Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learned

    By A Castillo, K Wiese, L Panduro Robles

    For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr

    Aug 24, 2022

  • AUSIMM
    Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation

    By A Mooney, J Marsden, H Grosser, G Dunstan

    Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho

    Mar 15, 2021

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill

    By D Pateman, F de Fredrick

    The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)

    Mar 15, 2021

  • AUSIMM
    Developments of Pasminco Mining's South Concentrator

    At Pasminco Mining's South concentrator. which was commissioned in 1952. an expansion. modernisation and efficiency improvement program commenced in 1986 with a coarse ore stockpile and grinding

    Jan 1, 1991

  • AUSIMM
    Innovations in the Northbridge Tunnel, Perth - Exploiting the Aardvark Principle

    The Graham Farmer Freeway Project in Perth, Western Australia, is the largest urban infrastructure project ever carried out in the State. At a project cost of over $360 million, it also ranks as one o

    Jan 1, 1999

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    The Brukunga Pyrite Mine ù A Field Laboratory for Acid Rock Drainage Studies

    By R C. Cox

    The Brukunga pyrite mine was operated from 1955 to 1972 to supply feedstock for sulfuric acid production in the South Australian fertilizer industry. Iron sulfide ore, mined by Nairne Pyrite Ltd, was

    Jan 1, 2003

  • AUSIMM
    Embracing Modern Ecological Methods - Monitoring and Modelling for Mine Closure, not Compliance

    By A M. Lechner, S Arnold, M J. Gillespie, P D. Erskine, D R. Mulligan, A T. Fletcher, A Gordon

    Mine ecological monitoring schemes are often conducted only to address compliance and in some cases do not have the sufficient statistical power or understanding of ecological systems to assess, quant

    Jul 10, 2012

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Sublevel Caving - Today's Dependable Low-Cost 'Ore Factory'

    Much of the theory upon which the Sublevel Caving (SLC) method is based was developed in Scandinavia many years ago. It was based mainly on æbinÆ theory and æellipsoid of drawÆ configurations derived

    Jan 1, 2000

  • AUSIMM
    Iron RoadÆs Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project

    By P J. Marsh, P J. Bartsch, N J. Semler

    Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre

    Aug 12, 2013

  • AUSIMM
    Political and Social Aspects of Present and Future Tunnelling

    Our modern cities are almost incapable of sustaining themselves without subsurface infrastructure, which is not identifiable at first glance. This very soon becomes evident when the chaotic conditions

    Jan 1, 1999

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Fusion of molten phase R&D into the metallurgical industry to drive circularity

    By S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows

    The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability

    Aug 21, 2024

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • AUSIMM
    The Influence of Textural Variation and Gangue Mineralogy on Recovery of Copper by Flotation from Porphyry Ore - A Review

    By A F. Cropp, D J. Bradshaw, W R. Goodall

    Mineralogy and critically the texture of both the ore and gangue phases are of paramount importance in the flotation recovery of copper from porphyry ores. Mineralogy and texture will define the theor

    Sep 29, 2013