Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Bloating Characteristics of some South Australian Clays and Shales

    By Sheridan GD

    Fifteen samples 'of clays and shales from the Adelaide area were selected from a total of 84 as representing material of possible value for the manufacture of light-weight aggregate. A detailed e

    Jan 1, 1963

  • AUSIMM
    No. 3 Breaker Station and Mullock Bin

    When the new No. 3 Shaft is in full operation, the main hoisting duties will be in connection with the raising of: (a) ore from the various mining operations, and (b) mullock, or broken country rock,

    Jan 1, 1957

  • AUSIMM
    Applied Remote Sensing Research For Mineral Exploration

    The Division of Minerals and Geochemistry in collaboration with three mineral exploration companies, Mawson Pacific Ltd, Ramsgate Resources Ltd and Tectonic Systems Pty Ltd commenced a two year re

    Jan 1, 1987

  • AUSIMM
    A Study of Floor Heave in the Mines of the Southern Coalfield of New South Wales by Two Dimensional Finite Element Modelling

    By Seneviratne SP

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. A

    Jan 1, 1992

  • AUSIMM
    Paper No. 126. Silver-Lead Ore Mining And The Various Systems of Stoping And Timbering Employed in Broken Hill, New South Wales.

    As this district is so far distant from the other mining centres and its mode of approach so circuitous, I am afraid that many residents of other portions of the Commonwealth never think of paying thi

    Jan 1, 1903

  • AUSIMM
    Database of TBM Projects Undertaken Between 1950 and 1990 and an Assessment of Associated Ground Strength Limitations

    A review of all major TBM projects from 1974 to 1990 has been undertaken and the results entered into a database. A similar database was prepared from information obtained from a principal TBM manufac

    Jan 1, 1993

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • AUSIMM
    Kwinana Nickel Refinery - Recent Plant Changes

    By Troman L, Groutsch J. V

    The Kwinana Nickel Refinery began operations in 1970 processing sulphide concentrates from Kambalda using the Sherritt Gordon pressure leach and hydrogen reduction process to produce nickel metal as

    Jan 1, 1996

  • AUSIMM
    Rehabilitation of Mine Tailings by Simultaneous Prevention of Oxidation and Treatment of Acid Effluents Using a Wood-Waste Cover

    By N TassT, J Cyr

    At the East Sullivan site, wood wastes covering the abandoned mine tailings impoundment prevent sulfide oxidation by creating an anoxic environment. The addition of coarse ligneous wastes and their hi

    Jan 1, 2003

  • AUSIMM
    Bulk Sampling of Complex Gold Deposits - Material Characterisation and Program Design and Management

    By I M. Platten, Y Xie

    Complex gold deposits are generally characterised by variable geometries, strong structural controls on grade distribution and a high-nugget effect. The use of diamond drilling and fire assays in this

    Jan 1, 2008

  • AUSIMM
    The Perseverance Gold Deposit ù The Next Step at Peak

    By R Berthelsen

    The Peak Gold Mines Pty Ltd (PGM) operations are located approximately 9 km south of Cobar, NSW. PGM currently mines and treats ore from three separate orebodies within 5 km of the original plant. Pro

    Jan 1, 2004

  • AUSIMM
    Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling (95e85735-3d90-4a78-b6e4-557395ba00bb)

    By Gleadow AJW, Foster DA, Kohn BP, Raza A

    A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the southeastern highlands and along the continental margin of Australia provides

    Jan 1, 1995

  • AUSIMM
    Sinking No. 3 Elliptical Shaft at North Broken Hill Limited Broken Hill, N.S.W.

    This paper describes the operation involved in the sinking of a concrete-lined elliptical-shaped shaft at North Broken Hill Limited.Major factors such as geological features, future ventilation, ore h

    Jan 1, 1956

  • AUSIMM
    The Uses of Polyacrylamide Flocculating Agents at Risdon,Tasmania

    Polyacrylamide flocculating agent has been used in the Leaching Division of the Risdon Works of the Electrolytic Zinc Co. of Australasia Ltd since October, 1960. Since the introduction, the.: number o

    Jan 1, 1963

  • AUSIMM
    The Obuasi Gold Mine - A Mine Under Change

    By S C. Goel

    The Obuasi Mine in Ghana, West Africa is the largest producing gold mine in Africa, outside South Africa. The mine has changed from a mine producing from narrow vein, high grade quartz orebodies to a

    Jan 1, 2000

  • AUSIMM
    Paper No. 180. The Calculation of The Comparative Efficiencies of Crushing And Grinding Machines.

    WHEN making comparisons of the efficiencies of different grinding and crushing machines it is desirable to be able to estimate the work actually done in crushing the ore from a given size of feed to a

    Jan 1, 1909

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines (81971fc4-4a86-4ab3-9271-1e5b157046a8)

    By Yucheng H, Baogui Y, Wenyong L

    High-water rapid-solidifying material, called 'high-water material', is a new material developed by the authors over many years. The material can solidify nine times its volume of water in

    Jan 1, 1998

  • AUSIMM
    Multisource rock characterisation at microscale for a better understanding of processing characteristics

    By B Bonfils, P Lois Morales, C Evans

    One of the main challenges for current and future mining and processing methodologies is to understand the characteristics of the rock so that its behaviour in one or more parts of the mining process

    Nov 21, 2018

  • AUSIMM
    Electrowinning of Copper at High Current Densities Part II

    By Andersen AK

    A previous paper (1) indicated that electrowinning of copper at current densities considerably higher than those currently employed in electrowinning operations is technically feasible. It is of int

    Jan 1, 1969

  • AUSIMM
    Murray Basin Ilmenite ù Realising the Value

    By T J. Scanlon

    Heavy minerals recovered from recently discovered deposits in the Murray Basin are proving to be somewhat more difficult to process into saleable ilmenite products than ilmenites from existing operati

    Jan 1, 2001