Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio storyBy J P. Evert
Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod
Mar 29, 2023
-
Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum FiltrationBy R Klepper
Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick
Aug 8, 2011
-
Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold ConcentratorBy A Murphy, D Lauder, J Miranda
Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro
Jan 1, 2000
-
Challenges of Developing Low-Grade Deposits in æNew WorldÆ Countries from a Mining ConsultantÆs PerspectiveBy L Lorenzen, H Muller, L Bernard
Australian companies and consultants are becoming ever more involved in projects in African, South American, East European and Middle Eastern countries. However, significant differences in culture and
Sep 26, 2013
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
Political and Social Aspects of Present and Future TunnellingOur modern cities are almost incapable of sustaining themselves without subsurface infrastructure, which is not identifiable at first glance. This very soon becomes evident when the chaotic conditions
Jan 1, 1999
-
Heat Load Estimation from Conveyor Systems in Mass MinesBy R Moreby, J Kok, L van den Berg
The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems
Aug 31, 2015
-
KEYNOTE: Back to the Future – Still on the Dark SideBy P D. Munro
"This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and
Oct 10, 2016
-
Design and Operation of Backfill for Reliable High Solids Concentration DischargeBy A G McLean
This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p
Jan 1, 1998
-
The synergistic interaction between hexanol and dithiophosphate at the air-water and galena-water interfaceBy D Pienaar, B McFadzean, C T. O’Connor
Collector and frother molecules in sulfide mineral flotation are thought to have separate roles in the flotation process, where the collector selectively hydrophobizes the mineral surface and the frot
Aug 24, 2022
-
Admixture use in cemented rock fillBy B Roache, J O’Brien, M Gray
Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing
Nov 29, 2022
-
Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra DeltaBy P Clark
This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project
Mar 8, 2011
-
30 years of seismic system design, implementation and interpretationBy J Player, G Sweby, S Webber, E Jones
Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy
Nov 29, 2022
-
Pre-Competitive Exploration Research in Australia û A 30 Year AssessmentBy May J. R
Exploration, including research, has fuelled the enormous expansion of the Australian mineral industry in the last three decades. Analysis of success and failure in exploration and research has the
Jan 1, 1992
-
Secondary Ventilation as a Value Proposition – A Case StudyBy A Golsby
Both primary and secondary ventilation is important in underground mining. Secondary ventilation refers to the provision of ventilation to development ends, stopes and services facilities, which const
Aug 31, 2015
-
Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste FormBy D J. A Van Zyl, J C. Cunning
Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the
Jan 1, 1998
-
Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing PlantBy A Mehrani, F Zamani, A Dehghani
Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s
Jan 1, 2007
-
Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to ImplementationBy B Belle
In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang
Aug 31, 2015
-
Solubility of nitrogen and inclusion characteristics in high aluminium steelsBy M M. Pande, M Ishfaq
The effect of aluminium on nitrogen solubility was investigated by equilibrating melt comprising master alloy of Fe-Al with pure electrolytic iron in a controlled atmosphere (pure argon) at 1873 K. Ni
Jun 19, 2024
-
Reducing ventilation change downtime and increasing operational uptimeBy J A. Rowland
When executing a ventilation change the mine ventilation circuit is in a state of flux throughout the entire change period with discrete mine areas both under ventilated and/or over ventilated during
Oct 12, 2022