Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Collection and Management of Ore Reserve Estimation Data

    By Lewis RW, Wilson GI

    An ore reserve estimation is only as meaningful as the quality of the data used. All required information needs to be collected in a careful and systematic manner, and be rigorously checked and ver

    Jan 1, 1987

  • AUSIMM
    Epithermal Silver-Gold Veins at Palmarejo, Guadalupe and La Patria, Chihuahua, Mexico

    By M Maslowski, J B. Gemmell, D R. Cooke, C Zesati, J Castorena

    The Palmarejo, Guadalupe and La Patria Silver-Gold epithermal vein deposits occur in south-westernChihuahua state, Mexico. The veins are hosted in a volcano-sedimentary sequence that comprises andesit

    Jan 1, 2008

  • AUSIMM
    Regional Planning for the Extraction of Mineral Resources

    By I Grant

    On the 1 June 1978, the Town and Country Planning Act 1953 was replaced by the revised and more comprehensive Town and Country Planning Act 1977. The new act brings in some substantial changes to the

    Jan 1, 1978

  • AUSIMM
    Practical Conditional Simulation for Geologists and Mining Engineers

    By Coombes J, Richards W. L

    The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi

    Jan 1, 1998

  • AUSIMM
    MAXIMINE Project Evaluation

    MAXIMINE is a compiled, comprehensive, spreadsheet-based, macro- driven software package, written to aid in the rapid and early assessment and design of virtually any small, medium, and large mining

    Jan 1, 1998

  • AUSIMM
    Postgraduate Education for Mining Company Management

    This paper looks at the development in management education for engineers at the undergraduate level with particular reference to mining engineers. The management core content of the engineering d

    Jan 1, 1986

  • AUSIMM
    Excavation of the Headrace Tunnel, King River Power Development

    By Baynes F. J, Bermingham A. G

    The 6000m long King Headrace Tunnel will be driven through hard Owen Conglomerate in the Eastern third and feldspar porphyry in the Western two thirds, with the anticipated hardness up to 350MPa un

    Jan 1, 1987

  • AUSIMM
    Mine Management - The Need for New Skills

    A case is made for broader commercial education of executive and operational managers in Australian mining companies. The competitive advantages and disadvantages of Australian miners are examined. Ar

    Jan 1, 1985

  • AUSIMM
    Site Investigation, Instrumentation and Results of a Trial Embankment on Coal Tailings

    By Morris P. H

    A trial embankment was constructed using coarse coal mine reject on a deposit of crusted coal mine tailings at New Hope Colliery, located in the Bundamba District of the West Moreton Coalfields in Sou

    Jan 1, 1990

  • AUSIMM
    Sustainable Success

    Every year my consultancy business reviews over 100 mines worldwide, primarily focusing on property and business interruption risk. What we have found is that the most successful mines have: identifi

    Jan 1, 2003

  • AUSIMM
    An Appraisal of the Preparation of Coking Coal by Heavy Medium Cyclone and flotation at Utah Development Company

    The coking coal produced by Utah Development Company in the Bowen Basin is processed by a dual system of dense media cyclones for the 30mm x 0.5mm feed and flotation for 0.5 x 0mm material. The ba

    Jan 1, 1978

  • AUSIMM
    The Use of a Decline at Mt. Windarra for Mine Access and Haulage

    A system of decline mine entries and ore haulages has been designed for the Mt. Windarra mine. This choice was controlled by the nature of the ore- bodies, the mining method chosen and the capital

    Jan 1, 1973

  • AUSIMM
    Development Of Lead Flotation Process Control At The Zinc Corporation, Limited

    By Dawes C. A, Mitchell R. A

    A process control strategy has been developed for the lead circuit of the lead- zinc concentrator at The Zinc Corporation, Limited (ZC), Broken Hill, Australia. The general aims of the control syst

    Jan 1, 1983

  • AUSIMM
    Heavy Medium Plant Design-Shortcomings and Possible Solutions

    Heavy medium separation is widely used because of the precision of separation achievable and the flexibility of control. Good design is manifest in the eventual achievement of the operational obje

    Jan 1, 1987

  • AUSIMM
    A Review of Automation at Kalgoorlie Nickel Smelter

    By Campain RA, Horner NJ, Limerick JM

    The review covers the different concepts of automation which are appropriate to non-ferrous smelting and the degree to which the smelter, and the furnace in particular, is amenable to total automation

    Jan 1, 1985

  • AUSIMM
    Multivariable Control of a Grinding Circuit

    By Newell RB

    Grinding circuits are used in most mineral processing plants. Their widespread application makes the efficient running of the circuits essential to almost all resource projects. This paper will show t

    Jan 1, 1985

  • AUSIMM
    Goonumbla: 25 Years, Four Deposits, 52 Prospects and Still Drilling...

    The Central West of New South Wales is emerging as a significant metallogenic province. The development of Northparkes Mines (North Limited) and the Cadia Hill deposit (Newcrest) are establishing N

    Jan 1, 1997

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    Coal Production Scheduling Optimisation of Single Seam Open-Cast Mining

    By E Kozan

    The paper presents new developments of the methodology of open pit coal production scheduling optimisation. They deal with the specific features of the exploitation of single coal seam and utilisation

    Jan 1, 2003

  • AUSIMM
    Pilot Reactor for Flash Smelting

    By Smith T. N, Wild M. B, Elliot B. J

    The process of flash smelting of nickel sulphide ores, as practised at the Kalgoorlie Nickel Smelter, is described. The critical variables in the operation of this process are identified. The design

    Jan 1, 1991