Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
The Direct Outokumpu Nickel Smelting (DON) Process and the Harjavalta ExpansionBy MattelmSki M
Outokumpu Harjavalta Metals Oy has been producing nickel since 1962, based on conventional flash smelting technology followed by electrowinning of nickel. In the 1980s, a research project was initia
Jan 1, 1996
-
Anatomy of a Heating and Assessment of Critical Self-Heating ParametersNumerical modelling is a valuable tool for simulating the fundamental processes that take place during a heating. The models presented in this paper have enabled a quantitative assessment of the effec
Jan 1, 2005
-
Overview of the Acid Rock Drainage and Overburden Management Program at PT Freeport Indonesia Operations in Papua Province, IndonesiaBy D Michaelsen, S Miller
The Grasberg Mine is a copper and gold open pit mine operated by PT Freeport Indonesia (PTFI) and located in the high equatorial mountains of the Indonesian province of Papua. The climate is alpine/su
Jan 1, 2003
-
Mining Grade Control ù Past, Present and FutureThe objectives of mining grade control are presented and examples of the techniques used in various open pit and underground mines are used to define the attributes of good grade control. Reasons are
Jan 1, 2000
-
The Palaeoproterozoic Warramunga Formation, Tennant Creek Block, Central Australia: Sedimentology, Geochemistry and ProvenanceBy N Donnellan
The Palaeoproterozoic Warramunga Formation is notable as the host to the enigmatic, so-called 'Tennant Creek style' mineralisation. These polymetallic (but mainly Au-Cu-Bi) ore deposits t
Jan 1, 1994
-
Assigning Value to a Drill and Blast Wall Control Program Through Reduction in the Risk ProfileBy S B. Sheldon
Wall control programs tend to be expensive and consequently require financial justification in order to get approval for the expenditure required. The difficulty faced in getting this approval is that
Nov 8, 2011
-
Is Perception Reality? Evaluating the Fiscal Attractiveness of International Jurisdictions for Gold Mining InvestmentBy J P. Sykes, C Gemell, A Trench
The perceived and actual impact of government mineral policy upon the government share from gold mining revenues is assessed for ten key countries in which the gold sector is of relevance in advancing
Jun 22, 2016
-
What Drilling Density is Optimal? ù A Case Study From the Golden Pig MineBy D Whitworth
The Golden Pig mine has embarked on a diamond drill program design philosophy that increases flexibility of the program by greatly increased drill pattern densities. The use of standard broad pattern
Jan 1, 2002
-
Prediction of Geomechanic Situations and Planning of Mining Operations at Coal Mines of Kuzbass, USSRThe complicated mining-geological conditions in the Kuzbass have led to some difficult mining situations in the past. Now, with historical data, supplemented by geomechanical information and measureme
Jan 1, 1991
-
Open Issues in Tunnel Boring Machine Excavation of Deep TunnelsBy G Barla
In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h
Mar 8, 2011
-
Improving Geological and Metallurgical Understanding of Plutonic Gold Mine, Western Australia, using Three-Dimensional Visualisation of Portable X-Ray Fluorescence DataBy M F. Gazley
The amphibolite-facies metabasaltic rocks of the Mine Mafic Package at Plutonic Gold Mine, Marymia Inlier, Western Australia, contain an estimated total endowment of 12.2 Moz of Au, which includes 4.7
Aug 22, 2011
-
Thermal Degradation of Lump Ore in the Top Shaft of Blast FurnacesBy M Kilburn, A Edenton, M Adam, A Dehghan-Manshadi, R Smyth, L Lu
The blast furnace is a counter current reactor. The counter current principle of the furnace makes it very efficient in transferring the heat and mass required to drive the reduction reactions inside
Aug 12, 2013
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Stope Design Within a Final Pillar Retreat Sequence at Xstrata Copper's Mount Isa Copper MinesXstrata CopperÆs Mount Isa Copper Operations is located in mineral rich north-west Queensland and is one of the largest sources of copper in the world. This world-class underground operation is planne
Jan 1, 2007
-
Recommended Design Methods and Serviceability Limits for Permanent Rock BoltsBy D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
Operational Management of Underground In-Seam Drilling SitesBy ZáWang, F Hungerford, T Ren
Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov
Jul 1, 2013
-
Ventilation Survey Procedures and Database for Use with Computer Simulation TechniquesBy Nixon TR
The Australian Coal Industry Research Laboratories Ltd. (A.C.I.R.L.) MINVENT computer program can be used to simulate existing and projected colliery ventilation requirements. New collieries can be
Jan 1, 1983
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy ConcentratorBy C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Investigations of Dissolved Oxygen in SteelmakingBy Henderson J, Ward RG
Dissolved oxygen has been measured directly using a rugged, reliable, accurate electrochemical probe system developed for steelworks application by B.H.P. Central Research Laboratories. Furnace mea
Jan 1, 1972