Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gippsland Basin South Platform: Unprospective or Underexplored?

    I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r

    Jan 1, 1992

  • AUSIMM
    Simulation for Dependable Mining Automation

    A discussion on simulation tools to aid the development of robotics platforms is presented. The focus of the work is towards mining robotics platforms where operations are typically in unstructured, u

    Dec 6, 2010

  • AUSIMM
    Catchment-Scale Water Modelling and its Role in Risk Management during Mining Exploration

    By H He, S Tillotson, S Gibbons, J Shaw

    "Water evaluation and management during mining exploration and operational activities is crucial to minimise direct and indirect operational costs and also in delivering mining companies the less tang

    Nov 26, 2013

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012

  • AUSIMM
    Investigation of silica removal by reverse flotation to improve quality of mixture concentrates produced through spiral gravity separation and Slon-VPHGMS process

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    This research was done to reduce silica from mixed hematite concentrate of Barfkar Iron Ore Sample and increase Fe grade using reverse flotation method (Depressing Hematite and floating Silica). The u

    Aug 24, 2022

  • AUSIMM
    Upgrading Processes in BIF-Derived Iron Ore Deposits ù Implications for Ore Genesis and Downstream Mineral Processing

    Ore textures in Australian BIF-derived ores are quite complex and have formed the basis for ore genesis models, which includes hypogene upgrading or supergene upgrading then regional metamorphism for

    Jan 1, 2002

  • AUSIMM
    Alternative mineral processing strategies for copper-gold tailings management

    By C Antonio, R Narayan, A Scheuermann, S Quintero, M Edraki, M Ziemski

    Tailings are mostly loose material and can be classed as non-plastic sandy silts. They also tend to have low permeability, resulting in slow consolidation (settling) rates and low shear strength, even

    Aug 2, 2023

  • AUSIMM
    Diversion decision making with an integrated approach to design for operations and mine closure

    By M Rafty, A Markham, S Atkinson

    Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete

    Jul 25, 2018

  • AUSIMM
    Mount Angelo Copper Prospect, East Kimberleys, W.A.

    The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t

    Jan 1, 1966

  • AUSIMM
    New Competencies in Mining ù Rio TintoÆs Experience

    In the mid-1990s, after a long period of antipathy between the company and its detractors, Rio Tinto embarked upon an ambitious cultural change program that sought to transform the fundamental basis o

    Jan 1, 2002

  • AUSIMM
    Outsource or Owner Operate

    The decision to contract or owner mine should be independent of, and should be made before, definitive estimated cost comparisons could be available. There is substantial potential risk of estimated c

    Jan 1, 2003

  • AUSIMM
    Presidential Address 1981 "Knowledge & Mineral Industry Growth Rates"

    This paper sets out to examine the possible relationships between three factors, they are, the rate of growth of world production of minerals, the growth of Australian production and the growth of sci

    Jan 1, 1981

  • AUSIMM
    Electrum and Gold Fineness of Some Hauraki Epithermal Gold-Silver Deposits

    By G A. Challis, A B. Christiel

    Microprobe analyses of electrum grains in some Hauraki Au-Ag deposits indicate that gold fineness is in the range of 500 - 800 (50 - 80 per cent Au), but for most deposits the range is usually narrowe

    Jan 1, 1992

  • AUSIMM
    Process Optimisation Using Real-time Tracking of Coarse Material in Individual Cyclone Overflow Streams

    By J Mercuri, S Dunford, P Rothman, E Bartsch, J Snyder, D Newton, R Maron, D Cirulis

    The purpose of a mineral comminution circuit with a ball mill running in closed-loop with a hydrocyclone classification cluster is to feed the downstream process with the target particle size. Maintai

    Sep 7, 2015

  • AUSIMM
    Isometric Mines Plans: Their Applications, Limitations, and Method of Construction

    IN the construction of a set of ordinary mine plans, two axes or coordinates are used; also, two different projections are essential viz., a plan (horizontal projection) and longitudinal section (vert

    Jan 1, 1919

  • AUSIMM
    Statistical Thermodynamic Approach to Chain Polymers in Binary Silicate Melts

    By Mehrotra G. M, Frohberg M. G

    Based on the concepts of statistical thermodynamics of athermal mixtures, an approach is developed which is capable of quantitatively explaining the thermodynamic properties of binary silicate systems

    Jan 1, 1975

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    Robust Decision Making û Application to Mine Planning Under Price Uncertainty

    By F Grobler

    Many projects fail because project performance in unfavourable economic conditions was not anticipated at the investment decision stage. This type of failure may have been avoided through the selectio

    Sep 26, 2011

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020