    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • AUSIMM
    Some Experiments on Water Jet Cutting and Consideration of Its Use as a Drilling Tool in Rocks

    An account is given of experimental apparatus for generating a short duration high velocity water jet and the effect of its impingement on various rock samples under air or water cover. The penetratio

    Jan 1, 1969

  • AUSIMM
    Effect of solid-solved FeO and MnO on hydration of free MgO in steelmaking slag

    By N Kado, T Iwama, R Inoue, S Ueda

    Steelmaking slags are usually used as roadbed and civil engineering materials. However, the expansion phenomenon, which is caused by the volume expansion during hydration of free CaO and free MgO cont

    Jun 19, 2024

  • AUSIMM
    Drilling Techniques for Resource Estimation of Mineral Sand Deposits

    By M Z. Abzalov

    Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso

    Oct 5, 2011

  • AUSIMM
    Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to Implementation

    By B Belle

    In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang

    Aug 31, 2015

  • AUSIMM
    Uncertainty in Soil Sampling ù A Case Study

    By K Luthbom, A Lagerkvist

    According to the Swedish Environmental Protection Agency, the number of potentially contaminated sites in Sweden is approximately 40 000. The funding for remediation from the Swedish Government alone

    Jan 1, 2005

  • AUSIMM
    The Integration of a Due Diligence Process into a Mining Operation

    A mining operation can be identified as demonstrating prudent management when a number of vital characteristics are evident.All risks and opportunities that are critical to the on-going success of the

    Jan 1, 1998

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Investing in new process improvement technology: reducing the risk of implementation – a way forward

    By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig

    Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change

    Aug 29, 2018

  • AUSIMM
    Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, Australia

    By Z U Bajwah

    During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent

    Jan 1, 1994

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    Is your mine closure a sustainability failure? Transform your asset and create a self supporting neighbouring community. It’s as easy as ABCD!

    By K Cochrane

    Time and time again history shows us that mine closures are sustainability failures. Mine operators do not know how to turn the mine closure into an asset and communities around the mine do not know h

    Jul 25, 2018

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    Team Alignment Towards Alternative Project Delivery Methods

    Project delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en

    Jan 1, 2009

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • AUSIMM
    The Canadian Experience ù Disclosure Standards for Mineral Projects

    After considerable input from the mining industry, the Canadian Securities Administrators (CSA) finalised National Instrument 43-101: Standards of Disclosure for Mineral Projects. This Instrument, whi

    Jan 1, 2002

  • AUSIMM
    Natural Capital Accounting – a Sea Floor Mining Application

    By R Grogan

    Nautilus Minerals Inc is a sea floor resource exploration and development company focused on developing the Solwara 1 Project, a copper-gold sea floor massive sulfide deposit in the territorial waters

    Jun 28, 2016

  • AUSIMM
    Estimating Mineralogy in Bulk Samples

    By R Berry

    This paper looks at two ways to estimate the bulk mineralogy of the rocks for assay intervals. The aim is to find an efficient indicator of the most common minerals in the rock. Phase (modal) analysis

    Sep 5, 2011

  • AUSIMM
    Repurposing flotation capacity at Mt Keith nickel concentrator

    By L Hussey

    Mt Keith concentrator treats low grade disseminated nickel sulfide ore supplied from the adjoining open pit mine. It is a traditional crushing, two-staged closed circuit grinding circuit (SAG & Ba

    Sep 11, 2017