Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and ExecutionBy N Elith
The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st
Nov 8, 2011
-
Designing User Interfaces for the Mines of the Future – User Centred ApproachBy E Widzyk-Capehart
The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed
Nov 22, 2011
-
Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 StorageBy A Hamanaka
EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be
Nov 22, 2011
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
An Occupational Health and Safety Perspective on the Water Systems in MiningBy J Field
Many aspects of water use in mining are driven by the technical requirements for water. There has been little consideration given to both the safety and the health requirements. Workers in the mining
Jan 1, 2006
-
Laboratory Corrosion Tests of Frictional Rock BoltsBy D W. Airey
Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup
Nov 5, 2014
-
Flotation control using froth stability: past, present and futureBy C Smith, J Cilliers, K Hadler
Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be
Aug 29, 2018
-
Improving the Recovery of Coarse Coal Particles in a Jameson CellBy G J. Harbort, Z Pokra
It has been observed in several Jameson cell installations where the source for flotation feed is deslime screens, that the recovery of coal particles greater than 0.5 m is not as great as that of fin
Jan 1, 2005
-
Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic ApproachBy J S. Kuszmaul, T O. Aspinall
The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin
Jan 1, 1998
-
Design and Operation of Backfill Silos for Reliable High Solids Concentration DischargeThis paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri
Jan 1, 1998
-
Pipeline ManagementBy A G. L Pratt, J R. Grant
Mining companies face the ongoing challenge of sustaining and growing production. This paper outlines business investment concepts to grow reliable returns on investment from a portfolio of choices by
Jan 1, 2006
-
Characterisation of Large Size Flotation CellsBy F H. Henrfquez, A G. Oroz
Design and operating conditions of large size mechanical flotation cells were evaluated by comparing them with actual operating conditions in a plant. The objective was to determine the time scale-up
Jan 1, 2005
-
Orepass Monitoring and Management at Olympic Dam MineBy J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
Underground Stope Drill and Blast Designs Optimisation ProgramBy C Preston, T Williams, D Roy
The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde
Aug 24, 2015
-
Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, WashingtonBy L Galisson, E Audigé, D Sowers
Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington
Sep 17, 2014
-
Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold ArmeniaBy D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane
The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The
Aug 29, 2018
-
Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant PerformanceBy P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall
Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con
Sep 1, 2014
-
Mining Education ù Driven by Global ImpactsBy P J. McCarthy
Globalisation and consolidation is resulting in the mining industry coming to be dominated by a small number of very large companies seeking to lever assets and knowledge to create wealth. As an impor
Jan 1, 2001
-
Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to ClosureBy J McCluskey, N Barros
"Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c
Nov 24, 2014
-
Isasmelt - A 250 000 TPA Copper Smelting FurnaceMIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ
Jan 1, 1998