Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Benchmarking Comminution Energy Consumption for Improved Efficiency

    By G R. Ballantyne, M S. Powell

    A comprehensive Australia-wide survey of comminution energy consumption at copper and gold mines was presented by the authors at the 11th AusIMM Mill Operators’ Conference 2012. The database has been

    Sep 1, 2014

  • AUSIMM
    A New Look at Multiple-Point Geostatistics for Geological Modelling

    By B F. J Kelly

    Multiple-point simulation is a family of methods used to generate conditional facies simulations that present the same spatial dependence as a user-defined training image. The main advantage of using

    Sep 26, 2011

  • AUSIMM
    Slime waste to boost agricultural productivity

    By A K. Bhatnagar, S Saha, P Dixit, A K. Mukherjee, P Patra

    TATA Steel’s R&D Division at Jamshedpur has developed a slime beneficiation process to recover iron values from iron ore slime. This process recovers iron ore concentrate containing 2.2 per cent alumi

    Sep 18, 2023

  • AUSIMM
    Dynamic Decisions under Uncertainty – a Case Study on a Gold Mine

    By M Cooksey, Z Zhu, N Langrené, W Chen, T Tarnopolskaya

    "Dynamic decision-making can significantly increase the value of mining projects and deliver better sustainability outcomes under conditions of uncertainty. Despite its benefits, dynamic decision-maki

    Jun 28, 2016

  • AUSIMM
    New Mining Projects ù Expectations and Outcomes

    When preparing an appraisal, valuation or feasibility study for a new mining project it is difficult to imagine the technical, economic, social and environmental context that the project will occupy i

    Jan 1, 2004

  • AUSIMM
    Marmatite Depression in Galena Flotation

    By G Hobart

    Laboratory flotation tests were conducted to investigate the role of pH, zinc sulfate and potassium metabisulfite in the flotation of galena and marmatite in the Broken Hill orebody. Marmatite was dep

    Jan 1, 2005

  • AUSIMM
    Equipment Selection for Narrow Vein Operations

    By Hare G

    The emphasis in Australia, until recently, has been on large scale mining methods with drive sizes in excess of 4.5 metres square and the acceptance of high dilution ratios, even when working in relat

    Jan 1, 1993

  • AUSIMM
    Selection of Cell Operating Conditions to Optimise Performance of Flotation Circuits with Large Cells

    An extensive study was carried out to evaluate the performance of Outokumpu OK50, OK38 and Maxwell MX14 cells at ComincoÆs Red Dog flotation concentrator in Alaska. Tests were conducted by varying ope

    Jan 1, 2000

  • AUSIMM
    Water Management at Capcoal Mine - Past, Present and Future Drivers for Sustainable Change

    By J C. Macintosh

    Capcoal Mine has modified its water use practices over the past 15 years. Two issues have changed the way water was managed:an economic review of water supply options for a planned expansion of the co

    Jan 1, 2006

  • AUSIMM
    Grey River Gold Dredge Project (741941c7-6f5a-4b3a-ab98-8729f3fd3abc)

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989.Previous drilling indicated over 100 million cubic metres of gravels with some 90% of the gold in the bott

    Jan 1, 1990

  • AUSIMM
    Application and Description of An In-Line Injection Pipe Sampler for Pulp Sampling

    The high cost of sampling systems is largely due to the fact that indiv- idual mechanical type sampling units must be installed at the discharge end of ore/pulp pipelines, that is, at points where

    Jan 1, 1976

  • AUSIMM
    Extraction of Gold in Hallide Media

    By Davis A, Song J

    A review of the literature indicated that several studies have been reported on the dissolution of gold using iodide/iodine, bromide/bromine leaching systems. Although the reagent costs are much che

    Jan 1, 1992

  • AUSIMM
    Developments in Gas Handling and Associated Environment Activities at Smelting Plants of Mount Isa Mines Limited

    By Whitworth N, Anderson P

    New plant has been commissioned to treat off-gases from the Fluo-solids Reactor in the Copper Smelter. The new section of plant was built onto an operating system and commissioned with minimum disr

    Jan 1, 1978

  • AUSIMM
    Pre-Ore Modelling: Resource Estimation on a Minimun of Exploration Evidence.

    A new approach to resource estimation at the exploration stage is emerging, based on the application of simple software techniques. The techniques combine the power of interactive graphics with proven

    Jan 1, 1990

  • AUSIMM
    Sulphide Oxidation in Pyritic Overburden a Controlled Leach Column Study

    By Bowdler RJ, Lowson RT, Sarbutt JV

    There have been few long-term studies of sulphide oxidation under controlled conditions. The object of this study was to investigate the oxidation and leaching characteristics of pyritic mine materi

    Jan 1, 1988

  • AUSIMM
    Civil, Criminal and Professional Liability of Experts or ""Caveat Expert""

    By Jackson E

    The general level of awareness amongst members of the professions that they are faced with an increasing number of claims for breaches of their professional duty was dramatically heightened by the d

    Jan 1, 1989

  • AUSIMM
    Public Consultation in Mine Rehabilitation Planning. Morwell Eastern Overburden Dump - A Case Study

    By Eddy B. W, Washusen J. A, Wulff R. T

    The State Electricity Commission of Victoria (SECV) has been con- tinuously involved in the extraction of brown coal from open cut mines in Victoria's Latrobe Valley for over 60 years, but have

    Jan 1, 1989

  • AUSIMM
    Ventilation of Single Entry Developments at Ellalong Colliery

    By Wallman D

    Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam

    Jan 1, 1983