Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Footwall Mineralogy of the Old Waite Massive Sulphide Deposit, Noranda, Quebec: Hydrothermal, Prograde and Retrograde.The mined-out Old Waite volcanogenic Cu-Zn deposit lies in the Noranda mining district of northwestern Quebec. The deposit has a distinctive pipe-like zone of alteration beneath the massive ore, ex
Jan 1, 1989
-
Thermoelectric Power Measurements of Particulate Chalcopyrite Samples from the Mt Isa MineBy Kobayashi M
Particulate chalcopyrite samples (78 ~ 98 mole per cent chalcopyrite, screen size fraction from 710 to 250 µm) were prepared by crushing and sieving lump ore samples from 12 locations in the Mt I
Jan 1, 1990
-
Transfer of Zinc from LGM Concentrate to Zinc Concentrate at the Hilton Concentrator of Mount Isa Mines LimitedBy Burford B. D, Johnson N. W, Rohner P
Under design philosophy, the Hilton concentrator produced lead, zinc and LGM (lead plus zinc) concentrates. The LGM (Iow grade middling) concentrate was produced by combining coarse middling streams f
Jan 1, 1994
-
The Application of Rock Mechanics to Mining at Renison LimitedDuring the past 18 months a rock mechanics project has been in operation at Renison Limited. The project was established to identify and investigate key problem areas that would affect future prod
Jan 1, 1982
-
New Circuits for the Treatment of Fine-Grained Zinc/Lead Ore at the Sullivan ConcentratorBy Egan J. R
Changes have recently been applied to the Sullivan Concentrator lead and zinc circuits to treat fine-grained ores which make-up the majority of ore reserves in the mine. Pilot plant testwork conduct
Jan 1, 1993
-
Development of the West Cliff Extended ProjectIn the Illawarra District of New South Wales, Mines were traditionally developed from the seabord. The advantages were close access to the working faces and a minimal depth of cover. Travelling ti
Jan 1, 1983
-
Dewatering Open Pit Mines, Yilgran Craton, Western AustraliaOpen pit mines in the Yilgam Craton have unique hydrogeological characteristics resulting from a combination of geology, mineralisation and the complex and extended development of the regolith. The pr
Jan 1, 1993
-
New Celebration Tailings Treatment Plant 18 Months LaterBy Delahey G, Dunne R
At New Celebration Gold Mine the advent of treating primary sulphide ores resulted in decreased gold recoveries of four to ten per cent. The grind coarsened due to an increase in ore hardness and go
Jan 1, 1993
-
Blasting for Reduced Process Plant Costs at Argyle Diamond MineBy Smallnone P, Walker B
Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expan
Jan 1, 1998
-
Some Practical Aspects of Ore Reserve Estimation at Chuquicamata Copper Mine, ChileBy Dunn P. G
The copper ore reserves at the Chuquicamata mine were re-estimated during March to June 1994, as part of a comprehensive audit of the mine's overall short- and long-term planning. The basic pri
Jan 1, 1995
-
Gas UtilisationAPPIN AND TOWER METHANE ENERGY PROJECTA world first in energy innovationBHP has teamed with Energy Developments Limited and Lend Lease Infrastructure, to establish an electrical power generation facil
Jan 1, 1998
-
Improving Sampling Methodology for the Evaluation of Fines Production at Vanderbijl Park Sinter Plant, South AfricaBy J P. R de Villiers
The Vanderbijl Park sinter plant in South Africa was investigated to determine the reason for the production of very fine sinter not acceptable as feedstock for the blast furnace. A procedure was desi
Jan 1, 2008
-
Comparative Cost of Rock Drilling UndergroundDURING a period extending over about the last two and a half years, the performances of various types of rock drills in use at the mining department of the Zinc Corporation have been recorded as close
Jan 1, 1923
-
Heavy Media Separation at Abminco OperationHeavy media separation serves to upgrade mill feed and reduce unit operating costs, allowing ores to be mined which could other wise be uneconomic. At the Aberfoyle mine at Rossarden in north-east
Jan 1, 1978
-
Technology for Mine Water Management General Report (944cdd0a-6520-484e-ae27-57a5f498ce74)PAPERS : 1 COMPUTER AIDED DESIGN OF MINE WATER MANAGEMENT - Z KESSERU 2 THE HYDROGEOLOGICAL PROBLEMS OF GROUNDWATER PROTECTION IN MINING REGIONS - V A MIRONENKO 3 WATER MANAGEMENT OF THE MAE MOH PRO
Jan 1, 1988
-
The Development and Application of the Jameson CellBy Riches N, Harbort G
The Jameson flotation cell was developed jointly by Mount Isa Mines Limited and Professor GJ Jameson of the University of Newcastle. The cell has been used in a number of cleaning applications within
Jan 1, 1991
-
Design, Construction and Commissioning of the Ridgeway Concentrator Regrind Circuit at NewcrestÆs Cadia Valley OperationsBy F Cesnik, P Griffin, S Green
In July 2004 a flotation concentrate regrind circuit was commissioned in the æHigh GradeÆ Ridgeway concentrator at NewcrestÆs Cadia Valley Operations. This was the culmination of two years of project
Jan 1, 2005
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Development of Automated Lead Ingot Casting Machines at the Broken Hill Associated Smelters Pty. Ltd.By Dawson RD
For the past 45 years, the casting of refined lead ingots by The Broken Hill Asso- ciated Smelters Pty. Ltd. (B.H.A,S,) at Port Pirie has been mainly by use of manually operated rotary casting whee
Jan 1, 1975
-
Deep Aquifer Shutdown Tests at Yallourn MineBy M Coulthard, J Rivalland, K Dugan
Prior to 2001 Yallourn Mine has pumped approximately 1000 Megalitres of water per annum from aquifers beneath the mine floor in order to control aquifer pressures that were thought to have an influenc
Jan 1, 2003