Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fly-In, Fly-Out Operations ù Strategies for Managing Employee Well-BeingBy J Sibbel, K Goh
A key issue facing mine managers in remote locations in Australia and overseas is that of managing a fly-in, fly-out (FIFO) workforce. Current Australian research (Sibbel, in prep) indicates that FIFO
Jan 1, 2006
-
The Design of Continuous Thickeners for Flocculated MaterialsBy Goldney L. H
The authors review the literature and discuss the application of methods to the design of thickeners for ilocculated metallurgical pulps. The use and evaluation of flocculents is described. Experiment
Jan 1, 1959
-
Leaching of sulphated calcineFluid bed sulphation roasting followed by leaching at low pH was developed as a means of separating copper and bismuth from a mix- ture of flotation concentrates and flash fur- nace flue dust. A 65
Jan 1, 1986
-
Process Control Developments at Queensland AluminaThe completion of the 3rd expansion at Queensland Alumina added 725,000 t.p.y. capacity to what was already the world's largest alumina refinery. Rated design capacity is now 2.0 million t.p.
Jan 1, 1974
-
Evaluation of a Dragline-Hopper-Truck Mining SystemBy Dickerson A. W
The most important mining problem facing many of the established surface coal mines in the Bowen Basin area of Queensland is the rising cost of overburden stripping associated with increasing depths t
Jan 1, 1992
-
Financial Rewards for Innovators and Risk-TakersBy Warren M
Many Australian tunnelling and mining companies regularly investigate different methods or equipment in an attempt to keep ahead of their competition. Sometimes the result is a new approach or process
Jan 1, 1993
-
Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource EstimateBy C Switzer, R Logan, S Konopa, P Stoker, R Lewis
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G
Mar 18, 2015
-
Phase equilibrium study in the sodium metasilicate primary phase field of PbO-Na2O-SiO2 system between 800 and 1000°CBy X Ling, M Barati, E Moosavi-Khoonsari
In the pyrometallurgical process of secondary lead recycling, a desulfurising agent, such as Na2CO3 is added to minimise the emissions of sulfur into the atmosphere, while silica is introduced into th
Jun 19, 2024
-
Improved Jarosite ProcessBy BTrubT M
In the roast-leach-electrolysis process for the production of zinc, iron contained in zinc concentrates is converted to zinc ferrite during roasting. At Canadian Electrolytic Zinc (CEZinc), the Outo
Jan 1, 1993
-
Removal and Recovery of Thallium from Impure LeadBy Milner E. F
Thallium is largely volatilized during sintering in the conventional sinter/blast furnace production of lead. The new direct oxygen smelting processes will force the thallium into the bullion, nece
Jan 1, 1989
-
Critical state soil mechanics in filtered TSF designBy J Rola
This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro
Jul 1, 2021
-
Platinum Potential of the Pacific Rim of Ural-Alaskan-type IntrusionsBy G Ryan, Yu Nazimova
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. This paper aims to highlight the global exploration opportunities that exist in connection
Mar 18, 2015
-
The Importance of Evaluating Grinding PerformanceBy R L. Koenig
Previous papers at Metplant conferences have covered the options for crushing and grinding circuit selection. High Pressure Grinding Rolls (HPGR) may have considerable advantages over autogenous mill
Aug 8, 2011
-
Formation of fracture zones under static and impact loading conditions and their characteristicsBy S Kodate, Ö Aydan, Y Suda, J Tomiyama
Fracture zones are commonly found in the Earth’s crust. These zones may cause very severe engineering problems. Therefore, the formation and the assessment of the mechanical characteristics of these z
Nov 29, 2022
-
Aboriginal Liaison and Cross-Cultural Matters: The Role of the Northern Territory Department of Mines and EnergyBy K Whelan
The Land Access Branch of the Mines Division of the Northern Territory Department of Mines and Energy is responsible for Aboriginal Liaison and cross-cultural matters that affect the Department. In
Jan 1, 1994
-
Chamfered backs to improve open stope stability in poor ground conditionsBy G Capes
A novel open stope design approach is presented that delivered improved performance in a mining area with poor ground conditions at the Olympic Dam mine. During 2019, a large open stope had an unplann
Mar 29, 2023
-
Back analysis of pit slope performance in a saturated alluvial sedimentBy J Player, G Sweby
The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined
Jun 22, 2022
-
Optimising Underground Mining StrategiesBy A M. Ebbels
"Underground mine scheduling decision-making has been based on production requirements, equipment productivities and the mine planner’s instincts on the best scheduling strategy for the mine to optimi
Mar 8, 2016
-
Regular Measurement Defines Upgrades on Scrubber ScreensBy R Wilson, S Luke, R Williams, B Freeburn
"In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e
Oct 10, 2016
-
An analysis of productivity in sublevel caving minesBy G R. Power
A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b
Mar 15, 2021