, Mok JK

    With the long lead time requirement for engineering and construction of mineral pro- cessing facilities and the costly financing arrangements necessary, effective project management is essential to

    Jan 1, 1981

  • AUSIMM
    Survey Procedures for Urban Underground Construction

    The advantages of coordinate geometry in design and construction of underground works are apparent for reasons of flexibility, security, computer operations, survey error analysis, and the use of n

    Jan 1, 1976

  • AUSIMM
    Development of Integrated Passive Water Treatment Systems for the Treatment of Mine Waters

    By R Heath, P Rose, L Coetser

    A sustained eight-year major research effort has been undertaken in South Africa to develop integrated passive water treatment systems for the sustainable removal of sulfates, while simultaneously add

    Jan 1, 2003

  • AUSIMM
    Formation of <i>O,OÆ</i>-Di-Alkyl-Dithiophosphate Copper(I) Complexes on the Surface of Synthetic Chalcocite ù NMR and SEM Studies

    By O N. Antzutkin, W Forsling, K J. Pike an

    The adsorption mechanism of three different O,OÆ-di-alkyl-dithiophosphate (dtp) collectors, K[S2P(OR)2] with R = Et, i-Bu and i-Amyl, on the surface of synthetic chalcocite (Cu2S) was studied by means

    Jan 1, 2005

  • AUSIMM
    Rheological Hypothesis of the Coal and Methane Outburst Mechanism

    By Xueqiu H

    Since the hypothesis of coal and methane outburst mechanisms based on elastic mechanics gives no consideration to time, it cannot give satisfactory explanation of the outburst occurrence and its devel

    Jan 1, 1992

  • AUSIMM
    Design Risk Management at Mt Leyshon Gold Mine

    The Mt Leyshon Gold Mine is located 30 kilometres south of Charters Towers in Northern Queensland. The current open cut mine has been in operation since 1986. In 1992 a feasibility study was complet

    Jan 1, 1994

  • AUSIMM
    Direct Copper Smelting

    Direct smelting of copper in a single vessel has long been the extractive metallurgist&apos;s dream. Such a process offers the important alvantage. of (i) maximum use of the energy available from oxid

    Jan 1, 1985

  • AUSIMM
    Lead-zinc-silver Ore Concentration Practice at the Hilton Concentrator, Mount Isa Mines Limited, Mount Isa, Qld

    Trial ore production began at the Hilton Mine in 1987 with ore being trucked into Mount Isa for treatment at the Lead/zinc Concentrator. The expansion of output from the Hilton mine required additiona

    Jan 1, 1993

  • AUSIMM
    Mineral Processing to the Year 2001: Researcg and New Developments

    By McKee DJ

    Future mineral processing developments will be of two types. There will be a continuation of the advances of the last 20 years including major increases in equipment capacities, the development of

    Jan 1, 1981

  • AUSIMM
    Development of the All-Flotation Process at the Zinc Corporation Limited, Broken Hill (Reprint)

    The ore mined from the Lead Lode of The Zinc Corporation leases consists of a fairly granular mixture of galena, marmatite, chalcopyrite, tetrahedrite, pyrrhotite, pyrite, and lollingite with a gangue

    Jan 1, 1994

  • AUSIMM
    Meeting Mine Productivity Requirements with Dry Drilling

    This paper investigates dry drilling as a feasible alternative to meet current requirements for improvements in mining productivity in an increasingly competitive world.A field test program was conduc

    Jan 1, 1991

  • AUSIMM
    Learning from Nuclear Waste Repository Design: the Ground-Control Plan (9344425e-0fdb-451a-8179-1134301c90ee)

    With mining development on hold and other underground works in a slowdown, the development of nuclear wa te repositories takes centre tage on the American rock engineering scene. Three repositorie for

    Jan 1, 1988

  • AUSIMM
    Learning from Nuclear Waste Repository-Design: The Ground-Control Plan

    With mining development on hold and other underground works in a slowdown, the develop- ment of nuclear waste repositories takes center stage on the American rock engineering scene. Three repositor

    Jan 1, 1987