Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Schrödinger’s kittens – lifting the lid on resource drill hole data after mining

    By D Corley, J Moore, M Grant, A, W R

    Resource estimates are the corner stone of technical and investment decision-making. Prior to mining, resource estimation uncertainty has the greatest potential to lead to poor investment decisions, d

    May 24, 2023

  • AUSIMM
    Resource and Reserve category inflation – known rewards, hidden risks

    By M Bond, R R. Hargreaves, G W. Booth

    There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio

    May 24, 2023

  • AUSIMM
    Yilgarn Star ù Just in Time Methodology ù Planning and Scheduling Implications

    By G Haywood

    This paper presents the evolution of the planning, scheduling and mining practices at the Yilgarn Star underground. The paper will concentrate on the principals of æjust in timeÆ and the impact of suc

    Jan 1, 2002

  • AUSIMM
    Measurement of Blast Vibrations: Compliance under the RMA

    With the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra

    Jan 1, 1996

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)

    By Aiming Z, Shenyi S, Xialei W

    Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill

    Jan 1, 1998

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Remnant Ore Model Generation and Categorisation Post-block Caving Extraction at Salvador Mine

    By F Farías, D Villa

    Codelco’s Salvador Project has been operating a block/panel caving mine for more than 50 years. This underground mining method dynamically mixes the ore and dilution. As a result, forecasting grades i

    May 9, 2016

  • AUSIMM
    Phase equilibria of Al2TiO5–Ti3O5 pseudobrookite solid solution in the Al2O3–TiOx system under various oxygen partial pressures

    By W Y. Kim, Y B. Kang, Y J. Park

    The phase equilibria in the Al2O3–TiOx system were investigated in wide ranges of temperature and oxygen partial pressure: 1300~1600°C and 10-16.6~10-8 atm, respectively. The equilibrium phases and th

    Aug 21, 2024

  • AUSIMM
    The Electrolytic Refining and Smelting Company of Australia Limited

    Power Plant. The power for the metallurgical operations is supplied by the company's own power plant, which is centrally situated. Power is also supplied to Metal Manufactures Ltd. and Australian

    Jan 1, 1938

  • AUSIMM
    Staff Development and Training at Geita Gold Mine, Tanzania

    By C Kusi-Manu, E Nyamusika

    Geita Gold Mining Limited (GGML) is owned and jointly managed by Ashanti Goldfields Company (Ghana) and Anglogold (South Africa). The mine is currently one of the largest gold producing open pit opera

    Jan 1, 2003

  • AUSIMM
    The Making and Evaluation of Directly Reduced Iron Pellets

    By J K. Wright

    In recent years the production of steel from directly reduced iron ore pellets has expanded rapidly. However, continued growth will depend on an adequate supply of suitable raw materials for the vario

    Jan 1, 1980

  • AUSIMM
    Outside Auger Hollow Claw Tipped Mechanical Sampler for Coal

    By Z-Y Pi, B Zhang, S Wen

    "The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i

    Aug 21, 2012

  • AUSIMM
    An Application of Linear Programming for Block Cave Draw Control

    By A von Johannides, G J. van Hout, L F

    In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical ægravity flowÆ rules appl

    Jan 1, 2000

  • AUSIMM
    Experiences in Developing Applied Mining Research Contracts

    The Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing

    Jan 1, 1986

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Influence of Blasthole Delay Times on Fragmentation as well as Characteristics of and Blast Damage behind a Remaining Bench Face through Model-scale Blasting

    By P Moser, P Schimek, F Ouchterlony

    This paper summarises the findings of 27 model-scale bench blasts in magnetic mortar, which were conducted from 2011 to 2014 at the blasting site of the Montanuniversitaet Leoben.The aim of the study

    Aug 24, 2015

  • AUSIMM
    Cadmuim-Base Bearing Metals

    In considering the preparation of any paper concerning bearing metals, one feels a certain amount of diffidence in venturing into a field which has been capably explored at great length and in great d

    Jan 1, 1934

  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014