Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    Geostatistical Modelling of Geometallurgical Variables - Problems and Solutions

    By C V. Deutsch

    "Geometallurgical variables often cause problems to conventional geostatistical workflows. There are many variables; some are compositional and some are non-additive. They often show: complex multiva

    Sep 29, 2013

  • AUSIMM
    X-ray Computed Tomography – a Geometallurgical Tool for 3D Textural Analysis of Drill Core?

    By M A. Jardine, J A. Miller, M Becker, M Harris

    "Although the role of texture has been increasingly recognised as a geometallurgical indicator of ore characteristics and their variability, the ability to appropriately quantify and correlate it with

    Jun 15, 2016

  • AUSIMM
    Assessing static liquefaction for upstream tailings dams

    By A Litwinowicz, M Laxman, A Fourie, A L. Li

    This paper presents a design approach and analytical methods that were used for assessing the potential of static liquefaction and developing the mitigation measures for a tailings dams. The rigour of

    Jul 1, 2021

  • AUSIMM
    Thermodynamics of Indium Cadmium Melts

    By Iwu GO, Almond DP, Joasoo _

    The gravimetric integral Knudsen effusion method was used to measure cadmium activity values in binary liquid In-Cd alloys in the range 523 to 573 K. The activity measurements together with other s

    Jan 1, 1980

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022

  • AUSIMM
    Resue Firing and Dilution Control in Narrow Vein Mining

    Mining of narrow vein mineralisation, invariably depending on the mining method selected, involves the extraction of both ore and waste rock. The level to which mining of waste rock can be minimised d

    Jan 1, 2008

  • AUSIMM
    Seam Identification, Correlation and Coal Quality Prediction Using In-Seam Variations in Key Palynomorph Abundances

    Studies of the Main Seam in the Rapahoe Sector of Greymouth Coalfield have shown that the proportions of palynomorphs and palynomorph groups vary vertically within the seam, but remain laterally consi

    Jan 1, 1996

  • AUSIMM
    Dipmeter Interpretation of Intra-Latrobe Group Fluvial Sand Bodies, Basker/manta Block, Gippsland Basin

    By Rayner B

    Five wells have been drilled in the Basker/Manta Block of VIC/P19, Gippsland Basin, resulting in sub-economic Intra-Latrobe Group oil and gas discoveries at Basker-1 and Manta-1. A total of 21 indiv

    Jan 1, 1992

  • AUSIMM
    Advances in Copper Anode Reverberatory Furnace Practice

    At Copper Refineries Pty. Ltd., Townsville, two reverberatory furnaces of 420 tonnes capacity are used to melt 210000 tonnes/year of copper for subsequent anode casting. When the refinery commenced pr

    Jan 1, 1977

  • AUSIMM
    Financial Assurance for Strongman Mine

    By M Pizey

    After 60 years of operation, coal extraction at Solid Energy New ZealandÆs (SENZ) Strongman Mine, near Rapahoe is scheduled to end in early 2005. Up until 2003 the closure bond for Strongman Mine was

    Jan 1, 2004

  • AUSIMM
    Forty Years of Sample Preparation - A Personal Journey

    I began my interest in sample preparation when I joined the Institute of Nuclear Sciences in 1962. I worked in the fields of rock dating and stable isotope geochemistry. Preparing a sample could take

    Jan 1, 2008

  • AUSIMM
    Energy for TomorrowÆs World

    The reality is that in today's world almost half of nearly six billion people on the planet do not have access to commercial energy and the services it brings. Based on UN projections, in 30 ye

    Jan 1, 1997

  • AUSIMM
    Attitudes and Safety

    In essence, these statements concur, However, management predominantly controls the organisation's communication environment (5), Consequently, the participation by employees in safety is gre

    Jan 1, 1979

  • AUSIMM
    Explosive Ground Reactivity Phenomenon

    A number of mines in Australia have experienced premature detonations caused by bulk explosives reacting with the rock type being blasted. Premature detonations are extremely high risk events as they

    Jan 1, 1999

  • AUSIMM
    Outline of Electrical Plant Layout Mount Isa Mines Ltd

    By Edmonds G. A

    The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a

    Jan 1, 1953

  • AUSIMM
    A New Approach to Planning New Coal-Fired Power Stations in Developing Countries

    By Walsh V

    The Australian economy has been adversely affected by the hesitation in developing countries to commit to the construction of .new coal-fired power stations. World coal trade which was expected to

    Jan 1, 1987

  • AUSIMM
    Pilot Study on Blast Movement Monitoring at Geita Gold Mine

    By F Mwijage

    "The benefits of measuring blast movement to reduce ore loss and dilution have been recognised by many people for many years and various methods have been used with limited success. Geita Gold Mine is

    Mar 26, 2012

  • AUSIMM
    Investigations and Improvements to Ground Control Systems Used at Xstrata Copper ù Mount Isa Copper Operations

    By B Andrew, L Krois

    Ground control systems, including ground control management, play an integral role in the effective and efficient extraction of copper ore at the Xstrata Copper û Mount Isa Copper Operations (MICO). R

    Jan 1, 2005

  • AUSIMM
    Opportunities for Partnerships in Contract Mining

    The underground mining of a narrow vein hard rock orebody is a capital and labour intensive method of extraction. Due to the nature of underground mining it is difficult for higher level managers to p

    Jan 1, 2006