Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Sep 13, 2010

  • AUSIMM
    Preprocessing of a Cyanided Gold Calcine

    By De Cuyper J

    Laboratory testwork has been performed on ancient residues from the cyanidation of a previously roasted gold-containing pyrite and arsenopyrite ore. By grinding to 95 per cent minus 60 microns, and

    Jan 1, 1993

  • AUSIMM
    The Search for Adsorbed Gold Cyanide on Carbon Surfaces

    By Miller J. D

    The mechanism of adsorption of gold from alkaline cyanide solutions by carbon has been the subject of much research over the past decade. In this paper, the nature of the gold cyanide adsorption phe

    Jan 1, 1991

  • AUSIMM
    Defining EluraÆs Lead and Silver Flotation Problems

    By Heyes GW, Orrock GI

    The fine grained complex orebody at Elura contains galena, silver and sphalerite in a matrix which is mostly pyrite; sulphides account for about 90% of the orebody. A differential flotation circuit

    Jan 1, 1988

  • AUSIMM
    Beneficiation of Iron Ore - Washing with Surface-Active Agent

    Beneficiation of Iron Ore - Washing with Surface-Active Agent The stability of the dispersed phase in 10 wt per cent slurry of iron ore slime and fines was studied at pH 5 and different concentration

    Sep 13, 2010

  • AUSIMM
    Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, Queensland

    By Ward B

    Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in

    Jan 1, 1986

  • AUSIMM
    A One-Sided View of the Development of Computer-Assisted Mapping and Modeling

    By Johnson M, Gaudin A

    With the advent of Computer aided mapping and surface modelling techniques Geologists and Engineers have had to become familiar with the capabilities and limitations of these systems to effectively

    Jan 1, 1983

  • AUSIMM
    Future Mining Engineers - Educational Development Strategy

    By D Laurence

    Significant developments in future mining systems, technology and best practices are emerging that are driven by issues relating to human resources, competitiveness, environmental and social responsib

    Jan 1, 2008

  • AUSIMM
    Plate Tectonics and the Precambrian-Phanerozoic Evolution of Australia (4c13f387-6abd-4480-92ff-9b1043445f21)

    Australian continental crust has accreted and consolidated by thirds: 1/3 during Archean time, 1/3 during Early to mid- Proterozoic time, and 1/3 during latest Precambrian to mostly Paleozoic time. Th

    Jan 1, 1995

  • AUSIMM
    Adoption of an Integrated Mine Water Management Approach Provides Environmental, Social and Economic Benefits

    By R Vleggaar

    In addressing a short-term operational need for the relocation of a tailings storage facility reclaim pond, a mine has achieved a host of water management objectives. Through effective planning and ad

    Jan 1, 2006

  • AUSIMM
    Deep Hole Directional Diamond Drilling at Mount Isa and Cobar

    By Mullens P

    Recent advances in technology have allowed many of the problems of directional control of long diamond drill holes to be overcome. Three case histories are presented, from Cobar, Hilton North and Moun

    Jan 1, 1990

  • AUSIMM
    Efficiency improvement of iron beneficiation plant by special fine particle separator

    By M Lak, R Amiri, A Haratian, M Asghari, S Haji

    Dry magnet separators are used to upgrade and beneficiate a wide variety of minerals such as hematite and magnetite materials. In recent years advances in dry magnetic separators have improved their p

    Nov 8, 2021

  • AUSIMM
    Plate Tectonics and the Precambrian-Phanerozoic Evolution of Australia

    Australian continental crust has accreted and consolidated by thirds: 1/3 during Archean time, 1/3 during Early to mid-Proterozoic time, and 1/3 during latest Precambrian to mostly Paleozoic time. The

    Jan 1, 1995

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013

  • AUSIMM
    Stratigraphy and Geochemistry of the Flynn Subgroup Volcanic Rocks

    By Morrison R. S, Doennilan N

    Recent mapping (1989-1992) by the Northern Territory Geological Survey in the Tennant Creek 1:250 000 map sheet area has resulted in substantial revision of the lithostratigraphy of the Tennant Cre

    Jan 1, 1994

  • AUSIMM
    The Influence of Resource Rent Taxation on Mining and Investment Strategies (00c54f1a-fdde-4053-a7a6-f1d4319b313e)

    By Stewart Gillies AD

    Resource rent taxes are taxes which only become effective at such a time as a pre-determined rate of return has been achieved by an operation. Resource Rent Taxes have from time to time been consider

    Jan 1, 1995

  • AUSIMM
    Understanding the Structural Controls on Arsenic Mineralisation and Ore Distribution at the Miitel Nickel Mine,Widgiemooltha, Western Australia

    By A W. Bewsher, T C. McCu, D B. Mapleson

    The Miitel nickel sulfide deposit has been overprinted by a family of late stage structures that have acted as conduits for fluids that have contaminated the orebody with arsenic minerals. This has re

    Jan 1, 2003

  • AUSIMM
    The Mining Geology and Grade Control Practices of the Batman Deposit, Mt Todd Project

    Mt Todd lies towards the south end of the Pine Creek Geosyncline, sandwiched between the Cullen Batholith and the Edith Falls Basin, in an area of regionally metamorphosed sandstones, siltstones and

    Jan 1, 1994

  • AUSIMM
    Sublevel Cave Stoping at Mount Windarra

    By Lockyer PC, Reed MR Bartlett PM

    Difficult ground conditions have plagued the underground operations at Mount Windarra since mining started in 1974.The ore at Mount Windarra consists of seven vertically dipping, sub vertically plungi

    Jan 1, 1985

  • AUSIMM
    Improving the Sustainability of Primary Metal Production - The Need for a Life Cycle Approach

    Improving the Sustainability of Primary Metal Production - The Need for a Life Cycle Approach

    Sep 13, 2010