Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Evolution of Cut and Fill Mining at Isa MineBy Wright J
Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t
Jan 1, 1988
-
Oxygen Requirements and Monitoring for Gold Ore ProcessingBy Komosa T, Muir D. M
Adequate levels of dissolved oxygen are essential for efficient gold dissolu- tion. The actual levels in plantpuips can be seriously reduced by the presence of oxygen consuming reactive minerals, and
Jan 1, 1991
-
Extraction of gold from Stibnite OresBy Yan D. S
The removal of antimony from a refractory gold-bearing stibnite ore by roasting and selective chlorinating roasting was investigated. The influence of roasting temperature, roasting time, roasting a
Jan 1, 1995
-
Good Data-A Requirement For A Good ReserveQuite often the reserve assessor becomes enamored with the numbers gen- erated and forgets the basis for his assessment. The quality of the assess- ment can only be as good as the quality of the in
Jan 1, 1979
-
Equivalent Rock Column Design System for Tunnel Liners and Underground Structures Incorporating Rock RestraintAn approximate rapid design system for tunnel liners and underground structures is presented which permits the effects of structure geometry and stiffness, rock quality in terms of its deformation
Jan 1, 1976
-
Fragmentation Monitoring of Production Blasts at MRICABy Abrahamsson S, Niklasson B
In a follow-up of 12 production blasts in a quarry at the Mrica project on Java, tightly spaced porous bands were found to govern fragmentation to the extent that the average fragment size k5o was n
Jan 1, 1990
-
Site Investigation Drilling on the Derwent RiverBy Billingham R
The Department of Mines Tasmania employs a Drilling Section for specialised drilling re- quired by government and semi-government bodies. The section has a complement of nine crews oper- ating auger
Jan 1, 1977
-
Analysis of Lead/Zinc Concentrator Flotation Performance at Mount Isa Mines LimitedBy Watsford RMS, Wickham P
In October 1980 the two existing flotation circuits were combined into a single new circuit. This circuit used modern 11.3 m3 flotation cells which replaced 1.4 m3 units. Sometime after this change
Jan 1, 1978
-
Design of Hydraulic Backfill Distribution Systems - Lessons From Case StudiesBy D Gericke, R Cooke
This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an
Jan 1, 1998
-
Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit DesignsBy Mogi G, Akaike A, Yamaguchi U
A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met
Jan 1, 1995
-
Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken HillBy de Bruin J H
A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan
Jan 1, 1993
-
Silverton and Talisker MineMy forebears migrated to South Australia in the 1830s, 1840s and 1850s. All of them were literate but, because they moved about South Australia looking for work, family papers have become scat- ter
Jan 1, 1987
-
Coal and Minerals Comminution with High Pressure Waterjet AssistanceBy Galecki G
The investigations conducted in the High Pressure Lab at the University of Missouri-Rolla demonstrated the ability of high pressure waterjets to excavate coal and minerals, disintegrate materials an
Jan 1, 1993
-
The Halloysite Clays of Northland, New Zealand (8b1b7779-6b27-407c-8df6-0530480970df)By Townsend MG, Evans RB
In Northland, New Zealand, localised large deposits of halloysite clay have been produced by in-situ alteration of rhyolite volcanics of Pliocene or Pleistocene age, which were erupted through pre- Pl
Jan 1, 1990
-
Surface Mining TechniquesStrip mining offers the advantages of high productivity from both human and capital resources as well as high rates of production. Experience suggests that it will be advantageous to extend strip min
Jan 1, 1975
-
Tight slot blasting for routine fault-slip seismicity control at Mt Charlotte MineBy P Mikula, R Geranmayeh, R Carlton, M Ferguson, R Whiting
The concept of using specially designed slot blasts to mine through stress abutments that intersect faults, while controlling fault-slip seismicity, has come of age at Mt Charlotte Mine. Due to the hi
Nov 29, 2022
-
High-resolution erosion modelling using the RUSLE – an application to open cut coalmine operationsBy C M. Côte, P Bolz, R Chrystal
The design of final landforms is an integral part of mine closure plans in Queensland and aims to ensure the rehabilitated land is safe, stable and non-polluting. Landform stability in this context is
Aug 2, 2023
-
Mine Environment Monitoring - So what has Changed Since Moura No 2?By D Cliff
"It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ
Jun 1, 2012
-
A Forgotten Legacy of Gold Mining: Archival Research Leads to the Location and Identification of Gold-Bearing Mining ResidueGold was discovered in the Bendigo area of Victoria in 1851 (Willman and Wilkinson, 1993), and all the early gold mining of any note involved washing (puddling) the gold out of the regolith or allu
Jan 1, 1997
-
Contributed Discussion to "The Nickel Copper Deposit at Radio Hill, Karratha, Western Australia" by De Angelis, Hoyle, Peters and Wightman (Bulletin and Proceedings Vol 292, June 1987)I offer some comments which might complement the valuable recent paper by De Angelis et al (1987), on the newly discovered nickel-copper deposit at Radio Hill.The authors have accepted subdivisions an
Jan 1, 1988