Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Transfer Function – New Method to Accurately Predict Resonant Frequencies of a Highwall

    By R Osterman

    As mining companies have to go deeper in search of ore and coal, the importance of protecting the highwall increases. Wall fatigue also increases with importance of the long life expectancy of a highw

    Aug 24, 2015

  • AUSIMM
    "The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"

    By J L. Macdonald, G S. King

    "The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts

    Jun 15, 2016

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    The "Indicator" Feature in Some Gold Occurences

    A way back in 1851-2 an army of diggers had commenced the conquest, of the now famous goldfields of Australasia. At that time, and in the Colony of Victoria, more that 10,000 were camped on and around

  • AUSIMM
    Conceptual Design of a Dry-stacked Coal Rejects Facility in a Subtropical Climate

    By A M. Barrett, P J. Chapman

    As filtering technology improves and there is an increased focus on environmental impacts, the concept of managing fine coal rejects by filtering, mixing with coarse rejects and dry stacking them is b

    Jul 27, 2015

  • AUSIMM
    Main Events in the History of Mineral and Energy Resource Development in New Zealand

    By A B. Christie, R L. Brathwaite

    Since the first occupation of New Zealand in 800 - 900 AD, various useful minerals, rocks, and energy resources have been identified and extracted. The Maori prized greenstone for ornaments, tool

    Jan 1, 1993

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    Mine Rehabilitation for Sustainable Landcare: Cost-Effective Strategies

    By R Simcock

    Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve

    Jan 1, 1997

  • AUSIMM
    Social Factors That Are Essential for a New Type of Engineer

    Professional engineers of today require a wide array of experience and knowledge. It is true that commonly engineering degrees do teach the technical requirements well, but do fall short in the way of

    Jan 1, 2004

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • AUSIMM
    Project Management

    Mining and metals projects have tended to increase in both scope and cost to a point where many projects are Droperly designated as superprojects. Specialist engineer- constructors have developed or

    Jan 1, 1980

  • AUSIMM
    Coal Utilization in Modern Steelworks Practice

    By Brook W. H

    The history of the reduction of iron from its ores is lost in antiquity. Archreologists state that man has practised it for over four thousand years. Until comparatively recent times charcoal was the

    Jan 1, 1947

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    A Two-Component Model of Blast Fragmentation

    Prediction of fragmentation by blasting is most commonly based on theassumption that a single distribution of pre-existing discontinuities is present within a blasted rock volume and that the underlyi

    Jan 1, 1999

  • AUSIMM
    Benefits from Change in Pipeline Hydrate Inhibitor

    Esso Australia Ltd. operates a large natural gas producing system in the Gippsland Basin, supplying gas to the Gas and Fuel Corporation of Victoria, the State Electricity Commission of Victoria an

    Jan 1, 1982

  • AUSIMM
    The Use of a Portable Aerosol Counting System to Characterize Dust Clouds and Evaluate Control Methods in Underground Metal Mines

    By Bigu J, Grenier M. G, Knight G

    Particulate control is a major concern in underground mining and the subject of continuing research world wide. In Canada the federal government's Mining Research Laboratory at EIIiot Lake, O

    Jan 1, 1988

  • AUSIMM
    What is Expected of Explorers

    Miners and explorers in New Zealand are expected to consult with stakeholders, keep out of core conservation areas, and operate a high standard of environmental management and rehabilitation. These re

    Jan 1, 1997

  • AUSIMM
    Off-Grid Solar in the Mining Sector - Can Renewable Energy Reduce your Operating Costs?

    By C Chambers

    "AustraliaÆs mining sector faces challenges to its competitiveness; operating costs are being adversely affected as a result of volatile commodity prices and growing international market pressures.Die

    Jul 15, 2013

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    Assessment of Underground Production Blast Designs and Blasting Performance

    By B Mohanty, D Zwaan

    Systematic near-field vibration monitoring of stope blasts was carried out in a large, deep underground mine. A total of 31 production blasts were studied in order to investigate the effectiveness of

    Aug 24, 2015