Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Opportunities for Sustainable Development at Chinh Bac Mine Waste Dump in VietnamBy J B. Pateiro-Fernßndez, M Fuchsschwanz, G Deissmann, S Ahmad
Quang Ninh province is the most significant coal producing region in the north of Vietnam. The Nui Beo Coal Company (NBCC) operates open pit mines in Quang Ninh province and the waste overburden produ
Jan 1, 2009
-
Fragmentation Prediction in Bench BlastingBy Wang S
Fragmentation is the basic concern in rock blasting and serves as the main measure of blasting effectiveness. A good estimation of fragment size distribution before blasting is very useful and helpf
Jan 1, 1990
-
Backfilling of Caved-in Goafs with Pastes for Disposal of ResiduesBy W Schauenburg
The increasing problems associated with the disposal of waste and the potential for use of by-products as underground filling material is a subject which is relevant not only to the coal-mining indust
Jan 1, 1998
-
A New Conceptual Model for Ball MillingBy Bourgeois F
The population balance concept has provided a useful framework for the description of the operating behavior of the ball mill. This approach finds expression in the so-called selection breakage func
Jan 1, 1993
-
Predicting Iron Ore Losses and Dilution Factors Using Conditional SimulationsBy D Roldpo, M Vidigal, J F. C L Costa
The local cumulative distribution function (lcdf) of a selective mine unit (SMU) can be estimated by conditional simulations using the statistics derived from the sample points, generating multiple eq
Jan 1, 2009
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
Pillar Extraction MethodsBy Ross J. F
A pillar 'is a block of coal left in the first working of a coal seam for the purpose of supporting the superincumbent strata in such a manner that the winning out roadways will be safe to traver
Jan 1, 1947
-
Tarong Power Station Ash Thickening PlantBy C Hertle
GHD-Black & Veatch (GHD-BV) have completed design and specification of the ash thickening plant at Tarong Power Station, including operation of a pilot plant. Construction of the plant is in progress
Jan 1, 2003
-
Treatment of Wolfram, Bismuth, and Molybdenite Ores at Burma Queensland Corporation Mill, Wolfram, N.Q.THE old mill erected by the .Irvinebank Company consisted of 10 heads of stamps (850 lb.), rock-breaker, Hartz jig, two Krupp tables, two Luhrig vanners, three sand-pumps, one mixer; six flotation ves
Jan 1, 1920
-
Fundamentals of Open Pit Planning and SchedulingOpen pit planning and scheduling play a significant role in establishing, maintaining and improving the economics of open pit mining ventures.The development of an open pit plan and schedule involves
Jan 1, 1992
-
Atmospheric Corrosion of Extruded Silver Lead AlloysBy Hirst H, McAfee J
In December, 1934, Mr. R. Sussex extruded some silver lead alloy wires in order to determine their electrical resistance. After the determinations had been made each wire was threaded through a sheet
Jan 1, 1941
-
Isaac River Cumulative Impact Assessment of Mining DevelopmentsBy R Hardie, J Crerar, J Merritt, B Kirsch
Longwall mining and related subsidence, and watercourse diversion for surface mining operations have the potential to impact on fluvial geomorphic processes and the health of river systems. This is ev
Jan 1, 2009
-
Quantity Estimation of Concentrate in DamsAt the treatment plant of the Broken Hill South Limited, Broken Hill, the zinc concentrates, with water, are pumped out to a more or less level area, and stored in dams to dry by drainage and evaporat
Jan 1, 1925
-
Tapping Water by Diamond Drill HolesON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level
Jan 1, 1919
-
Performance of a Drainage Tunnel and Subvertical Drain SystemBy J Y. C Lo
The construction of two drainage tunnels and the associated subvertical drain system at the Po Shan area in Hong Kong was completed in December 2009. This project is the first of its kind to utilise d
Mar 8, 2011
-
Golden Cross Mine Rehabilitation Update - September 2000By A Goldstone, T Maton
The Golden Cross Mine is located on the North Island of New Zealand, at the base of the Coromandel Peninsula, approximately 8 km northwest of Waihi. The project is operated as a Joint Venture with Coe
Jan 1, 2000
-
A Review of General Considerations for Assessing Rock Mass Blastability and FragmentationBy P Lilly
Blasting is the primary comminution process in most mining operations. This process involves the highly complex and dynamic interaction between two main components. The first is the detonating explosi
Jan 1, 2001
-
Tectonics, Timing and Economic Deposits in Papua New GuieaForty two new apatite and zircon fission track analyses on the Kubor-Marum-Bena Bena area of northern Papua New Guinea severely constrain the timing of tectonic events and hence the tectonic models
Jan 1, 1997
-
Central Refrigeration Plants in GermanGerman coal mining suffers from rock temperatures up to 600C which are the same as in South Africa at 3000 - 4000 m of depth. Therefore cooling plants have increased in the last decade and today a
Jan 1, 1983
-
An Analysis of Hydrocyclone PerformanceBy Slechta JJ
The performance of a hydrocyclone treating fine coal has been examined over a wide range of feed and operating conditions.The results were expressed in terms of partition curves from which the wa
Jan 1, 1984