Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC CodeBy G M. Jeffress, D C. Arne
There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,
Jul 29, 2014
-
George Fisher Mine - Feasibility and ConstructionBy G S. B Karunatillake
Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million
Jan 1, 2000
-
SBRE framework – application to Olympic Dam depositBy D Clarke, I Minniakhmetov
This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi
May 24, 2023
-
Resource Efficient Mining Processes of TomorrowBy P Holtham, K Duffy, W Valery, A Jankovic
In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me
Nov 4, 2015
-
Mt Isa copper concentrator cleaner circuit redesignBy P Radulovic, V Lawson, M Muller, J Wallace
The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill
Sep 11, 2017
-
Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft ClayBy R Ayothiraman
Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e
Mar 8, 2011
-
Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)By D Cumming-Potvin
Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe
Mar 24, 2014
-
Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo SimulationBy D Wyborn, P A. Dowd
The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r
Sep 26, 2011
-
Why the Overall Exponent in Gy's Formula Almost Never Gets Close to 2.5Once and for all, the debate on the exponent in Gy's formula is pushed to its limit. It is explained why an exponent of 2.5, obtained when using a square root of nominal size d to adapt the value
Mar 1, 2010
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective ParametersBy M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
An investigation of potential wear occurring on refractory lining and coating formation – a remedy of wear in a basic oxygen steelmaking furnace using CFD modellingBy S Mitra, B J. Monaghan, T Honeyands, G Evans, R Chowdhury, D Scimone
Due to the harsh operating conditions, wearing of the inner refractory lining in a Basic Oxygen Steelmaking (BOS) furnace reduces the useful life of the refractories and incurs a significant cost comp
Jun 19, 2024
-
Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levelsBy H J. J Boshoff
Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a
Jul 25, 2018
-
Long hole plug – addressing the hazard of bogged rods in ‘upholes’By G Noonan, S Thomas, M Limbert
Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of
Oct 16, 2017
-
Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)By Shillabeer J
Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno
Jan 1, 1998
-
Monitoring of Erosion Risk in Surface Mining Area using a Satellite Image and Geographic Information System – A Case Study in the Indonesia Coal Mining AreaBy S Maryati
Surface mining activities disturb large areas, produce great sediment loads and tend to be a source of water pollution if they are not managed properly. Coal mining in Indonesia has a very high risk o
Nov 22, 2011
-
Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore SubstrateBy S Hapugoda, J R. Manuel, M P. Ma, L Lu
Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia
Aug 12, 2013
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Estimating Comminution Indices from Ore Mineralogy, Chemistry and Drill Core LoggingBy R Berry, J Hunt, T Kojovic
Geometallurgy aids the understanding of orebody variability through the integration of geological and processing information, thereby enabling spatial mapping of processing (eg comminution or separati
Sep 29, 2013
-
Simulation Optimisation of Mine Operational PlansBy H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh
"Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati
Nov 24, 2014
-
The Strategic Dilemma for Mineral Engineering Service Providers to the Resources Industry in the Present High Demand EnvironmentBy A J. Broome
Since 2003, there has been an unprecedented growth in the demand for engineering, technical and project services in the mineral industries. This demand for services became evident in Australia earlier
Jan 1, 2007