Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)By Bidwell TJ, Servant S
Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In
Jan 1, 1998
-
Business Environment 2010The global recession of the 1980s drove commodity prices down and intensified cost competition. The 1990s saw a restructuring of the mining industry with the survivors adopting new technology, signi
Jan 1, 1995
-
Alternative Joint Venture Structures Applicability to Project DevelopmentAttention is given to three possible alternative structures namely corporate joint venture, partnership joint venture and unincorporated joint venture. A corporate joint venture involves the form
Jan 1, 1983
-
Physical and Mechanical Characterisation of Paste Backfill by Laboratory and "In situ" TestingBy S Servant, T J. Bidwell
Paste backfill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In ea
Jan 1, 1998
-
Two Stage Iron Purification of Zinc Plant SolutionsBy Kershaw MG
At the Risdon plant of the Electrolytic Zinc Company of Australasia Limited, impurities toxic to the electrolytic production of zinc metal, notably arsenic and antimony, have traditionally been coprec
Jan 1, 1985
-
Sill Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice FillBy P O. Andersson
Mining of sill pillars is more difficult than the ordinary mining. The sill pillar mining is performed under more difficult conditions and the mining of the sill pillar itself produces more problems;
Jan 1, 1998
-
Environmental Aspects of Gold Processing in Western AustraliaWith the proclamation of the Environmental Protection Act, 1971-80, the Environmental Protection Authority and Department of Conser- vation and Environment were established to enhance the quality of
Jan 1, 1982
-
Towards New Swedish Recommendations for Cautious Perimeter BlastingBy M Olsson, I Bergqvist
A Swedish table of blast damage depths has, in one form or other, been in use since the late-1970s. Its history and the underlying theory are described. New experimental and theoretical findings that
Jan 1, 2001
-
Kinetics and Mechanism of Zircon ChlorinationBy Glastonbury J. R
The kinetics of the direct chlorination of, zircon in the presence of carbon was studied at temperatures between 9000C and 12000 C. From the experimental data it is prop- osed that the most likely me
Jan 1, 1973
-
Metallurgical Evaluation of an Ore Resource and its Effect on Ore ReservesThe different stages of the metallurgical evaluation of an ore resource and their importance to overall project evaluation are described. Particular emphasis is placed on the liaison that is necessa
Jan 1, 1987
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
Effect of Concentrate and Micropellet Addition on Iron Ore Sinter Bed PermeabilityBy A M. Nyembwe, A M. Garbers-Craig, R Cromarty
With the depletion of high-grade lump iron ore, concentrates have been identified as an alternative material for sinter making. Adding concentrates to the sinter mixture reduces sinter bed porosity an
Jul 13, 2015
-
Design Selection for Large-Scale Grinding Operations ù AG/SAG or HPGR?By J Hudson
Autogenous (AG) and Semi Autogenous (SAG) grinding mills are the conventional selection for large-scale grinding circuits. It is accepted that these forms of comminution are not the most energy effici
Jan 1, 2006
-
Project Evaluation – A Non-Executive Director’s PerspectiveBy R Knight
"In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.
Mar 8, 2016
-
Uncertainty in Soil Sampling ù A Case StudyBy K Luthbom, A Lagerkvist
According to the Swedish Environmental Protection Agency, the number of potentially contaminated sites in Sweden is approximately 40 000. The funding for remediation from the Swedish Government alone
Jan 1, 2005
-
A New Approach to Flexible Open Pit Optimisation and SchedulingBy A Galli
Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee
Sep 26, 2011
-
Storys Creek Remediation ProgramBy J Miedecke
A metalliferous mine has operated at Storys Creek from the 1890s to 1979. Storys Creek drains from a pristine catchment and National Park and remains as the most degraded stream from historic mining i
Jan 1, 2003
-
Corrosion of Chemical LeadThe resistance of lead to chemical attack and the ease of its fabrication has made it one of the most useful of the metals available to the chemical engineer and the electrometallurgist. It has proved
Jan 1, 1932
-
Future Mining Engineers - Educational Development StrategyBy D Laurence
Significant developments in future mining systems, technology and best practices are emerging that are driven by issues relating to human resources, competitiveness, environmental and social responsib
Jan 1, 2008
-
Mill Scaleup: Ball Collision Frequency and Collision Energy Density in Laboratory and Plant-Scale MillsBy Mishra BK, Agrawala S
The traditional method of scale-up uses the population-balance model. In particular, the selection function values for a material are determined in a laboratory mill and a variety of correlations ar
Jan 1, 1993