Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC Code

    By G M. Jeffress, D C. Arne

    There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,

    Jul 29, 2014

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    Resource Efficient Mining Processes of Tomorrow

    By P Holtham, K Duffy, W Valery, A Jankovic

    In the face of increasing energy costs, limited water resources, more stringent legislation, and lower feed grades, the mining industry is searching for more sustainable technologies and practices. Me

    Nov 4, 2015

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011

  • AUSIMM
    Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)

    By D Cumming-Potvin

    Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe

    Mar 24, 2014

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Why the Overall Exponent in Gy's Formula Almost Never Gets Close to 2.5

    Once and for all, the debate on the exponent in Gy's formula is pushed to its limit. It is explained why an exponent of 2.5, obtained when using a square root of nominal size d to adapt the value

    Mar 1, 2010

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    An investigation of potential wear occurring on refractory lining and coating formation – a remedy of wear in a basic oxygen steelmaking furnace using CFD modelling

    By S Mitra, B J. Monaghan, T Honeyands, G Evans, R Chowdhury, D Scimone

    Due to the harsh operating conditions, wearing of the inner refractory lining in a Basic Oxygen Steelmaking (BOS) furnace reduces the useful life of the refractories and incurs a significant cost comp

    Jun 19, 2024

  • AUSIMM
    Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levels

    By H J. J Boshoff

    Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a

    Jul 25, 2018

  • AUSIMM
    Long hole plug – addressing the hazard of bogged rods in ‘upholes’

    By G Noonan, S Thomas, M Limbert

    Stuck drill rods (often referred to as bogged rods) in production ‘upholes’ are a common problem in the underground mining industry. Bogged and broken off drill rods have the potential to fall out of

    Oct 16, 2017

  • AUSIMM
    Use of Paste for Tailings Disposal (b5c201be-4c25-4c8e-a498-2a2e4672d3d4)

    By Shillabeer J

    Paste backfill has been adopted by many underground mines in North America and a growing number elsewhere. Paste offers a number of advantages. This paper suggests wider applications of paste techno

    Jan 1, 1998

  • AUSIMM
    Monitoring of Erosion Risk in Surface Mining Area using a Satellite Image and Geographic Information System – A Case Study in the Indonesia Coal Mining Area

    By S Maryati

    Surface mining activities disturb large areas, produce great sediment loads and tend to be a source of water pollution if they are not managed properly. Coal mining in Indonesia has a very high risk o

    Nov 22, 2011

  • AUSIMM
    Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore Substrate

    By S Hapugoda, J R. Manuel, M P. Ma, L Lu

    Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia

    Aug 12, 2013

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Estimating Comminution Indices from Ore Mineralogy, Chemistry and Drill Core Logging

    By R Berry, J Hunt, T Kojovic

    Geometallurgy aids the understanding of orebody variability through the integration of geological and processing information, thereby enabling spatial mapping of processing (eg comminution or separati

    Sep 29, 2013

  • AUSIMM
    Simulation Optimisation of Mine Operational Plans

    By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh

    "Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati

    Nov 24, 2014

  • AUSIMM
    The Strategic Dilemma for Mineral Engineering Service Providers to the Resources Industry in the Present High Demand Environment

    By A J. Broome

    Since 2003, there has been an unprecedented growth in the demand for engineering, technical and project services in the mineral industries. This demand for services became evident in Australia earlier

    Jan 1, 2007