Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance

    By D Morgan, K Jones

    "In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co

    Oct 10, 2016

  • AUSIMM
    Saving Your Back(s) (Reducing Overbreak and Perimeter Damage Through the Safe and Cost-Effective Application of Drill and Blast)

    Over the last 15 years working in the mining, construction and extractive industries, one of the areas that has always concerned and at the same time drawn the author to it is the application of drill

    Jan 1, 1999

  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    Five Years With Paste Fill ù Experience at Henty Gold Mine

    By T J. Grandfield

    Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to

    Jan 1, 2002

  • AUSIMM
    Dependence of the variance of lot average on the sampling mode and heterogeneity type of the lot

    By P Minkkinen

    "Pierre Gy showed in his early works that the results in estimating the variance of the mean value of continuous lots depends on sampling mode (random, stratified or systematic), except in the theoret

    May 9, 2017

  • AUSIMM
    Application of a reinforcement learning AI solution for optimisation of screening shuttles control

    By A Horeth, E Duggan, B Versiani, A Gooch

    Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati

    Nov 8, 2021

  • AUSIMM
    Eco-Environmental Problems Caused by the Process of Limestone Mining and Management Options

    By X X. Qiu, T Zhang, B L. Wang, X Qiu, Y H. Du

    This paper summarises the information about current state of eco-environmental problems, geological disaster and mining waste causing during the process of limestone mining. By comparing the managemen

    Jul 10, 2012

  • AUSIMM
    Refurbishment of Brisbane's Rail Tunnels for Electrification

    By Fejes G

    An integral part of the Brisbane Suburban Railway Electrification involved the relining, refurbishment and track lowering in the Roma Street, Brunswick Street and Gloucester Street double track tu

    Jan 1, 1981

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Where are the Women? Highly Qualified Women in the Mining Industry

    By M Scoble, C Hughes, M Roberts

    At 14 per cent, the representation of women working in the mining industry is the lowest among primary industry categories in Canada. Despite an increase in research and industry commitment to advance

    Nov 20, 2012

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimising the Rate of Froth Recovery Using Outokumpu FrothMaster<sup>TM</sup>

    By P Bourke, S Ronkainen

    Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and re

    Jan 1, 2000

  • AUSIMM
    Rewriting the rule book – geology organisational design

    By T McLeod, B Catto

    AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t

    Sep 20, 2017

  • AUSIMM
    Telfer Processing Plant Upgrade - The Implementation of Additional Cleaning Capacity and the Regrinding of Copper and Pyrite Concentrates

    By D R. Seaman, B Adamson, F Burns, B A. Seaman, P Manton

    The Telfer concentrator, located in the Great Sandy Desert of Western Australia, consists of a dual train gold/copper operation processing ore from one underground and, currently, two open pit mines w

    Oct 29, 2012

  • AUSIMM
    The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations

    By W Mahoney, F Clement, E Saraiva

    Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t

    Sep 17, 2014

  • AUSIMM
    The Integration of a Due Diligence Process into a Mining Operation

    A mining operation can be identified as demonstrating prudent management when a number of vital characteristics are evident.All risks and opportunities that are critical to the on-going success of the

    Jan 1, 1998

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Australia’s hydrogen export in the form of embedded mineral derivatives

    By R Daiyan, G Burge, M Haider Ali Khan

    Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary

    Sep 1, 2024

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011