Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Chemical Basis of FlotationDR. WARK, said: I have not come to Broken Hill to tell you how to conduct flotation operations; indeed, during my short stay here I have already learned much concerning the process, of the many diffic
Jan 1, 1933
-
Geometry And Stability Determination Of Large Dimension Cut-And-Fill Rooms At KamotoBy Blake W
Based on preliminary computer model simulations and stability analyses, both longi- tudinal and transverse, large dimension, cut- and-fill rooms were designed for the parallel dipping ore layers at
Jan 1, 1973
-
Decelerometer Shaft InspectionsBy Golosinski T. S, Jorgenson J. D
Several methods are available for inspections of mine shafts. These involve use of inclinometers, moving beams, inertial platforms and decelerometers. Inspections which use decelerometers are of mos
Jan 1, 1995
-
An Assessment Of Swelling On Reduction Methods For Iron Ore PelletsAn assessment has been made of six reported methods for the determination of the swelling of iron ore pellets on reduction. The methods are discussed on the basis of apparatus requirements, reducti
Jan 1, 1974
-
Cemented Hydraulic Fill Mix Design As it Applies To Mine SchedulingThe need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any
Jan 1, 1973
-
QEMSCAN« and Microprobe Studies on the Chromitite of Sittampundi Anorthosite Complex, Tamil Nadu û Implications for Platinum Group Element MineralisationBy R K. W Merkle, E Whiteman
The anorthosite complexes and related rock types of the Indian Precambrian shield are primarily associated with either cratons or mobile belts. They were metamorphosed under amphibolite to granulite f
Jan 1, 2008
-
An Exploratory Study Of Pre-Nucleated PelletisationBy Adamiak Z. P, Nicol S. K
An exploratory study has been carried out on the applicability of pre-nucleated feed in pelletising operations. Measurements of the pellet quality parameters showed that iron ore pellets prepared
Jan 1, 1974
-
Museum Station -Structural and Architectural DesignBy Simpson D, Skopakow J
This paper is one of the series of papers relating to the Melbourne Underground Rail Loop and specifically describes the structural and architectural design of Museum Station. Structural arrangeme
Jan 1, 1981
-
Selection of Cell Operating Conditions to Optimise Performance of Flotation Circuits with Large CellsAn extensive study was carried out to evaluate the performance of Outokumpu OK50, OK38 and Maxwell MX14 cells at ComincoÆs Red Dog flotation concentrator in Alaska. Tests were conducted by varying ope
Jan 1, 2000
-
Safe Performance - Some Individual and Organisational FactorsThis paper describes some research attempts to isolate factors associated with lost time accidents and attitudes to safety. Some results of these investigations are presented and their implications
Jan 1, 1975
-
Carbonatites and Ore DepositsCarbonatites - igneous carbonate-silicate rocks - host the world's major resources for niobium, phosphorous and REE (rare earth elements).Carbonatites represent the least common products of mantl
Jan 1, 1994
-
Current Drilling Practice at Isa MineBy Stevens P
The Isa Mine of Mount Isa Mines Limited currently produces 5.4 million tonnes of copper ore and 3.3 million tonnes of silver, lead and zinc ore annually. Of this, 5.1 million tonnes of copper ore
Jan 1, 1982
-
The Waihi GoldfieldSOME 70 miles south-east of the of Auckland lies the town of Waihi-the centre of the Waihi goldfield, at present the mining pride of New Zealand. That the glory of most mining camps is evanescent form
Jan 1, 1911
-
An Analysis of the Geological Factors Leading to Outburst-Prone Conditions at Collinsville, QueenslandBy Rogis J
The basic parameters causing outbursts are rock pressure, gas characteristics and the physico-mechanical properties of the coal. The three sets of factors are to some degree interdependent. At Colli
Jan 1, 1980
-
Reduction of Geological Hazards along the Pacific Rim: And IDNDR ChallengeThe international scientific and engineer-ing community is being challenged to take advantage of the opportunity offered by the U.N. International Decade for Natural Disaster Reduction (IDNDR) program
Jan 1, 1990
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
-
Long-Term SchedulingThis paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.
Sep 26, 2011
-
-
Initiation Systems - What Does the Future Hold?The rapid industrialisation of the world was driven by an improved ability to utilise chemical energy. Unfortunately harnessing explosive energy did not come cheaply given the hundreds of lost live
Jan 1, 1990