Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    A Facies Model for an Active Composite Volcano: Ruapehu, New Zealand

    By Houghton BF

    Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian

    Jan 1, 1987

  • AUSIMM
    The Assessment and Optimization of Blasting

    Blasting is at first sight a simple operation. Blastholes are drilled in a suitable pattern, primed, charged with explosives, stemmed and finally the blastholes are connected together to give the ap

    Jan 1, 1988

  • AUSIMM
    Water ù The New Precious Resource: Planning, Management and Allocation Queensland-Style

    By G Milligan

    This paper describes how water is being planned, managed and used in Queensland as both a precious natural resource, vital for healthy ecosystems, and as a valuable tradeable commodity, necessary to s

    Jan 1, 2003

  • AUSIMM
    Rehabilitation of the Ardlethan Tin N.L. Concentrator

    The Ardlethan tin concentrator had dete riorated considerably in metallurgical per- formance, maintenance and plant availability. This problem was compounded by low tin prices and International Tin

    Jan 1, 1978

  • AUSIMM
    Dissolution of Metal Ferrites and Iron Oxides by HCI Under Oxidising and Reducing Conditions

    By Mur D. M

    Metal ferrites are formed by the high temperature reaction of various metal oxides with hematite and are commonly found in the calcines derived from the sulfation roasting of zinc, copper and nicke

    Jan 1, 1987

  • AUSIMM
    The Implementation of Bulk Emulsion Explosives at Big Bell Mine

    By J Player, K Braddon

    High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices andop

    Jan 1, 1999

  • AUSIMM
    Optical Blast Fragmentation Assessment

    By Lyman G. J, Ka

    The use of images to determine blast fragmentation is the only feasible technique when one does not want to disturb the production cycle. However, three major problems exist with the use of images.

    Jan 1, 1990

  • AUSIMM
    Improvement of Sinter Quality for the ISP

    By Kikuta K

    ISP (Imperial Smelting Process) produces zinc and lead simultaneously from zinc and lead sulphide concentrates and recovers copper and precious metals into a lead bullion. The strength of sinter is

    Jan 1, 1993

  • AUSIMM
    Palaeostress, Sesmicity and Plate Motion, Port Moresby and Adjacent Regions, Papua New Guinea

    Palaeostress analyses of the northeast-dipping Koki Fault Zone demonstrates in the hanging wall an east-west compressive stress and sinistral reverse-slip. Data from the footwall region are more un

    Jan 1, 1997

  • AUSIMM
    Parameter Adaptive Modelling of Mineral Beneficiation Processes

    Data logged on mineral beneficiation processes during normal operation are analysed using time series (correlation and spectral) methods to identify the dynamics of the processes for on-line computer

    Jan 1, 1985

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics

    The transgressive sedimentary sequence of the Notnnea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanims of shoshonitic affinities which erupted simultaneously during

    Jan 1, 1995

  • AUSIMM
    Computerised Maintenance Systems at WEIPA

    Comalco Aluminium Limited uses a computer system for cost, supply and maintenance reporting and control at its bauxite mine in Weipa, North Queensland. The system collects data on a daily basis at

    Jan 1, 1983

  • AUSIMM
    The Implementation of Bulk Emulsion Explosives at Big Bell Mine (5ba8492f-dd77-4906-9379-17f94c93e0d9)

    By J Player, K Braddon

    High productivity mining is the key to the financial success and stability of modern mines. This can be achieved through the use of new technologies, the development of innovative work practices and o

    Jan 1, 1999

  • AUSIMM
    Platinum Group Metal Analysis-An Overview

    By Price B. D, Staunton W. P

    The Mineral Science Laboratory of the Government Chemical Laboratories has recently investigated various procedures for the analysis of the platinum group metals (PGMs). This investigation covered

    Jan 1, 1987

  • AUSIMM
    Monitoring Indices for the Support and Surrounding Strata System on a Longwall Face

    By He F, Zhu D

    How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of t

    Jan 1, 1992

  • AUSIMM
    Mineralogical Aspects of the Extractive Metallurgy of Nickeliferous Laterites

    Because of the mineralogical complexity of nickeliferous laterites, most commercial and laboratory extractive processes require the ore to be blended to a feed of "constant" chemical composition. E

    Jan 1, 1978

  • AUSIMM
    Predicting the Performance of Continuous Leaching of Gold Bearing Ores

    By Corrans I. J, Yan D. S

    The CIP process for gold recovery has enjoyed widespread application in most gold-producing countries. The development of a mathematical model of the CIP process has value for use in process design,

    Jan 1, 1991

  • AUSIMM
    Recruiting for an Underground Workforce at Cannington

    By A G. L Pratt, M S. Kemp

    BHP has used many innovative techniques when recruiting its workforce for the Cannington Project. Looking for a balance of experience and enthusiasm it was necessary to develop pre-selection tests to

    Jan 1, 1998

  • AUSIMM
    Network Analysis of Pre Development Regulatory Procedures

    By Hughes DC

    Coal development in New South Wales can involve a complex series of government approvals, a requirement that results from the coincidence of many development sites with environmentally sensitive ar

    Jan 1, 1983