Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A review of the GAG as an effective firefighting tool

    By D Chalmers

    After the sustained use of the GAG (Górniczy Agregat Gaśniczy) engine at a Queensland coalmine, it has raised questions as to its effectiveness as a remote firefighting tool. All firefighting apparatu

    Oct 12, 2022

  • AUSIMM
    Effects of anglesite on the flotation of sphalerite in complex sulfide ores and a method to suppress sphalerite floatability

    By S Jeon, K Aikawa, M Ito, A Kusano, I Park, N Hiroyoshi

    In mineral processing of complex sulfide ores containing copper (Cu), lead (Pb), and zinc (Zn), flotation has been commonly used. Typical Pb mineral in the ores is galena (PbS), while some types of th

    Aug 24, 2022

  • AUSIMM
    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    An Integrated Geology-Mine-Plant and Eco-Efficiency Simulator for Anglo Platinum's Evaluation and Operational Improvement Initiatives

    Sep 13, 2010

  • AUSIMM
    Exploring the applicability of responsible research and innovation for mine transitions

    By S Worden, A Lee Zhi Yi, E Sellers, G Corder, A Littleboy

    The global shift towards decarbonisation is driving competition for the extraction of critical minerals such as nickel, lithium, and copper. To meet this demand, new mines are being developed while mi

    Aug 2, 2023

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    The underdog mechanical alternative for tailings dewatering: the screw press

    By S Whitton, W Wimmler, L Wimmler

    “Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very

    Jul 1, 2021

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    Incorporating Sustainability into Mining Plant and Infrastructure Design

    By A Murphy

    Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They

    Jul 16, 2014

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    Mining What's in it for New Zealand?

    By B M. H Sharp, R P. Hide, S P. Devine

    Uncertainty and debate currently pervade the mining industry in New Zealand. The operational uncertainties, whether external (eg gold prices, the exchange rate), or internal (eg coal expansion difficu

    Jan 1, 1985

  • AUSIMM
    Ore Selection Optimisation for an Iron Ore Deposit Using Linear Programming

    By M Aros, L Reilly

    Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal

    Nov 24, 2014

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Identifying and Dealing with Outliers in Resource Estimation

    By C De-Vitry

    In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data

    Aug 18, 2014

  • AUSIMM
    An Overview of Geotechnical Issues in Narrow Vein Mining

    By M P. Sandy, J B. Albrecht

    "Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or

    Mar 26, 2012

  • AUSIMM
    Environmentally and Publicly Acceptable Options for Remediation at Tui Mine Site, Te Aroha

    By J Webster-Brown

    The Tui Mine is an abandoned Pb-Zn mine giving rise to water quality problems in the Te Aroha region of Coromandel, New Zealand. When sampled in September 2002, for example, both the Tui and Tunakohoi

    Jan 1, 2003

  • AUSIMM
    Mineralogy of the Green Leader Gold Ore at Kalgoorlie, Western Australia

    Concentrations of bright green material in the "Golden Mile" of Kalgoorlie, which carry particularly high gold values, are known locally as "green leader".This assemblage consists

    Jan 1, 1977

  • AUSIMM
    The History of Ore Reserve Classification and Reporting in Australia

    By Glasson K. R

    The history of Ore Reserve classification and reporting in Australia is largely a history of the Australian mining industry itself. In the late 1800s, when the industry was dominated by small scale,

    Jan 1, 1992

  • AUSIMM
    Lesson Learned From the Start-Up and Operation of the World's Newest and Largest ISL Uranium Mine

    The Beverley uranium mine û now in production in the remote north of South Australia at1000 tonnes per annum û was established to meet a projected, but little-recognised shortfallin primary supply of

    Jan 1, 2002

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • AUSIMM
    Challenges in Maximising the Value from Epithermal Gold Deposits

    By P Allen, E Gleeson, D Boakye, R Chesher, S Konopa

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Not only do epithermal gold deposits provide many challenges in estimating mineral resource

    Mar 18, 2015