Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Comparison of the Mechanism of Breakage in Full Scale and Laboratory Scale Grinding MillsBy Restarick CJ
The development of mathematical relationships to describe grinding in continuous rod and ball mills has involved two methods of approach and has resulted in two main types of "model." The first which
Jan 1, 1970
-
Design, Construction and Commissioning of the Ridgeway Concentrator Regrind Circuit at NewcrestÆs Cadia Valley OperationsBy F Cesnik, P Griffin, S Green
In July 2004 a flotation concentrate regrind circuit was commissioned in the æHigh GradeÆ Ridgeway concentrator at NewcrestÆs Cadia Valley Operations. This was the culmination of two years of project
Jan 1, 2005
-
Iron Ore Holdings Ltd – Case Study of the Environmental Approval Challenges for an Emerging JuniorBy H Fletcher
Iron Ore Holdings Ltd (IOH) is an emerging junior iron ore company that is actively developing projects in the Central and Western Pilbara region of Western Australia. IOH commissioned URS Australia P
Jul 11, 2011
-
Paper No. 183. Notes on Different Methods of Stoping in Use on The Kalgoorlie Field.IN dealing with this subject the intention is not to write a detailed description of the various methods in vogue on the Kalgoorlie field, but rather to give a brief outline of three of the methods wh
Jan 1, 1909
-
The Operation and Interaction of Grates and Pulp Lifters in Autogenous and Semi-Autogenous MillsBy S Latchireddi
Close circuiting autogenous and semi-autogenous mills is anenergy efficient way of grinding and a number of operations haveutilised this in the design of their comminution circuits. Owing tothe large
Jan 1, 2001
-
Electromagnetic Testing of Mine Winding Ropes û The Field Pattern of an Internal Broken WireWith the recent wider introduction of friction hoists of the Koepe type. for winding from depths of more than 3000 feet it has been found that failure by fatigue is the most common form of rope det
Jan 1, 1971
-
Numerical Modelling of a Monitored Site in an Underground Coal Mine in the Bowen BasinBy Medhurst TP, Trueman R
The aim of the paper was to model numerically some aspects of the extraction of coal pillars by split and fendering. A two-dimensional elasto-plastic plane strain model with strain softening and in
Jan 1, 1992
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
The Development and Application of Health, Safety, Environment and Community Management Standards in BHP BillitonPrior to the merger of BHP and Billiton, both companies had a keenfocus on improving their performance in health, safety, environment and community (HSEC) matters. This shared intent, albeit executed
Jan 1, 2002
-
Experimental Study on the Mineral Processing of a Large-Scale Scheelite Mine in Jiangxi ProvinceBy X Zhang, Z Guang, R Lin
To improve the existing process of a large-scale scheelite concentrator in Jiangxi Province, this paper presents an advanced process æselective flotation of copper and flotation desulfurisation û roug
Jan 1, 2008
-
Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site ConditionsBy S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss
Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae
Nov 4, 2015
-
The Use of a Large-strain Drying and Consolidation Model to Optimise Multilift Tailing DepositsBy P J. Vardon, L A. van Paassen, Y Yao, A F. van Tol
Thin-lift atmospheric fine drying (AFD) is a technique used to dewater mine and oil sand tailings, which utilises both self-weight consolidation and atmospheric evaporation. The disposed layers underg
Jul 27, 2015
-
Dip Sampling Cyanide Gold Bullion at the Sons of Gwalia Gold Mine, Gwalia, Western AustraliaThe difficulty of accurately sampling cyanide gold bullion for valuation is well known, and nothing new or original is claimed in presenting this paper, but it was thought that a record of differences
Jan 1, 1931
-
The Loader Distributor Train - an Advanced System for High Speed Mucking of Hard Rock TunnelsBy Luck D
Current methods of mucking out small development tunnels are a major limitation to improved efficiency and high rates of advance. This is particularly true in the deep metalliferous mines of South
Jan 1, 1986
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
Improving the Accuracy of Mine Site Water Balances through Improved Estimation of Run-off VolumesBy A Woodley, N C. Kunz
A mine site water balance is important for communicating information to interested stakeholders, for reporting on water performance and for anticipating and mitigating water-related risks through wate
Nov 26, 2013
-
Implementing Quality in the Technical Computing Environment - A Case Study from Pasminco Mining - Broken HillOne of the strategies introduced within Pasminco Mining to survive low commodity prices is to formally implement a `Quality Education System'. The net result has been a consistent approach to qu
Jan 1, 1995
-
Interdisciplinary Approach to the Analysis of Acid Mine Drainage at an Underground Lead Zinc MineBy Williams RE, Ralston DR
Acid mine drainage is a serious environmental and economic concern, resulting in regulation of the mining industry and significant water treatment costs. An interdisciplinary approach is needed to a
Jan 1, 1988
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
An Investigation of Magnetite Consumption at the Blackwater Coal Preparation Plant of Utah Development CompanyBy Tonkin D. A
Poor performance in the several stages of the magnetite recovery circuit, coupled with poor desliming through inefficient and over- loaded desliming screens, led to excessive magnetite consumption.
Jan 1, 1974