Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of Complex Systems to Develop Key Water Quality Influences at the DeBeers Snap Lake Diamond Project

    By R L. Verburg, R Johnstone

    DeBeers Canada Mining Inc (DeBeers) recently submitted an Environmental Assessment (EA) for its proposed Snap Lake Diamond Mine located in Northwest Territories, Canada. As part of the EA process, a s

    Jan 1, 2003

  • AUSIMM
    Mercury Sorption on Clinoptilolite

    By K Friese, H P÷llmann

    Clinoptilolites, modified with sodium, produced a material which has been tested for the ability to remove Hg (II) from aqueous nitric acid. The amount of adsorption depends on contact time, acid conc

    Jan 1, 2008

  • AUSIMM
    Economic Loss Fucnctions and Geostatistical Simulation for Grade Control Applications

    By Koppe J. C, Dimitrakopoulos R, Costa J. F

    Grade control and the delineation of ore/waste in open pit operations is traditionally based on the comparison of estimated grades with an economic cut-off. This paper deals with an alternative appr

    Jan 1, 1998

  • AUSIMM
    Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston Mine

    By G E. Smith, G N. Lye

    Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional

    Jan 1, 2001

  • AUSIMM
    Selection, Training and Performance Management

    There are three major human resource management activities which, depending on how well they are done, impact on the performance of people and therefore the bottom line. These are: ò recruitment; ò

    Jan 1, 1995

  • AUSIMM
    Structure of the Integrated Mine Control System at Kemi Chrome Mine

    By Toivanen R-M, Leinonen O, Pekkarinen H

    This paper presents developments in designing an integrated mine control system at Kemi mine. The aim of this paper is to present the general structure of the system and to outline some features of

    Jan 1, 1998

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    Requirements for On-Site Testing of Axial Flow Fans

    The problems associated with achieving adequate accuracy for on-site axial flow fan performance measurements are discussed. The ability to test accurately rests heavily on equipment and installation d

    Jan 1, 1973

  • AUSIMM
    GPSS Computer Simulation of Equipment Requirements for the Iron Duke Mine

    By Sturgul J. R

    The South Middleback Ranges (SMR) operation involves the develop- ment of iron ore resources at the Iron Duke mine in the South Middle- back Ranges to replace the Iron Baron mine whose reserves are ne

    Jan 1, 1989

  • AUSIMM
    Flash Point Test for Lead

    Mr. P. F. THOMPSON said this matter was one of very great importance to producers of lead. His association with the matter was that he happened to be the Institute representative on the Committee of t

    Jan 1, 1930

  • AUSIMM
    Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them

    By J Paradis, K Dudgeon, M Topping

    At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon

    Aug 18, 2014

  • AUSIMM
    Plant and Process Design Improvements to Increase the Efficiency of Nickel Reduction at QNI

    By R Piper

    The Yabulu Nickel Refinery commissioned in 1974, processes lateritic ore via a modified Caron process to produce high quality nickel and cobalt products. The Greenvale orebody provided the sole source

    Jan 1, 2002

  • AUSIMM
    Orebody Definition and Optimisation

    The importance of orebody definition and optimisation in project development cannot be overstated. Inappropriate orebody definition is the single most important reason for project under performance

    Jan 1, 1997

  • AUSIMM
    Morphology of Central Pacific Seamounts: Implication for MN-Crust Mining

    Studies of the morphology of seamounts within the Hawaiian, Line Islands, Gilbert and Phoenix Seamount groups indicate that the morphology and size distribution of seamounts vary significantly fr

    Jan 1, 1987

  • AUSIMM
    The PACMANUS Seafloor Sulfide Field, Eastern Manus Basin, Papua New Guinea

    By J M. Parr, C J. Yeats

    Discovered in 1991 by combined plume detection and bottom-tow photography (Binns and Scott, 1993) and for some years thereafter the highest tenor mineral occurrence known on the ocean floor, the PACMA

    Jan 1, 2008

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    The Stabilization of Arsenic by Its Incorporation Into Lead-Zinc Smelter Slag

    By Lawson F

    Arsenic-containing waste was dissolved into molten slags and the leaching behaviour of the quenched arsenic-doped slags (containing up to 2.3 wt per cent arsenic) was ascertained to evaluate the poten

    Jan 1, 1996

  • AUSIMM
    Ore Sorting and Artificial Vision

    By Artieda JJ, Catalina JC

    - The aim of this paper is to analyse the possibilities of applying signal processing and artificial vision techniques to the ore sorting problem. In order to overcome the limitations imposed by the c

    Jan 1, 1985

  • AUSIMM
    Reply to Dinner Address

    I am honoured and very pleased to have been given the opportunity this evening to say a few words of thanks not only on behalf of all the guests but especially for the delegates and accompanying p

    Jan 1, 1986

  • AUSIMM
    Cannington Paste Fill System - Achieving Demand Capacity

    By M Revell

    The paste fill system at BHP CanningtonÆs underground silver-lead-zinc mine is described. The first of its type in Australia, the paste fill system has been operational since December 1997. Key techni

    Jan 1, 2000