Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ranges of Validity of Some Distribution Functions for Blast-fragmented Rock

    By J A. Sanchidrián

    The general ranges of validity of some distribution functions are assessed from their behaviour with 119 sets of fragmentation data from bench blasting obtained by sieving. The emphasis is on determin

    Aug 24, 2015

  • AUSIMM
    Effective Contracting Through Partnering

    By Stewart R. D, Lawrence W, Youl M. J

    The trend towards contracting by major coal mining companies such as BHP Coal and MIM Ltd is examined. Reasons why this trend is occurring are discussed and the concept of partnering is examined.

    Jan 1, 1997

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018

  • AUSIMM
    Ventilation Surveys and Model Building - A ConsultantÆs Opinion

    By J Rowland

    "This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough

    Jun 1, 2012

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Optimal Block Estimation by Kriging

    A comparison is made between elementary block estimation techniques and the optimal methods of geostatistics using data from an Australian deposit. Considerable improvement in the estimates are obtain

    Jan 1, 1975

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°C

    By E Jak, G Khartcyzov, M Shevchenko

    The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco

    Jun 19, 2024

  • AUSIMM
    The Technical Library at Risdon

    Some form of technical library is a necessity for every metallurgical plant, but its form and scope will vary with the conditions of each case. In its simplest form, it may consist of one or two minin

    Jan 1, 1934

  • AUSIMM
    Sources of Alluvial Gold, Nokomai Catchment, Northern Southland

    By P Wopereis

    The Nokomai valley is located within the pumpellyite/actinolite facies of the Otago Schist, a regional scale metamorphic belt in Southern New Zealand. The Otago Schist is dominated by psammitic and pe

    Jan 1, 1996

  • AUSIMM
    Control of Mineral Sands Dry Plant

    By D Gelling

    Mineral sands dry plants consist of a large number of repetitive unit operations with significant transport delays, in the form of stream pipes, conveyors and elevators. As part of the P255 mineral sa

    Jan 1, 2001

  • AUSIMM
    Sustainable Phytostabilisation of MineTailings - A Critical Analysis of System Requirements and Approaches

    By T Baumgartl, M Edraki, L Huang, D R. Mulligan

    "Phytostabilisation with tolerant plant species has been advocated as a cost-effective solution for sustainable cover of tailings from metal mines and bauxite refinery. The development of sustainable

    Jul 10, 2012

  • AUSIMM
    The Influence of the Composite State of Graphite and Metallic Chlorine Compounds on the Formation of PCDD/Fs

    By E Kasai, T Nakamura, E Shibata

    In the present study, formation of PCDD/Fs from carbon particles like æsootÆ, so called de novo synthesis, was experimentally simulated using the powder mixture of graphite and metallic chloride. Comp

    Jan 1, 2002

  • AUSIMM
    The Round Hill Gold-Scheelite Deposit, Macraes Flat, Otago, New Zealand

    The Round Hill gold-scheelite deposit is located three kilometres from Macraes Flat and approximately 60 kilometres due north of Dunedin, New Zealand. A mining feasibility study is currently being und

    Jan 1, 1987

  • AUSIMM
    The Aluminium Smelter at Tiwai Point

    My speech this morning is not a technical one, rather I will aim to tell you about the New Zealand Aluminium Smelters Limited and how I see it fitting into the Western World aluminium scene.

    Jan 1, 1983

  • AUSIMM
    Geotechnical Investigations for Urban Road Tunnels in Sydney

    By Hosking IA, Mirkov P

    Among the solutions currently being considered for improving traffic flow in Sydney are the construction of major road tunnels, principally the Eastern Distributor Tunnels, leading from the end of

    Jan 1, 1987

  • AUSIMM
    Mixed Culture Bacterial Leaching of Manganese Dioxide

    Thirty mixed cultures of microorganisms from soil, water and mineral samples from the Groote Eylandt Mining Company mine site were approximately three times more effective in biodegrading manganese di

    Jan 1, 1983

  • AUSIMM
    Environmental Costs (and benefits) of Planning and Developing Mines and Quarries

    The consideration of environmental constraints and issues is a fundamental component of all stages of planning, development, operation and decommissioning mining and quarrying projects. Provision n

    Jan 1, 1990

  • AUSIMM
    Some Rb-Sr Measurements on Granites Near Mount Isa

    Rb-Sr measurements on total-rock samples of granitic rocks from the Mount Isa region have confirmed the existence of two periods of granite-forming activity. The Kalkadoon Granite, together with the E

    Jan 1, 1966

  • AUSIMM
    SAG Mill Grinding Design Versus Geometallurgy - Getting it Right for Competent Ores

    SAG Mill Grinding Design Versus Geometallurgy - Getting it Right for Competent Ores Smarter processing for the future, in the area of SAG mill design involves accurate grinding test data, completing

    Sep 13, 2010