Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dynamic Simulation of Size Reduction Operations from Mine to Mill

    By Pate W. T

    This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone

    Jan 1, 1998

  • AUSIMM
    Numerical Modelling of Coal Spontaneous Combustion With Moisture Included

    A mathematical model for spontaneous combustion of coal with moisture included is presented in this paper. The one-dimensional unsteady state model consists of conservation equations for oxygen, water

    Jan 1, 2005

  • AUSIMM
    The Greenhouse Effect and High-Moisture Coals

    By Fernando N, Guang LX

    Brown coal in Victoria in spite of its substantial reserves is not utilized greatly because of its high moisture content(-65% w/w). Transportation and handling costs of raw brown coal, on an availa

    Jan 1, 1989

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    Trommel panel development for iron ore applications

    By R Wilson, R Williams, B Freeburn

    McLanahan RSS14x50 scrubber screens have individually processed over 50 Mt of Pilbara iron ore. The first stage of separation in these plants with abrasive, high specific gravity, large lumps is an ex

    Jul 24, 2017

  • AUSIMM
    Commercial Equipment Designed to Recover Gold from Gravitational Concentrates by Means of Magnetic Separation and the Separation in Magnetic Fluids

    By Krokhmai VS, Sayko OP

    The paper summarises the theoretical and experimental studies which led to the development of new industrial equipment designed to recover liberated gold from placer gravity concentrates. The new te

    Jan 1, 1993

  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014

  • AUSIMM
    Rehabilitation: Where Are We Now?

    Rehabilitation has been very effective in the short to medium term in providing a cost effective and reliable means of containing the side effects of land disturbance. However, there is still insuffic

    Jan 1, 1992

  • AUSIMM
    The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processes

    By P Willems, J B. Crow, R Dale

    Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a

    Mar 22, 2022

  • AUSIMM
    Determination of Antimony in Ores by Atomic Absorption Spectrophotometry

    A method is proposed for the determination of antimony in ores. Antimony is volatilized as antimony iodide by heating with ammonium iodide at a controlled temperature.The fusion mixture is extracted w

    Jan 1, 1972

  • AUSIMM
    Welcome to the University

    Mr. President, Ladies and Gentlemen, it gives me great pleasure to welcome you, on behalf of the Council and Administration, to this University and extend to you our very best wishes for a most succe

    Jan 1, 1975

  • AUSIMM
    CFD modelling of slag fuming, with focus on freeze-lining formation

    By N Voller, A Ishmurzin, G Hackl, M Wu, A Kharicha, M Chintinne, C M. G Rodrigues, A Ludwig

    Slag fuming (SF) is a critical process for recycling zinc-containing slags, but the corrosive nature of molten slag poses challenges to the reactor durability. The freeze-lining (FL) technique offers

    Aug 21, 2024

  • AUSIMM
    Attitudes and Safety

    In essence, these statements concur, However, management predominantly controls the organisation's communication environment (5), Consequently, the participation by employees in safety is gre

    Jan 1, 1979

  • AUSIMM
    Enhancement of the Becher Process by Ball Milling

    Ilmenite (FeTiO3) is the primary global source of titaniumdioxide which is commonly used as a whitening agent in papermanufacture and a pigment in paint manufacture. In WesternAustralia ilmenite is pr

    Jan 1, 1997

  • AUSIMM
    Strategic mine schedule optimisation

    By A Tsoy

    This abstract describes long-term mining schedule optimisation approach that may be suitable for complex marginal projects and is based on modern scheduling techniques. CITATION: Tsoy, A, 2018. Strate

    Nov 21, 2018

  • AUSIMM
    Towards Tomorrow’s ‘Smart Mine’ – Embedded Sensor Telemetry and Sensor-Based Sorting

    By B Klein

    This paper stems from research and development in sensor and sorting technologies towards future sustainable mining undertaken by the UBC Mine-Mill Integration group in collaboration with MineSense Lt

    Nov 22, 2011

  • AUSIMM
    Stereometric Analysis of Ore Aggregates for Predicting Energy Savings During Disintegration of Ores

    By E L. Kotova

    Completeness of extraction of a mineral from ore depends on many reasons. First of all it is a function of quality of disintegration of ore. It is supposed that two basic factors: character of structu

    Jan 1, 2008

  • AUSIMM
    The Flash-Point Test for Lead

    IF lead be heated with concentrated sulphuric acid two distinct actions will usually be observed. In the first, bubbles begin to be evolved more or less rapidly from the lead, and in the second, which

    Jan 1, 1930

  • AUSIMM
    Estimation of Rock Load for Tunnels with Different Disturbance Factors

    By J Rostami, T Afshar, M Sharifzadeh

    Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the

    Sep 17, 2014