Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stabilising and filling the Beaconsfield Hart Shaft

    By A Turner, P Hills, D Johnson

    Underground mining for gold began in Beaconsfield in 1877 and development of the Tasmania Mine saw the sinking of multiple shafts, including the Hart Shaft over the ensuing 35 years. The mine closed i

    Nov 30, 2018

  • AUSIMM
    Generation, Transport and Control of Dust in Frozen, Underground Placer Mines in the Arctic

    By S Bandopadhyay

    The seasonal fluctuations of the dust content in Arctic mine environments and the environmental variables affecting the intensity of dust production are qualitatively well known, but quantitative mode

    Jan 1, 2005

  • AUSIMM
    Martabe Gold Mine, Indonesia: a positive solution for positive reconciliation

    By M Angus, S Konopa, A Virisheff, S Crispin

    A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther

    Nov 21, 2018

  • AUSIMM
    The ABC of Mine to Mill and Metal Price Cycles

    By J Pease, P Cameron, D Drinkwater

    "In the 1990s metal prices were trending in a long-term decline and the usual cost-cutting exercises were adopted. Cuts to research and development made innovation difficult and the outlook was grim.

    Oct 10, 2016

  • AUSIMM
    Titanium Dioxide Manufacture

    Titanium dioxide (TiG ) is produced 2 commercially by two methods generally referred to as the "sulfate" route and the "chloride" route. The SCM Corporation, in supplying 15% of the world's dem

    Jan 1, 1986

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Thernodynamic Properties and Phase Diagram of the Copper-Lead BinaryAlloy System

    ABSTRACTFor the binary system copper-lead two relationsEquation 1andEquation 2have been derived for the activities of copper and lead at compositions and absolute temperatures within the liquid region

    Jan 1, 1971

  • AUSIMM
    Critical risk management, good, but not good enough

    By D L. Head

    Critical risk management (CRM) has become one of the latest safety buzz terms in mining. Everyone seems to be doing it, everyone seems to know about it, yet we are still having fatalities in our indus

    May 5, 2022

  • AUSIMM
    Assessment of Environmental Quality Impacts Caused by Red Mud Storage Facilities in China

    By S Zheng, Y Zhang, Z Wen, S Ma

    Red mud (RM) is a solid waste product generated during alumina refinery process, and is usually stored in SFs (SFs) because it canÆt be disposed of easily. In this paper, environment degradation cause

    Jul 10, 2012

  • AUSIMM
    The Pre-Feasibility Study – Big Choices, Little Time

    By D J. Logan, J Jackson

    "As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin

    Mar 8, 2016

  • AUSIMM
    Improved forged grinding media performance with carbon content greater than 1.0%

    By R Bose, M Bovell, G Cheong

    Grinding media is a major consumable in mineral processing and therefore decreasing costs associated with its consumption is regularly considered a key goal for the minerals processing industry. Grind

    Aug 29, 2018

  • AUSIMM
    A Solution to Grade Estimation in a High Nugget Environment ù The Bendigo Experience

    In a ætypicalÆ gold deposit each tonne of ore will contain tens of millions of very fine gold particles, whereas; at Bendigo the majority of gold in each tonne of ore is present in just five to 15 ver

    Jan 1, 2004

  • AUSIMM
    Improving crusher throughput using a problematic ore index based on simple, first principles geology

    By T Walton, C Perring, M Pepper, G Gerber

    The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st

    Mar 22, 2022

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012

  • AUSIMM
    Developing a best practice framework for inrush risk management

    By L Manca, P B. Hills, D Tyler, N Pollington

    This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in

    Mar 15, 2021

  • AUSIMM
    Geometallurgical Characterisation of a Tailings Storage Facility – A Novel Approach

    By T Napier-Munn, E Louwrens, L Keeney

    Geometallurgical characterisation of ore deposits is accepted practice in some parts of the mining industry today. Its primary aim is to provide constrained inputs that reflect inherent geological var

    Jul 27, 2015

  • AUSIMM
    How a frontline planning and commitment system improves trust, commitment and results in operations

    By G Britton, P Moynagh

    As more than a few mines gradually sink under the weight of emails, whiteboards, notice boards and ever more complex spreadsheets, the holy grail of effective short-term interval planning and control

    Oct 16, 2017

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Risk Assessment in Mine Rehabilitation Planning: Using the Option of an Above Ground Tailings Containment at Ranger Uranium Mine as an Example

    By Riley S. J

    Ranger Uranium Mine is located within the Alligator Rivers Region of the Northern Territory of Australia and surrounded by the World Heritage listed Kakadu National Park (Figure 1). The mining oper

    Jan 1, 1994