Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mount Isa Mines Limited Extensions to Plant

    Many mining companies, by their remoteness of location from source of power, have to generate their own power and must experience the same problem that had to be met when deciding to increase the capa

    Jan 1, 1953

  • AUSIMM
    Flash Point Test for Lead

    Mr. P. F. THOMPSON said this matter was one of very great importance to producers of lead. His association with the matter was that he happened to be the Institute representative on the Committee of t

    Jan 1, 1930

  • AUSIMM
    Lignite Mining at German Democratic Republic with Special Consideration of Overburden Conveyor Bridges (OCB) and Direct Dumping Combinations (XPS)

    The GDR has extensive lignite deposits at its disposal, which formed the basis for the development of an independent energy source after 1945 and which will retain their significance well beyond th

    Jan 1, 1989

  • AUSIMM
    Relationships with Government

    Mineral policy is now generally regarded as a function reserved to government. Government is reponsible for the economic health and progress of nations, and must therefore interest itself in miner

    Jan 1, 1986

  • AUSIMM
    Combustibility of Australian Coals

    By Szpindler G

    The results of pot-furnace tests with 35 bituminous coals from 20 seams in New South Wales and Queensland were used to establish the relationship between coal properties, as determined by standard lab

    Jan 1, 1962

  • AUSIMM
    A New Technique for Predicting Rock Fragmentation in Blasting

    The explosion of a charge in a drillhole sets the surrounding rock mass into vibrating stress wave motion. Except in the immediate vicinity of the drillhole, the dynamic stresses associated with thi

    Jan 1, 1995

  • AUSIMM
    Properties of Surface Films on Chalcopyrite and Pyrite and their Influence in Flotation

    By Chander S

    Properties of surface films on chalcopyrite and pyrite differ due to variations in the mechanism of oxidation of the two minerals. In the case of chalcopyrite the first step in the oxidation is the

    Jan 1, 1993

  • AUSIMM
    Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, Queensland

    By Ward B

    Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in

    Jan 1, 1986

  • AUSIMM
    Paper No. 132. Milling And Treatment of Auriferous Ores in New Zealand.

    In dealing with the pulverization and treatment of auriferous ores, it may be stated that there is not one system of treatment applicable to all classes. In the southern portion of New Zealand the ore

    Jan 1, 1903

  • AUSIMM
    Management of Ranger Uranium Mine Waters, Kakadu Region, Northern Territory, Australia

    By Bastias J

    The Ranger uranium mine has operated in the Kakadu region of the Northern Territory since 1979. The mine's water management system was designed to cater for the wet-dry monsoonal climate and to

    Jan 1, 1988

  • AUSIMM
    Ultra-Deep Hoisting Technology at Moab Khotsong

    By M Dohm, L Pretorius

    This paper provides a brief historical background to the approximately 12-year project that led to the revision of rope selection factors in the South African regulations, thus providing the ability t

    Jan 1, 2005

  • AUSIMM
    Considerations on Quality Assurance/Quality Control and Sample Security

    By G Gosson

    An important requirement in every geological quality control program is that the identity and grades of the control samples (duplicates, certified reference materials (CRMs), and blanks) must remain æ

    Jan 1, 2008

  • AUSIMM
    Technical Audits in Project Development

    By Bell MG

    At various decision points in the development of a project, a developer, joint venture partner or financial institution may require an independent review of the basic assumptions and technical asp

    Jan 1, 1983

  • AUSIMM
    An approach for evaluating a liberation function

    By Massacci P

    A review has been made of the studies focusing on methods for the description of grain -size distribution after breakage and, separa- tely, of the degree of liberation of the miner- al species makin

    Jan 1, 1986

  • AUSIMM
    Planning, Design and Construction of a Small Multi-use Tunnel in an Urban Environment

    The planning, design and construction of a service tunnel, under a major arterial road between two hospitals are described. The multiple uses of the tunnel combine to provide a favourable cost-benef

    Jan 1, 1981

  • AUSIMM
    Kelian Case Study

    By Barlow S

    The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl

    Jan 1, 1997

  • AUSIMM
    Studies in Size Separation by Screening

    Laboratory studies of batch and continuous screening of ferrous sinter mixtures (4-0.5 mm) are described. The results are analysed by an equation derived from the first-order rate law for the conditio

    Jan 1, 1985

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • AUSIMM
    Precipitation of Gold and Silver in Cyanide Solutions by Carbon

    THIS paper is the outcome of experiments carried on and experience gained. at the Waihi-Paeroa Gold Extraction Company's tailings plant at Waihi, New Zealand. The plant was erected to treat accum

    Jan 1, 1912

  • AUSIMM
    Land Reclamation at Waihi

    One of the most significant problems experienced in land reclamation work has been the tendency of earthmovers to over-compact the subsoils and topsoils. The need for extensive subsoil drainage, becau

    Jan 1, 1991