Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Argyle Process Plant Control System

    By Weber D, Knox PR

    The criteria developed for the Argyle Diamond Mine process plant control system are reviewed. The control system installed is described along with a discussion of the method of implementation adop

    Jan 1, 1986

  • AUSIMM
    Computerised Deposit Modelling, Volumetrics, and Production Scheduling

    By Davey CJ

    An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative

    Jan 1, 1983

  • AUSIMM
    Introduction to Automation Systems Requirements

    Dr David Dekker discussed the importance of a multidisciplinary approach to automation, the infrastructure required to support automation, and selecting the equipment for automation. Dekker stressed

    Jan 1, 1997

  • AUSIMM
    Inflow Prevention General Report (123a47d1-2352-42e5-bebb-dc22f4119702)

    The paper deals with the problems of grouting methods for fissured-porous rock. The paper describes design procedure, injection process patterns and hydrodynamic testing techni- que to plan grouting

    Jan 1, 1988

  • AUSIMM
    Mining Towards 2000

    By Clifford C. E

    1 eat my peas with honey I've done it all my lifeIt makes them taste rather funny But it keeps them on the knife.Innovation is that elusive characteristic which involves the determination of mult

    Jan 1, 1993

  • AUSIMM
    Dense Medium Separation at Mt Newman

    The Mt Newman Beneficiation Plant uses a combination of heavy media deans, heavy medium cyclones and Reichert cones to produce saleable iron ore concentrates from low grade iron ores. The aim of t

    Jan 1, 1987

  • AUSIMM
    Flotation of Hematite Using C6-C18 Saturated Fatty Acids

    The homologous series of saturated fatty acids investigated in this study generally show a steady gradation of properties with chain length. The solution pKa values were assumed constant at 4.9, howev

    Jan 1, 2005

  • AUSIMM
    The Ballarat Gold Field and The City of Ballarat

    The development of the Ballarat goldfield and of the city of Ballarat are a significant part of the history of the Australian mining industry. Important developments in technology, legislation and

    Jan 1, 1982

  • AUSIMM
    The Analysis of Metal Markets and Future Prices

    The methods used by the Anglo American Corporation for analysis of long-term metal markets and prices are described. The principal factors affecting the relationships between production costs and

    Jan 1, 1986

  • AUSIMM
    New Backfill Binder and Method

    By M Grossi, G Baiden

    This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and onsite applications. The new binder has several advantages over

    Jan 1, 1998

  • AUSIMM
    The Variation of Austenitic Grain Size with Temperature

    The variation of austenitic grain size with temperature for the steels XKSlSO and XK9261 was determined using the vacuum ctching technique.It is shown that the effect of temperature on the mean grain

    Jan 1, 1967

  • AUSIMM
    Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap Leach

    By D Readett

    The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t

    Aug 8, 2011

  • AUSIMM
    Designing the Optimal Flotation Circuit - The Prominent Hill Case

    By P J. Colbert, P D. Munro

    OZ Minerals' Prominent Hill copper-gold concentrator in South Australia was built in 2008 with commercial production commencing in early 2009. In addition to recovery of valuable minerals, the fl

    Jan 1, 2009

  • AUSIMM
    The Preparation of Ultra-Low Ash Coals

    By Smitham J. B, Keast-Jones R

    Six Australian coals were selected to determine their potential to produce, ultra low ash (less than 2 per cent) coal by progressive size reduction followed by density separation and/or froth flotatio

    Jan 1, 1987

  • AUSIMM
    Dewatering by Advanced Membrane Separation Processes

    The mining and resources industry in general has relied on macro separation technologies (greater than 1 micron) through processes which include: ò sedimentation ò flocculation and coagulation scre

    Jan 1, 1989

  • AUSIMM
    Operational Experiences and Performance Assessment of HPGR Technology at Argyle Diamond Mine

    By C Morley, B Costello

    In 2002 the Argyle Diamond Mine upgraded the process plantÆs recrush circuit to include a High Pressure Grinding Roll (HPGR), or High Pressure Rolls Crushers (HPRC) as they are termed in the diamond i

    Jan 1, 2004

  • AUSIMM
    Deoxidation of Ti-Ni alloy by the calcium and CaF2-MgCl2 flux

    By K S. Park, J K. Kim, J H. Park, Y Su

    The present study investigates the possibility of the direct removal of oxygen from the Ti-30Ni (wt per cent) alloy melt through the thermodynamic equilibrium reactions at 1623 K in the vertical tube

    Aug 21, 2024

  • AUSIMM
    Improving Safety and Production – The Transition to Electronic Detonators at George Fisher Mine

    By M Breen

    In 2009, George Fisher mine began to seriously consider the transition from pyrotechnic detonators to electronic detonators. Initially, the electronic detonators were used for complex crown shots or a

    Nov 8, 2011

  • AUSIMM
    Installation And Design Guidelines For Cable Dowel Ground Support At ZC/NBHC

    By Askew J. E

    All facets of current practices of cable dowelling at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited are re- viewed. This includes materials specific- ations, installation pra

    Jan 1, 1977

  • AUSIMM
    Limits Excavation at Mt Whaleback

    Within the Mt Whaleback open cut mine the integrity of the final pit wall is achieved through careful rock slope design, use of rock reinforecement technology where marginal stability exists and u

    Jan 1, 1986