Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Greenvale Mine and Railway

    Development of the Greenvale orebody, containing 40,000,000 tonnes of nickel ore, began in 1971 and production commenced in 1974. Annual capacity is 2,800,000 wet tonnes. The variations in ore grade

    Jan 1, 1974

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case Study

    By D Kentwell

    For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e

    Jul 13, 2015

  • AUSIMM
    Opportunities in the Contract Mining Industry

    Thank you for the opportunity to speak at this important conference attended by aspiring mining professionals, some of whom will become the leaders of the mineral resources industry that forms the sol

    Jan 1, 2002

  • AUSIMM
    The Role of Cost Estimating in Mine Planning and Equipment Selection

    The objective of a mine planning exercise is to plan a safe mine that maximises net present value (NPV) for the project. Two primary elements are key to design of a mine plan optimised to maximise pro

    Dec 6, 2010

  • AUSIMM
    Cost-Efficient Implementation of a Greenhouse Gas Reduction Roadmap in the Mining and Metallurgy Industry

    By M Russ, J Gediga

    This paper shows an economic feasible approach to implement greenhouse gas (GHG) reduction measures into the mining and metallurgy industry (MMI). The goal to improve energy consumption is directly li

    Jan 1, 2009

  • AUSIMM
    Successful Raiseboring in Poor Ground Conditions, Kencana Mine, Indonesia

    Ground conditions at the Kencana mine, Indonesia, are generally poor and an underhand cut and fill mining method is used for extraction. Due to these poor ground conditions, all vertical development h

    Nov 25, 2010

  • AUSIMM
    Mining and Sustainable Development ù A WWF Perspective

    Mineral exploration and development can have a significant impact on the environment and local communities, in some circumstances extending well beyond the mine site. Poor environmental performance an

    Jan 1, 2002

  • AUSIMM
    High accuracy .D airborne electromagnetic inversion method for banded iron formation and other geological settings

    By D FitzGerald, S Jakica, R Paterson, J Silic

    A new 2.5D airborne electromagnetic (AEM) algorithm has been developed by Intrepid Geophysics and Jovan Silic & Associates. The advantage of 2.5D (2D geology, 3D source) AEM inversion in 3D geolog

    Jul 24, 2017

  • AUSIMM
    Characterisation of the Iron Bridge magnetite project

    By B Godel, E R. Ramanaidou, M Verrall

    Fortescue Metals Group Ltd Iron Bridge (IB) operation is a magnetite deposit located in the Pilbara region of Western Australia situated around 145 km south of Port Hedland. This Mesoarchean deposit b

    Sep 18, 2023

  • AUSIMM
    Gold Grade Distribution and Estimation in Narrow Vein Systems

    By A E. Annels, I P. Hodkinson an, S P. Barr

    Narrow vein systems represent an important source of gold, which have generally been exploited by small to medium sized companies. Their evaluation poses particular problems because of their grade and

    Jan 1, 1999

  • AUSIMM
    Isometric Mine Plans

    MR JOHN S Foxall wrote: Mr Clayton in his paper on the above subject (Proceedings, N.S. No. 34) made an assertion which should not be allowed to remain unchallenged. On the top of page 10 appears the

    Jan 1, 1920

  • AUSIMM
    Mine to Tunnel Scale Discontinuum Simulation of Repeated Dynamic Loading of Mine Excavations

    Underground excavations are subjected to complex stress changes caused by nearby mining, but may also be affected by repeated dynamic loading from blasting and seismic events. In some cases, the combi

    Nov 25, 2010

  • AUSIMM
    Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

    In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting

    Jan 1, 2001

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    Hydroseparation Concentrates and Automated Precious Metal Searches Used to Characterise Process Products from Selected Mines

    By R Lastra, Y Choi, C Hamilton, P Kondos

    Hydroseparation (http://www.cnt-mc.com) was used to concentrate sized fractions (from <38 ¦m to 150 ¦m) of various ore products ahead of carbon-in-pulp (CIP)-treatment. The resulting size-by-size c

    Jan 1, 2008

  • AUSIMM
    Incorporating economic variability into a strategic planning framework

    By E Holloway

    The optimisation of an open pit mine can be broadly split into two stages, the first being the ultimate pit optimisation (and subsequent stage designs), and the second being schedule optimisation. Mac

    Nov 21, 2018

  • AUSIMM
    LaModel – A Program for Coalmine Modelling

    By K A. Heasley

    The LaModel program was initially developed in 1993, and it is used to model the stresses and displacements in thin tabular deposits such as coal seams. It uses the displacement-discontinuity variatio

    Nov 5, 2014

  • AUSIMM
    Effect of oxygen on the interfacial phenomena and metal recovery rate in recycling process

    By Y-B Kang, J H. Park, J Park

    In order to understand the effect of oxygen injection into the molten metal on the valuable metals (VM) recovery and interfacial phenomena, several high-temperature experiments were conducted using a

    Aug 21, 2024

  • AUSIMM
    Design of a Leaching Strategy to Extract Gold from Eleonore Mine Ultra-Fine Sulfide Concentrate

    By G DeschOnes, M Fulton

    The Eleonore property (James Bay district of Northern QuTbec), owned by Goldcorp, hosts gold within stockworks of quartz-tourmaline-arsenopyrite veins and veinlets contained within microcline (potassi

    Sep 26, 2013