Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Integrated Site Water Balances and Water Quality Models for Decision-making over Life-of-mine

    By R Strand, B Usher

    Environmental compliance and mine designs are increasingly including assessment of flows and water qualities as a key driver to decision-making over life-of-mine. Integrated site-wide water quality mo

    Jul 16, 2014

  • AUSIMM
    South Deep ù The Challenges

    Over years of exploration the massive and tabular orebodies in the area to the South West of Western Areas Gold Mine had been assessed as containing about 50 million ounces of gold û a world class ore

    Jan 1, 2002

  • AUSIMM
    Pyrometallurgical process simulations using CALPHAD thermodynamic databases

    By M-A Van Ende, N Kumar, I-H Jung

    In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio

    Aug 21, 2024

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011

  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • AUSIMM
    Evaluating the Inclusion of the Implementation Variability into Fragmentation Modelling

    By H Parra, D Zenteno

    Fragmentation modelling has been in use in the mining industry for a long time; however, there are still some aspects to tackle with regard to its use for strategic/planning and day-to-day purposes.On

    Aug 24, 2015

  • AUSIMM
    "Gravity Flow Under Moisture Conditions Control and Management of Drawpoint Mudflow"

    After many years of studying the rock mass gravitational flow phenomenon, it is well known that moisture conditions may change the mechanical properties of the caved and broken material, causing diffe

    Sep 26, 2011

  • AUSIMM
    Trucking, Rail or Conveyor?

    By R B. Venugopal, P Staples

    The selection of the mode of transport for moving bulk materials is never a simple task as there are various concerns/considerations applied to the selection of the most practical and cost-effective m

    Jan 1, 2005

  • AUSIMM
    Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers

    By P A. Grossman, J H. Rubinstein, M Brazil

    The installation of truck turntables at above-ground crushers has the potential to yield gains in efficiency and productivity by eliminating the need for the trucks to turn around and reverse up to th

    Nov 24, 2014

  • AUSIMM
    Correlated Valuation Methodology

    By E C. Holloway

    "The financial valuation of mining assets has a number of fundamental differences to the valuation of many other asset groupings. One such difference is that typically, the greater proportion of both

    Mar 8, 2016

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    A Statistical Approach for Deriving Project Design Rainfall

    By R Millar

    A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically

    Nov 26, 2013

  • AUSIMM
    Dynamic Simulation as a Test Bed for Emerging Technologies

    The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro

    Sep 26, 2011

  • AUSIMM
    Tech Services - It's a Blast

    Two years ago I was sitting in a big lecture theatre at the School of Mines in Kalgoorlie at the annual New LeadersÆ Conference listening to a guy tell us all how much he loved his job, travelling the

    Jan 1, 2008

  • AUSIMM
    Syama Gold Mine – the Journey towards a Class-leading Gold Mine

    By R Sinclair, D Landwehr, I Hunter

    "The Syama Gold Mine, located in southern Mali, was established in 1990 by Broken Hill Propriety Limited (BHP). The operation began treating oxide, and in 1994 it transitioned to processing hard and r

    Oct 10, 2016

  • AUSIMM
    Towards an understanding of production costs at Australia’s underground gold mines

    By A Trench, S Ulrich, S Hagemann

    A synthesis of reported All-In Sustaining Costs (AISC) for 57 Australian gold mines in the period 2014–2016 reveals for the first time the clear influence of grade upon cost performance, most evident

    Oct 16, 2017

  • AUSIMM
    Coal Bursts in the Deep Longwall Mines of the United States

    By C Mark

    Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are a particular hazard because they typically occur without warning. During the past two years, three US

    Nov 5, 2014

  • AUSIMM
    Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper Operations

    By D Kent, J Bullock, M Wilkinson

    Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su

    Oct 16, 2017

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002