Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic DamBy J Taylor, M Smith, A Tunnadine, D Nikolakopoulos
As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground
Mar 22, 2022
-
Bulk Mining Explosives ù Technical Tool or Commercial Commodity?By G Le Juge, K Waldock
The current suite of bulk mining explosives has been available to the industry for over 20 years. The flexibility and performance of ammonium nitrate based emulsion blend explosives were accepted by t
Jan 1, 2004
-
Stakeholder Engagement and Social Sustainability in the Mining SectorBy H Tran
Local communities are undertaking an increased role in mine project decision making processes, associated with growing pressure and expectations from regulators, financiers and the general public. Thi
Jan 1, 2009
-
A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate PerspectiveBy A E. A Northcote
The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou
Mar 21, 2011
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014
-
Theoretical Analysis of Blast Furance Operation Based on the Gas Flow Through Layered Ore and Coke BurdensBy Muchi I
To clarify the characteristics of non-uniform flow of gas through layered burdens of ore and coke, flow equations of continuity and motion were solved numerically taking account of the geometrical ef
Jan 1, 1975
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Tunnel Procurement Process ù Management Issues and Risk Mitigation ù æGetting it Right from the Beginning - Policy, Management, Procurement, Risk Evaluation and Decision Methodologies for Optimal ResultsÆBy T Isaksson, J Anderson
The procurement process for underground construction contracts, in particular those contacts involving tunnel boring machines (TBMs), is subject to many complex and inter-related variables, including
Jan 1, 1999
-
Trucking, Rail or Conveyor?By R B. Venugopal, P Staples
The selection of the mode of transport for moving bulk materials is never a simple task as there are various concerns/considerations applied to the selection of the most practical and cost-effective m
Jan 1, 2005
-
Methodology development of electrical conductivity measurements for non-ferrous slagsBy L Scheunis, A Van den Bulck, E Jak, K Verbeken, M Shevchenko, R Starykh, I Bellemans, P-J Boeykens
As a result of the globally increasing consumer use of electronic devices, it is expected that pressure will increase on the supply chain of precious metals. Hence, recycling of these electronics beco
Jun 19, 2024
-
Social licence to operate – circular economyBy L Schürmann, R Kendall
Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e
Jun 22, 2022
-
Critical risks unveiled – the imperative of broad-brush risk assessmentsBy C Young
In the vast expanse of Western Australia’s mining sector, a critical issue has come to light: many mining operations overlook the power of a Broad-Brush Risk Assessment (BBRA) to uncover their critica
Apr 16, 2024
-
A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation CircuitBy D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott
"Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or
Oct 10, 2016
-
The relationship between mineralogy and shear strength of Pilbara Hamersley Group shales across the weathering spectrumBy A Maldonado, A Robert, K G. Mercer
The Hamersley Group in the Pilbara, Western Australia, consist of interlayered banded iron formation (BIF) and shale host rock formations within which a large number of open pit iron ore mines have be
Jul 24, 2017
-
The Geomet Curve – A Model for Implementation of GeometallurgyBy J Vann
Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo
Sep 5, 2011
-
Practical Considerations and Shortcuts in SamplingBy D M. Frantois-Bongarton
"A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem
Aug 21, 2012
-
Concept and Operation of the New Conventional Cell House of Asturiana de Zinc at San Juan de Nieva, SpainBy LefTvre Y
In May 1991, AZSA commissioned a new conventional Cell House. This paper focuses on the major improvements introduced in the design and the construction of the equipment, machinery and control. An e
Jan 1, 1993
-
Practical Statistical Tools for ManagersThe correct design and effective operating strategies of metallurgical plants require a constant analysis of data gathered for process control, or for due accountability. Conventional, oldfashion stat
Jan 1, 2002
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Extractive Industry - Sustainability Information SystemsAs the title indicates the central themes discussed in this contribution are sustainable development, information systems, and extractive industry. More specifically, the objective is to present a pro
Jan 1, 2009