Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stress Corrosion Cracking of Rock Bolts

    This paper outlines the mechanism of Stress Corrosion Cracking (SCC) and how it can cause premature failure of rock bolts. SCC occurs due to the progressive development and growth of cracks in the sur

    Jan 1, 1998

  • AUSIMM
    Access and Trespass

    The purpose of this paper is to provide some practical commercial advice in relation to issues of access and trespass during exploration. It is not my intention to provide a detailed analysis of the

    Jan 1, 1995

  • AUSIMM
    Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane

    By Baxter D. A

    This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r

    Jan 1, 1993

  • AUSIMM
    Drill Hole Logs Provide the Third Dimension for Minespoil Reclamation

    The establishment of vegetation onto open cut mine spoil is dependant on the nature of the soil and rock strata of the overburden. Experience has shown that in the Bowen Basin of Central Queenslan

    Jan 1, 1987

  • AUSIMM
    Mine Waste Rock Hydrogeology ù The Effect of Surface Configuration on Internal Water Flow

    By C F. Nichol, L Smith, R D. Beckie

    A better understanding of the hydrogeology within mine waste rock and cover systems is essential for the quantification, prediction and prevention of metals loading to the environment surrounding wast

    Jan 1, 2003

  • AUSIMM
    Mineral Resource Policy Issues for Sustainable Development: Corporate and National Imperatives (e3355e4c-7484-44c3-ab2f-95b2e231f322)

    Constraints on the mineral industry are best treated as issues that have to be understood and managed in partnership rather than in conflict with communities. The Zapopan development at Mt Todd in

    Jan 1, 1995

  • AUSIMM
    The National Geochemical Survey of Australia - Aims and Strategy

    A new national-scale geochemical survey is under way inAustralia with the aim to provide energy and mineral explorers with state-of-the-art precompetitive data and information about the continentÆs po

    Jan 1, 2008

  • AUSIMM
    Preconditioning a Large Pillar at Mt Charlotte Mine

    By Lee M. F, Guilfoyle K

    A large hard rock rib pillar was recently preconditioned at Mt Charlotte mine using a novel blasting technique. The motivation for trialling this procedure was a history of past pillar failures, wit

    Jan 1, 1995

  • AUSIMM
    Experiences eith the Electric Overhead Trolley System at the CSA Mine, Cobar

    By Roberts M. L

    Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa

    Jan 1, 1988

  • AUSIMM
    Optimising the Usage of Magnetite at a Modern Coal Preparation Plant

    By Hoban M, Smith CJ

    Norwich Park Mine commenced production of export coking coal in November 1979. Attention to consumables control was limited during the early running of the plant. Once higher than anticipated magne

    Jan 1, 1978

  • AUSIMM
    The Physico-Chemical Basis of Pyrometallurgical Processes

    A critical appraisal of the wide variety of processes used in the pyrometallurgical production of metals and non-metals shows that there is a strong physico-chemical and, in particular thermodynam

    Jan 1, 1987

  • AUSIMM
    Our Threatened Coal Resources

    A major factor in the economic development of New South Wales has been the ready availability of coal for the major industrial and urban centres of Sydney, Newcastle and Wollongong. Historically, th

    Jan 1, 1995

  • AUSIMM
    Application of the SIROLOG Downhole Geophysical Tool at Callide Coalfields ù East Central Queensland

    Callide Coalfields produces a sub-bituminous, very subhydrous, low rank, steaming coal with good combustion properties, primarily for domestic power generation. Geological input into planning of coal

    Jan 1, 2000

  • AUSIMM
    Evaluation of Mineral Processing Effectiveness and Causes of Mineral Losses

    By Siwiec A

    The laboratory investigations which are necessary to evaluate the mineral processing effectiveness usually include density separation of narrow size fraction of the feed and one of the products. In

    Jan 1, 1993

  • AUSIMM
    Criteria for the Engineering and Construction by TBM of a Tunnel Under the Torre Annunziata (Italy) Built Up Area

    By Turco E, Pelizza S, Vona A

    Within the project against pollution in the Gulf of Naples (Italy) it was envisaged to build a sewage collection tunnel whose tunnelling section is about 30 m2 and whose length is over 4 km. The fo

    Jan 1, 1987

  • AUSIMM
    Dewatering Investigation at Koolan Island

    BHP Minerals Ltd operates an open cut iron ore mining operation on Koolan Island, off the coast north of Derby in the Kimberley region of Western Australia. The mine comprises a number of pits, the

    Jan 1, 1986

  • AUSIMM
    Pilot Scale Testing of Australian Coals for Nox Emmisions

    The pilot scale testing of Australian coals for their NO, emissions was carried out at the ACTC to investigate the influence of coal properties, furnace conditions and different NO,, control strate

    Jan 1, 1991

  • AUSIMM
    Gold Mineralization At Porgera, Papua New Guinea

    The Porgcra gold deposit is an epithermal gold base-metal deposit located in the Enga Province of Papua New Guinea. Gold-silver- spha le rite-galena-pyrite mineralization is related to stocks and d

    Jan 1, 1980

  • AUSIMM
    Evolution of Pillar Mining at the Pasminco Mining Broken Hill Operations Southern Operations

    Pillar mining methods at the Pasminco Mining Broken Hill Operations are not new. Since mining commenced on Pasminco's leases at the turn of the century virtually every pillar extraction method tr

    Jan 1, 1992

  • AUSIMM
    Benchmarking Estimation Methods for Coal Resource Estimation

    By G Davies, D Dunn, C Mawdesley, O Bertoli

    The coal industry in Australia has been actively working in recent years towards the (re)integration of geostatistical techniques to the process of coal resource estimation. The benefits of using geos

    Jan 1, 2009