Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Big Bell Coming Back for Seconds, Thirds and Fourths

    In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t

    Jan 1, 1998

  • AUSIMM
    The evolution of seismicity and ground control measures at Ernest Henry Mine

    By H Esterhuizen

    The Ernest Henry Mine (EHM) in Queensland, Australia is a Sub-level Caving operation that started production below the previously mined open pit at a depth of 535m. Current Production mining has progr

    Nov 30, 2018

  • AUSIMM
    Characterisation and Beneficiation of Low-Grade Indian Iron Ore Fines

    By P K. Banerjee, S Kumar

    Indian iron ores with less than 62 per cent Fe are currently unexploited, except for a few sectors which export them to foreign countries. It is anticipated that by 2012 the countryÆs domestic steel p

    Jan 1, 2007

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Bulk Solids Sampling

    By J E. Powalisz

    Obtaining a representative sample of bulk materials in process industries is critical to providing valid data for process control and custody transfer (valuation). The accuracy of a sample, that is to

    Jul 29, 2014

  • AUSIMM
    Engineering Tools for Design, Analysis and Information Management Applied to Underground Drilling and Blasting

    By D La Rosa, G Power, K Riihioja

    In underground mining, the often unpredictable variability in ground conditions may lead to the application of suboptimal drilling and blasting patterns, resulting in poor performance. Experience and

    Jan 1, 2001

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    Evaluation of thermal conductivities of molten SiO2-Al2O3-CaO slags

    By M Zhu, G Tranell, J You, K Tang, X Ma

    The thermal conductivity of slag is critical for the efficiency of high temperature metallurgical processes such as the smelting reduction of ferroalloys, the ladle refining and the continuous casting

    Aug 21, 2024

  • AUSIMM
    Mist Diffusion Experiment and Evaluation of Water Tube for Blasting Demolition Dust Control

    By H-S Yang, H Park, S-J Kim, Y-H Ko, H-S Kim, S-H Cho, J-K Kim

    An investigation was undertaken to devise a new method for reducing dust spread during blasting demolition utilising water tube and detonating cord. Modelling of smooth particle hydrodynamics (SPH) wi

    Aug 24, 2015

  • AUSIMM
    Dynamic Simulation as a Test Bed for Emerging Technologies

    The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro

    Sep 26, 2011

  • AUSIMM
    A Brief Resume of the Smelting Plant

    THE Company's smelting equipment consists of three blast furnaces, supplied with blast from two sets of vertical piston blowers, each capable of delivering 8000 cub. ft. of air per minute at a pr

    Jan 1, 1918

  • AUSIMM
    Application of enterprise optimisation considering ultra high intensity blasting

    By J Pan

    This case study assesses the application of Mine-to-Mill optimisation combined with Whittle Consulting’s Prober<sup>®</sup> economic optimisation for the purpose of economic value upl

    Nov 21, 2018

  • AUSIMM
    Generation of 3D planar failure hazard maps for pit slope management

    By D E. Tennant

    In the fields of geotechnical engineering and slope management, various software packages are used to assess the behaviour or propensity for a slope to fail. Traditional kinematic analysis calculates

    Nov 29, 2022

  • AUSIMM
    Waste batteries – are you prepared for the coming avalanche?

    By D Bush, F Goddard

    The electrification of Australian mine sites will see a boom in the use of batteries of all chemistries. Lead acid batteries, a traditional mainstay of the mining industry, are expected to nearly doub

    Apr 16, 2024

  • AUSIMM
    Tapping Water by Diamond Drill Holes

    ON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level

    Jan 1, 1919

  • AUSIMM
    Biodegradation of manganese dioxide tailings

    By Madgwick J. C

    Microaerobic biodegradation oflow-grade manganese dioxide slurry tailings was demonstrated in enrichment cultures treated with dilute molasses at 30°C and pH 5·8. Supplementary nitrogenous n

    Jan 1, 1986

  • AUSIMM
    The Kermadec Arc, New Zealand - A Ten-Year Odyssey of Discovery Along the World's Most Hydrothermally Active Intraoceanic Arc

    Research cruises dedicated to seafloor hydrothermal activity along the Kermadec arc first began with the Sonne-135 expedition in 1998. This was followed by the worldÆs first systematic survey for vent

    Jan 1, 2008

  • AUSIMM
    Developments at the Rosebery Concentrator of the Electrolytic Zinc Co. of Australasia Ltd.

    Previous published papers by Fraser (1), Hey (2), and Stillwell (3), have given respectively, details of:-1. The practice in the pilot plant operated at Zeehan for the treatment of ores from the Roseb

    Jan 1, 1949

  • AUSIMM
    Consultation with Tangata Whenua

    By C N. Whata

    While there is no specific obligation on the part of any applicant to consult directly with tangata whenua (people of the land), recent cases highlight the need to engage in active consultation in ord

    Jan 1, 1997

  • AUSIMM
    Metallothermic Reduction of Magnese-Bearing Slags

    By W J. Rankin, D R. Swinbourne

    There are large tonnages of low-grade manganese ores in India fromwhich it is uneconomic to produce ferroalloys by conventionalsubmerged arc furnace smelting. A possible way to utilise these ores is t

    Jan 1, 1998