Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Plant rejects disposal strategies applied at Caval Ridge open cut coal mine

    By J Li, H Hooi, D Payne

    Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act

    Jul 23, 2018

  • AUSIMM
    Community Health Considerations from Mining Executives and Managers in Western Canada

    By M Scoble, A Ostry, J Shandro

    Mining companies are not ill-informed on the topic of community health. There have been a number of research studies that have illuminated community health issues associated with mining, especially in

    Nov 20, 2012

  • AUSIMM
    Resue Mining with eDev™ Electronic Detonators at Stawell Gold Mines

    By C Hamilton

    Stawell Gold Mines (SGM) is an underground mining operation located in Victoria, Australia. The mining method employed is long hole retreat stoping, utilising up and downholes and artificial concrete

    Mar 21, 2011

  • AUSIMM
    The Influence of Charge Distribution on the Grindability of the Blasted Material

    By J Seccatore, G Sadao, M Cardu, G De Tomi, L Finoti, F Galvão, J Romero Huerta, A Rezende, J Bettencourt

    In the mining industry, rock blasting can be considered as the first phase of comminution. The downstream phases of comminution are mechanical, and consist in consecutive stages of crushing and millin

    Aug 24, 2015

  • AUSIMM
    Development of State-of-the-art Connection Types for Pipe Umbrella Support Systems

    By G M. Volkmann

    Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l

    Sep 17, 2014

  • AUSIMM
    Construction of the Seven Thousand Tonne per Day – Big Gossan Production Shaft

    By N Herault

    PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro

    Mar 21, 2011

  • AUSIMM
    Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising Value

    By G M. Taylor

    The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past

    Sep 17, 2014

  • AUSIMM
    Development of a Predictive Geometallurgical Recovery Model for the La Colosa, Porphyry Gold Deposit, Colombia

    By S Leichliter

    La Colosa, Colombia is a large gold-porphyry deposit currently undergoing feasibility studies by AngloGold Ashanti. This period of development allows the opportunity to apply innovative and emerging t

    Sep 5, 2011

  • AUSIMM
    Manufacturing of FeSiB high-temperature phase change material by silicothermic reduction

    By W Polkowski, M Tangstad, M Wallin, J Jiao

    Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr

    Jun 19, 2024

  • AUSIMM
    The Inter-dependence of Mining and Mineral Beneficiation Processes on the Performance of Mining Projects

    By McKee D. J

    Much research is aimed at providing a revolutionary advance in technology that has the potential to render current mining and beneficiation problems obsolete. Such revolutionary advancements have b

    Jan 1, 1994

  • AUSIMM
    Process Development for the Marampa Iron Ore Tailings Project, Sierra Leone

    By P Dunn

    Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi

    Jul 11, 2011

  • AUSIMM
    Flotation launder design and the measurement of critical froth transport parameters

    By B Wong, R G. Coleman

    In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const

    Aug 29, 2018

  • AUSIMM
    Microbial Aspects of Environmentally Benign Iron Ore

    Many types of micro-organisms inhabit iron ore deposits contributing to biogenic formation and conversion of iron oxides and associated minerals. Bacteria such as Paenibacillus polymyxa are capable of

    Jan 1, 2009

  • AUSIMM
    Developments of Pasminco Mining's South Concentrator

    At Pasminco Mining's South concentrator. which was commissioned in 1952. an expansion. modernisation and efficiency improvement program commenced in 1986 with a coarse ore stockpile and grinding

    Jan 1, 1991

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Red Dome Mine Closure - Addressing Mine Site Contamination Issues for Lease Relinquishment

    By S Logan, J Pu, J Milsom, G McDonald

    Management of environmental issues is an integral part of the mine decommissioning process. In Queensland, miners must comply with environmental aspects of the Mineral Resources Act and Contaminated L

    Jan 1, 1998

  • AUSIMM
    An innovative application of gravity separation technology to beneficiate ultrafine iron ore

    By J Lyons, M Hasan, D Pepper, C Vadeikis

    Processing of large volumes of ultrafine ores has long challenged mineral processing operators because of lower recoveries and increased tailings. This has led to many deposits, or parts of existing d

    Nov 8, 2021

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022