Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Fires and Ventilation

    By Upfold RW, Velzeboer MD

    An underground mine fire will influence the ventilation equilibrium in several ways which results in a redistribution of the ventilating quantities and pressures throughout the whole mine. The vent

    Jan 1, 1981

  • AUSIMM
    An Application of Linear Programming for Block Cave Draw Control

    By A von Johannides, G J. van Hout, L F

    In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical ægravity flowÆ rules appl

    Jan 1, 2000

  • AUSIMM
    Classification and Partition Performance of Dense Medium Cyclones

    Samples of the feed, underflow and overflow mediums from dense medium cyclones operating at low separation densities in eight commercial coal washeries were sized and analysed, to obtain comparativ

    Jan 1, 1993

  • AUSIMM
    Radar guided blasthole drilling improves product recovery

    By I Mason, M van de Werken, B Zhou, J Hargreaves, W Stasinowsky

    A critical step in open cut coal mining is clean removal of the overburden. This is usually achieved by drilling, blasting and digging. A key part of this process being successful is to stop drilling

    Sep 1, 2024

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    Selecting Optimal Operating Conditions for Knelson Concentrators

    By G K. N Subasinghe

    Metallurgists operating Knelson Concentrators (KC) often rely on manufacturerÆs recommendations for selecting operating parameters, such as fluidising water flow rate and cycle time. Recent studies ha

    Jan 1, 2006

  • AUSIMM
    Rate of Production and Cutoff Grade-A Program Systems for Teaching and Experimentation

    By Daoust G, Dubois JF

    The optimal sequence of decisions on rates of production and cutoff grades is obtained by a dynamic programming model. The main parameters are : 1. the size of the deposit, average grades and grad

    Jan 1, 1977

  • AUSIMM
    Regional Infrastructure - Rail

    The history of the rail and mining industry in Queensland over the past century is inseparable. Indeed it was mining that led to the construction of the line west from Townsville and that shaped its c

    Jan 1, 1998

  • AUSIMM
    Clarain and Durain of Greta Coal

    By Langham B. M

    A chemical study of the petrographic components of Greta (Maitland) coal, carried out by the Metropolitan Gas Co. (Melbourne), has revealed an anomaly in the composition of the durain which was though

    Jan 1, 1947

  • AUSIMM
    Environmental Performance of Large Open Pits in Western Australia - A Perspective

    By Lindbeck K

    The mining industry in Western Australia is a large sector of the WA economy providing $12 billion (1993) of the export income for the State. Historically, mining in WA developed from traditional pr

    Jan 1, 1994

  • AUSIMM
    Geomechanics: An Art to a Science?

    This paper discusses why Argyle Diamonds adopted thickened tailings disposal in 1985 and how the system was developed over the next seven years. A wide ranging review of the thickened tailings disp

    Jan 1, 1996

  • AUSIMM
    A HPGR pseudo-dynamic model approach integrated with real-time information for pressing iron ore concentrates in industrial-scale

    By T M. Campos, H A. Petit, L M. Tavares, R Olympio

    Much practical experience has been gathered in the last 30 years of application of high-pressure grinding rolls (HPGR) integrated with ball milling in size reduction of fine iron ore concentrates. The

    Aug 24, 2022

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    Thirty years since Moura No.2 – so what has changed?

    By D I. Cliff

    The loss of 11 miners in the 7 August 1994 Moura No.2 Underground Mine Disaster was the catalyst for major change in the way safety was managed in the Australian Mining Industry. The impact was felt a

    Apr 16, 2024

  • AUSIMM
    Using Reliability Modelling to Confirm Plant Design Capacity

    By B R. Olsson, N Marinopoulos

    To establish the design and the capacity of the Stanwell Magnesium Plant, Australian Magnesium Corporation Ltd (AMC) with Fluor Australia has modelled the operation of the magnesium plant using ARENA

    Jan 1, 2002

  • AUSIMM
    Electrolytic Chlorine at Mount Morgan, Queensland

    As the Mount Morgan electrolytic chlorine plant is the first of its kind installed in Australia, and as the details of this method of producing chlorine have, up to the present time, been kept more or

    Jan 1, 1911

  • AUSIMM
    Two Approaches to Truck and Shovel Mining at Leigh Creek

    By Swift D. G

    For some time the Electricity Trust of South Australia (ETSA) has been investigating the application of new mining methods and equipment to minimise the cost impact of the steadily increasing depth

    Jan 1, 1989

  • AUSIMM
    Circulating Air Classification of Manufactured Sand

    Circulating Air Classification of Manufactured Sand Due to environmental concerns, the supply and use of natural gravel has been limited by the Swedish government. The Swedish concrete industry is th

    Sep 13, 2010

  • AUSIMM
    Evolution in Panel Caving Undercutting and Drawbell Excavation, El Teniente Mine

    By P Yß±ez, G Ferguson

    The El Teniente mine produces more than 340 000 tonnes of fine copper per year from an industrial complex of underground mine, concentrator and smelter. Mass caving methods are employed to deliver app

    Jan 1, 2000

  • AUSIMM
    Application of Inductive Methods in Determining Probable Location of Orebodies Where Surface Indications Have Become Obscured

    The geologist is often called upon to give judgment on the possibilities of reviving a former mining field presumably worked out as far as the evidence then available indicated. From time to time, sca

    Jan 1, 1950