Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Underwater Blasting in Landslide Blocked River

    By Dhawan AK

    On 8 July 1993, a landslide of about one million cubic metres of rock blocked the river Satluj near Sanjay Vidyut Pariyojana - Bhaba project and caused flooding into the Bhaba Power House (120 MW) r

    Jan 1, 1995

  • AUSIMM
    Petrology, Geochemistry and Tectonic Implications of Magmatism in Northern Hunter Ridge-Kadavu Island Group (Fiji). (772d3817-ba1c-497f-a5a8-fb10457552d2)

    By Eggins SM, Crawford AJ, Maillet P

    The Fiji Islands are remnants of a once continuous Solomon-Vanuatu-Fiji-Tonga volcanic arc (the Vitiaz arc), located at the boundary between the Indian-Australian and Pacific plates. They record a hi

    Jan 1, 1995

  • AUSIMM
    Experiments with Air Flow Control in a Coal Mine

    By Krzystanek Z, Wasilewski S

    The problem of automatic control of a coal mine ventilation network is discussed. It is found that the structure of the control sys-tem should have two levels, i.e. local regulation of ventilation par

    Jan 1, 1985

  • AUSIMM
    Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)

    The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w

    Jan 1, 1980

  • AUSIMM
    Coal Sizing Equipment - Expression and Presentation of Result of Performance Tests

    By Partridge AC

    In order to provide a'valid description of the performance of size classifying equipment it is necessary that a standard procedure be established for testing and for the subsequent expression

    Jan 1, 1984

  • AUSIMM
    Optimisation of Reinforcement Design of Coal Mine Roadways

    By Fabjanczyk MW, Guy RJ, Tarrant GC

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi

    Jan 1, 1992

  • AUSIMM
    Underground Ore Haulage at Mount Lyell

    The Prince Lyell Mine has been the major production source at Mount Lyell since under-ground mining commenced in 1972.Three lifts of stopes have been mined to date, with the fourth, the 40 Series lift

    Jan 1, 1985

  • AUSIMM
    Studies on Chlorination of Rutile and Struverite

    By Azizan A

    The paper presents the results of chlorination of beneficiated rutile and struverite (a tantalum-niobium bearing, rutile type mineral in alluvial tin deposits) by carbon tetrachloride in the range 6

    Jan 1, 1996

  • AUSIMM
    Use of an on-line Moisture Meter to Investigate Product Moisture in Coal Preparation

    By Jensen B, Ofori P, He Y, White E, Stanmore B, Brien M, O&apos

    As part of a large AMIRA project, an on-line moisture meter was installed at two mine sites in Central Queensland. This project investigated the factors which control the moisture content of coarse (&

    Jan 1, 1995

  • AUSIMM
    Perimeter Blast Design at Mt Whaleback Mine, Newman, Western Australia

    The Mt Whaleback open cut mine South Wall is, in part, developed as an unbenched dip slope. The remainder of the rock slope consists of asymetrical overturned folds which have been locally truncated

    Jan 1, 1989

  • AUSIMM
    Sintering and Smelting Mixed Lead Carbonate û Lead Sulphide Concentrates at Mt. Isa, Queensland

    The treatment of mixed lead carbonate and lead sulphide concentrates at Mount Isa presents a problem which is unique ,in the lead smelting world; a problem whose solution is far from simple, and is no

    Jan 1, 1933

  • AUSIMM
    Development of Gippsland Basin Oil and Gas Fields

    By Stewart WJ

    Australia's first offshsore well was spudded in on 27th December 1964 and resulted in the discovery of the Barracouta gas field. Further exploratory drilling led to the discovery of the Marlin g

    Jan 1, 1970

  • AUSIMM
    Developing a Training Strategy for Quality, Safe and Productive Extracting Operations

    The extractive industry has been faced with a situation where there has been no systematic and formalised training and education structure available. Previous structures which were available, e.g. the

    Jan 1, 1997

  • AUSIMM
    Rosebery û Ore reserve Estimation, Past and Present

    The Rosebery Mine on the west coast of Tasmania is a world class polymetallic base metal deposit, containing six major minerals: galena, sphalerite, chalcopyrite, gold, silver and pyrite. This resourc

    Jan 1, 1990

  • AUSIMM
    Talisker Mine, 1862-1872 Its History and Heritage

    Silver-lead ores are widely distributed through- out the Mount Lofty and Flinders Ranges, but none of the deposits is large. Historically the Glen Osmond Mines are the most significant as the site

    Jan 1, 1987

  • AUSIMM
    A Great Project Team - Bringing Together Location and Culture

    By A M. Ebbels, D Pratt

    The current commodities super-cycle has seen an explosion in the number of mining projects demanding human resources throughout the world. The demand for key personnel currently far outweighs the inte

    May 24, 2012

  • AUSIMM
    Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz Rejects

    By P V. A van der Westhuyzen

    Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min

    Oct 5, 2011

  • AUSIMM
    Formulating and Solving Complex Minerals Industry Optimisation Problems û A Systems Approach to Complex Systems Problems

    The paper provides an overview of the development and content of APCOM symposia since their inception in 1961. This development is set within the context of the academic environment in which much of t

    Sep 26, 2011

  • AUSIMM
    A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment

    By L Nienaber

    Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper

    Mar 8, 2011

  • AUSIMM
    Description of Lead Refinery

    The building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is

    Jan 1, 1918