Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Designing User Interfaces for the Mines of the Future – User Centred Approach

    By E Widzyk-Capehart

    The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed

    Nov 22, 2011

  • AUSIMM
    Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 Storage

    By A Hamanaka

    EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be

    Nov 22, 2011

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    An Occupational Health and Safety Perspective on the Water Systems in Mining

    By J Field

    Many aspects of water use in mining are driven by the technical requirements for water. There has been little consideration given to both the safety and the health requirements. Workers in the mining

    Jan 1, 2006

  • AUSIMM
    Laboratory Corrosion Tests of Frictional Rock Bolts

    By D W. Airey

    Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup

    Nov 5, 2014

  • AUSIMM
    Flotation control using froth stability: past, present and future

    By C Smith, J Cilliers, K Hadler

    Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be

    Aug 29, 2018

  • AUSIMM
    Improving the Recovery of Coarse Coal Particles in a Jameson Cell

    By G J. Harbort, Z Pokra

    It has been observed in several Jameson cell installations where the source for flotation feed is deslime screens, that the recovery of coal particles greater than 0.5 m is not as great as that of fin

    Jan 1, 2005

  • AUSIMM
    Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic Approach

    By J S. Kuszmaul, T O. Aspinall

    The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin

    Jan 1, 1998

  • AUSIMM
    Design and Operation of Backfill Silos for Reliable High Solids Concentration Discharge

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri

    Jan 1, 1998

  • AUSIMM
    Pipeline Management

    By A G. L Pratt, J R. Grant

    Mining companies face the ongoing challenge of sustaining and growing production. This paper outlines business investment concepts to grow reliable returns on investment from a portfolio of choices by

    Jan 1, 2006

  • AUSIMM
    Characterisation of Large Size Flotation Cells

    By F H. Henrfquez, A G. Oroz

    Design and operating conditions of large size mechanical flotation cells were evaluated by comparing them with actual operating conditions in a plant. The objective was to determine the time scale-up

    Jan 1, 2005

  • AUSIMM
    Orepass Monitoring and Management at Olympic Dam Mine

    By J Rose, D O’Toole, D Grant

    Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed

    May 9, 2016

  • AUSIMM
    Underground Stope Drill and Blast Designs Optimisation Program

    By C Preston, T Williams, D Roy

    The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde

    Aug 24, 2015

  • AUSIMM
    Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, Washington

    By L Galisson, E Audigé, D Sowers

    Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington

    Sep 17, 2014

  • AUSIMM
    Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold Armenia

    By D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane

    The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The

    Aug 29, 2018

  • AUSIMM
    Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant Performance

    By P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall

    Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con

    Sep 1, 2014

  • AUSIMM
    Mining Education ù Driven by Global Impacts

    By P J. McCarthy

    Globalisation and consolidation is resulting in the mining industry coming to be dominated by a small number of very large companies seeking to lever assets and knowledge to create wealth. As an impor

    Jan 1, 2001

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Isasmelt - A 250 000 TPA Copper Smelting Furnace

    MIM Holdings Limited (MIM) committed to a long-term future in copper in the Carpentaria Mineral Province in 1996 with the development of the Enterprise and Ernest Henry mines, and an upgrade of MIMsÆ

    Jan 1, 1998